- Plumbing system / repair (Critical) (corrected on site)
Plumbing system(s) not maintained in good repair.
Correction: Plumbing system(s) shall be repaired and maintained.
Comments: 2nd floor banquet prep area: hand sink not working. Repair.CORRECTED ON SITE, thank you,
Location: -
Equipment: Hand sink
- Equipment repair
Equipment in need of repair.
Correction: Equipment shall be maintained in good repair and condition.
Comments: 1. Basement banquet prep area: walk-in cooler down after pipes froze during recent bad weather. Only beer and bottled water inside. Using other walk-ins until repairs can be made.2. 2nd floor banquet prep area: empty True reach-in cooler holding at 64. Chef will place repair order. Only used for brief cold holding during banquet prep.
Location: Basement
Equipment: Walk in cooler
- Equipment repair
Equipment in need of repair.
Correction: Equipment shall be maintained in good repair and condition.
Comments: 1. Basement banquet prep area: walk-in cooler down after pipes froze during recent bad weather. Only beer and bottled water inside. Using other walk-ins until repairs can be made.2. 2nd floor banquet prep area: empty True reach-in cooler holding at 64. Chef will place repair order. Only used for brief cold holding during banquet prep.
Location: -
Equipment: Reach in cooler
- Plumbing system/ repair (Non-Critical)
Plumbing system(s) not maintained in good repair.
Correction: Plumbing system(s) shall be repaired and maintained.
Comments: 1. Right hand sink in womens employee locker room out of order. Repair. Two other sinks avilable for use.
Location: Restroom
Equipment: Hand sink
|
02/04/2014 | Routine |
- Ice reuse (corrected on site)
Exterior cooling ice used for consumption.
Correction: Ice used as exterior coolant shall not be used for consumption.
Location: Kitchen
|
06/06/2013 | Routine |
- Hand sink temperature (corrected)
Hand washing facility water temperature below 100 degrees F.
Correction: Provide water having a temperature of at least 100 degrees F by means of a mixing valve. PLEASE ASSESS HOT WATER AT HAND SINK.
|
03/05/2013 | Recheck |
- Hand sink temperature
Hand washing facility water temperature below 100 degrees F.
Correction: Provide water having a temperature of at least 100 degrees F by means of a mixing valve. PLEASE ASSESS HOT WATER AT HAND SINK.
|
03/01/2013 | Recheck |
- Hand sink temperature
Hand washing facility water temperature below 100 degrees F.
Correction: Provide water having a temperature of at least 100 degrees F by means of a mixing valve. PLEASE ASSESS HOT WATER AT HAND SINK.
|
02/26/2013 | Routine |
- Drying mop(s) (corrected on site)
Improper drying of wet mop(s).
Correction: After use, mop(s) shall be placed in a position that allows them to air-dry without soiling wall(s), equipment, or supplies. HANG MOPS TO DRY WHEN NOT IN USE.
Location: Basement
|
08/21/2012 | Routine |
- Hand sink capacity (corrected)
Inadequate number of hand washing sinks. (Employee cafe dining room)
Correction: Provide adequate number of hand washing sinks.
Location: Dining room
Equipment: Hand sink
- Mops and brooms (corrected on site)
Maintenance tool(s) not stored in approved locations and/or manner. (Mop on floor by hand sink in banquet set up area in basement)
Correction: Store mop up off the floor when mop is not in use.
Comments: Corrected during inspection
Location: Basement
- Walls, floors, etc/soiled
Physical structure, floor soiled.
Correction: The physical facilities shall be cleaned as often as necessary to keep clean. Routine floor clean up in the walk in freezer in basement storage area.
Location: Walk-in freezer
- Hand sink temperature
Hand washing facility water temperature below 100 degrees F.
Correction: Provide water having a temperature of at least 100 degrees F at new hand sink in employee cafeteria dining room. A water heater will be installed in the very near future to provide hot water service at the hand sink. Correction in progress.
Comments: Temporary hand washing station set up in the employee cafeteria dining room at this time.
Location: Dining room
Equipment: Hand sink
|
02/27/2012 | Routine |
- Hand sink location blocked (corrected)
Hand washing facilities not properly located and/or accessible.
Correction: A hand washing facility shall be properly located and accessible at all times.
Comments: HAND SINK NOT AVAILABLE IN EMPLOYEE CAFE. NEAREST AVAILABLE IN WOMES LOCKER ROOM FORE THAN TWENTY FIVE FEET AWAY.
Location: Dining room
|
01/31/2012 | Super Bowl Recheck |
- Hand sink location blocked
Hand washing facilities not properly located and/or accessible.
Correction: A hand washing facility shall be properly located and accessible at all times.
Comments: HAND SINK NOT AVAILABLE IN EMPLOYEE CAFE. NEAREST AVAILABLE IN WOMES LOCKER ROOM FORE THAN TWENTY FIVE FEET AWAY.
Location: Dining room
|
01/30/2012 | Super Bowl Routine |
Restaurant representatives - add corrected or new information about 120 West Market Fresh Grill, 120 W MARKET ST, Indianapolis, IN »