BAR TENDER WAS USING UNCOVERED BEVERAGE CONTAINER BEHIND BAR. DISCONTINUE USING UNAPPROVED EMPLOYEE BEVERAGE CONTAINER.
(COS)
-
CLEAN BASEMENT STORAGE AREA , ESP. FLOORS, AND REMOVE UNNECESSARY ITEMS TO PREVENT RODENT HARBORAGE. (2-5)
-
CLEAN ICE MACHINE INTERIOR, ESP. RIGHT SIDE PLUMBING. COMPLY BY 2-5-09. (LEAKAGE REPAIR SHOULD BE COORDINATED WITH THIS CLEANING)
-
FLOORS NEED THOROUGH CLEANING UNDER: PIZZA FREEZER, ICE MAKER, AND PLASTIC DUNNAGE RACKS IN CENTER OF BASEMENT.
ALSO, WALLS OF KEG WALK-IN NEED CLEANING, ESP. AT BEER TUBING AND CONTROL VALVES.
-
KEG WALK-IN: WHITE CAULK ALONG SOME WALL/FLOOR JUNCTURES IS LOOSE OR ROUGH AND MUST BE REMOVED AS NEEDED AND MADE SMOOTH.
ADD CAULK ALONG RIGHT WALL,ETC. WHERE IT IS MISSING.
-
NEW BEER COOLER WAS ADDED AT THE BAR. REMOVE WOOD BLOCK BLOCKING UNDER COOLER AND PROVIDE 6" NSF APPROVED LEGS OR CASTERS (LOW RISE OK). ALL NEW EQUIPMENT MUST HAVE INSTALLATION APPROVED. COMPLY BY 6-1-09
-
PROVIDE FINGER NAIL BRUSH AT BAR HAND WASH SINK.
-
PROVIDE SHATTER RESISTANT BULBS FOR LIGHTS ABOVE BAR SINKS. (REPEAT VIOLATION FROM 1/19/05).
-
REMOVE TOWELS FROM IN WALKIN COOLER AND ICE MACHINE AREA. CLEAN FLOOR AREAS AS NEEDED. IF PLUMBING ISSUES EXIST, REPAIR PLUMBING. (ESP. ICE MAKER, BY 1-21-09).
-
REPAIR DUCT TAPED WALL SURFACE NEXT TO BEER COOLER AT BAR. THIS SURFACE IS IN POOR CONDITION. PROVIDE APPROVED FINISHES.
-
REPAIR LEAKING PIPE BELOW BEER TAP. DUE 2-5-09
-
REPAIR/REPLACE LEAKY ICE MAKER. THIS LEAKAGE MUST NOT CONTINUE.
-
WALKIN COOLER AND BACK BAR COUNTER / CABINETS ARE GRANDFATHERED AND SHOULD BE REPLACED IFTHEY ARE NO LONGER IN GOOD CONDITION AND MAINTAINED. (REPEAT FROM 2/19/03 AND 1/19/05). SEE COMMENTS.
|
Full
|
Jan 5, 2009
|
79 |
-
BAR TENDER WAS USING UNCOVERED BEVERAGE CONTAINER BEHIND BAR. DISCONTINUE USING UNAPPROVED EMPLOYEE BEVERAGE CONTAINER.
(COS)
-
CLEAN BASEMENT STORAGE AREA , ESP. FLOORS, AND REMOVE UNNECESSARY ITEMS TO PREVENT RODENT HARBORAGE. (2-5)
-
CLEAN ICE MACHINE INTERIOR, ESP. RIGHT SIDE PLUMBING. COMPLY BY 2-5-09. (LEAKAGE REPAIR SHOULD BE COORDINATED WITH THIS CLEANING)
-
FLOORS NEED THOROUGH CLEANING UNDER: PIZZA FREEZER, ICE MAKER, AND PLASTIC DUNNAGE RACKS IN CENTER OF BASEMENT.
ALSO, WALLS OF KEG WALK-IN NEED CLEANING, ESP. AT BEER TUBING AND CONTROL VALVES.
-
KEG WALK-IN: WHITE CAULK ALONG SOME WALL/FLOOR JUNCTURES IS LOOSE OR ROUGH AND MUST BE REMOVED AS NEEDED AND MADE SMOOTH.
ADD CAULK ALONG RIGHT WALL,ETC. WHERE IT IS MISSING.
-
NEW BEER COOLER WAS ADDED AT THE BAR. REMOVE WOOD BLOCK BLOCKING UNDER COOLER AND PROVIDE 6" NSF APPROVED LEGS OR CASTERS (LOW RISE OK). ALL NEW EQUIPMENT MUST HAVE INSTALLATION APPROVED. COMPLY BY 6-1-09
-
REMOVE TOWELS FROM IN WALKIN COOLER AND ICE MACHINE AREA. CLEAN FLOOR AREAS AS NEEDED. IF PLUMBING ISSUES EXIST, REPAIR PLUMBING. (ESP. ICE MAKER, BY 1-21-09).
-
REPAIR DUCT TAPED WALL SURFACE NEXT TO BEER COOLER AT BAR. THIS SURFACE IS IN POOR CONDITION. PROVIDE APPROVED FINISHES.
-
REPAIR LEAKING PIPE BELOW BEER TAP. DUE 2-5-09
-
REPAIR/REPLACE LEAKY ICE MAKER. THIS LEAKAGE MUST NOT CONTINUE.
-
WALKIN COOLER AND BACK BAR COUNTER / CABINETS ARE GRANDFATHERED AND SHOULD BE REPLACED IFTHEY ARE NO LONGER IN GOOD CONDITION AND MAINTAINED. (REPEAT FROM 2/19/03 AND 1/19/05). SEE COMMENTS.
|
Full
|
Jan 28, 2011
|
81 |
Restaurant representatives - add corrected or new information about Greystone Bar, 143 3rd St N, Bayport, MN 55003 »