Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for East Peoria, Illinois (IL)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 111Number of bridges
  • 1,686ft / 514mTotal length
  • $7,384,000Total costs
  • 1,444,575Total average daily traffic
  • 118,083Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for East Peoria
  • No street view available for this location

New bridges in East Peoria, IL - historical statistics
  • New bridges - historical statistics
  • 11920-1929
  • 41930-1939
  • 151950-1959
  • 221960-1969
  • 91970-1979
  • 131980-1989
  • 91990-1999
  • 302000-2009
  • 62010-2019
  • 22020-2022
Reconstructed bridges in East Peoria, IL - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 21970-1979
  • 41980-1989
  • 41990-1999
  • 42000-2009
  • 22010-2019
Average Bridge Daily Traffic in East Peoria, IL
Average Bridge Truck Traffic in East Peoria, IL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 1.5%Excellent
  • 1.5%Very good
  • 16.9%Good
  • 26.2%Satisfactory
  • 41.5%Fair
  • 9.2%Poor
  • 3.1%Serious
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 1.5%Excellent
  • 16.9%Very good
  • 13.8%Good
  • 20.0%Satisfactory
  • 24.6%Fair
  • 21.5%Poor
  • 1.5%Serious
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 1.5%Excellent
  • 16.9%Very good
  • 43.1%Good
  • 21.5%Satisfactory
  • 10.8%Fair
  • 3.1%Poor
  • 1.5%Serious
  • 1.5%Critical
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 7.3%Excellent
  • 29.3%Very good
  • 31.7%Good
  • 19.5%Satisfactory
  • 2.4%Fair
  • 4.9%Poor
  • 4.9%Serious
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 25.0%Very good
  • 37.5%Good
  • 25.0%Fair
  • 12.5%Poor
Find on map >>   Show street view

Structure Number: 900044,  Location: N CAMP ST, E PEORIA (Lat: 40.678400,  Lng: -89.585739),  Route carried "under" structure: Other road ,  Year Built: 1959,  Structure Length: 0. m,  Average Daily Traffic: 13,200 (year 2018),  Truck Traffic: 4%,  Features Intersected: CAMP ST,  Facility Carried by Structure: RIVERFRONT DR
Minimum Vertical Clearance: 6.60m (21.65ft),  Kilometerpoint: 0.676,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.3m (106.0ft)

Find on map >>   Show street view

Structure Number: 900046,  Location: .5 MI SW OF I-74 (Lat: 40.678161,  Lng: -89.588800),  Route carried "under" structure: Other road ,  Year Built: 1958,  Structure Length: 0. m,  Average Daily Traffic: 9,650 (year 2018),  Truck Traffic: 6%,  Features Intersected: WEST WASHINGTON ST,  Facility Carried by Structure: RIVERFRONT DR
Minimum Vertical Clearance: 4.60m (15.09ft),  Kilometerpoint: 0.225,  Lanes on structure: 2,  Lanes under structure: 3,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 25.6m (84.0ft)

Find on map >>   Show street view

Structure Number: 900069,  Location: INTERCHANGE (Lat: 40.717111,  Lng: -89.528197),  Route carried "under" structure: State highway 116,  Year Built: 1964,  Structure Length: 0. m,  Average Daily Traffic: 21,200 (year 2021),  Truck Traffic: 4%,  Features Intersected: ILL 116
Minimum Vertical Clearance: 5.11m (16.77ft),  Kilometerpoint: 135.809,  Lanes on structure: 1,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 17.8m (58.4ft)

Find on map >>   Show street view

Structure Number: 900071,  Location: INTERCHANGE 24&116 (Lat: 40.715128,  Lng: -89.529317),  Route carried "under" structure: US 24,  Year Built: 1962,  Structure Length: 0. m,  Average Daily Traffic: 20,400 (year 2021),  Truck Traffic: 8%,  Features Intersected: ILL 116
Minimum Vertical Clearance: 5.77m (18.93ft),  Kilometerpoint: 218.994,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 23.2m (76.1ft)

Find on map >>   Show street view

Structure Number: 900072,  Location: INTERCHANGE RT24&116 (Lat: 40.715303,  Lng: -89.529222),  Route carried "under" structure: State highway 116,  Year Built: 1962,  Structure Length: 0. m,  Average Daily Traffic: 21,200 (year 2021),  Truck Traffic: 4%,  Features Intersected: ILL 116,  Facility Carried by Structure: WB US 24
Minimum Vertical Clearance: 5.77m (18.93ft),  Kilometerpoint: 135.600,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 23.2m (76.1ft)

Find on map >>   Show street view

Structure Number: 900073,  Location: .75mi E McClugage Br (Lat: 40.715050,  Lng: -89.526281),  Route carried "under" structure: Other road ,  Year Built: 1961,  Structure Length: 0. m,  Average Daily Traffic: 3,500 (year 2018),  Truck Traffic: 5%,  Features Intersected: RAMP FR ILL116 TO150,  Facility Carried by Structure: EB US 24
Minimum Vertical Clearance: 4.47m (14.67ft),  Kilometerpoint: 0.257,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 13.4m (44.0ft)

Find on map >>   Show street view

Structure Number: 900074,  Location: .75mi E McClugage Br (Lat: 40.715178,  Lng: -89.526314),  Route carried "under" structure: Other road ,  Year Built: 1961,  Structure Length: 0. m,  Average Daily Traffic: 3,500 (year 2018),  Truck Traffic: 5%,  Features Intersected: RAMP FR IL116 TO 150,  Facility Carried by Structure: WB US 24
Minimum Vertical Clearance: 4.78m (15.68ft),  Kilometerpoint: 0.274,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 12.5m (41.0ft)

Find on map >>   Show street view

Structure Number: 900089,  Location: JUST E ILL-116 INTER (Lat: 40.668717,  Lng: -89.572603),  Route carried "under" structure: Interstate 74,  Year Built: 1958,  Structure Length: 0. m,  Average Daily Traffic: 37,300 (year 2021),  Truck Traffic: 10%,  Features Intersected: I-74,  Facility Carried by Structure: FONDULAC DR
Minimum Vertical Clearance: 16.61m (54.49ft),  Kilometerpoint: 156.150,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Steel continuous,  Design/Construction: Truss - Deck,  Length of Maximum Span: 73.2m (240.2ft)

Find on map >>   Show street view

Structure Number: 900102,  Location: 2 MI W OF MORTON (Lat: 40.633964,  Lng: -89.520881),  Route carried "under" structure: Interstate 74,  Year Built: 1979,  Structure Length: 0. m,  Average Daily Traffic: 35,100 (year 2021),  Truck Traffic: 13%,  Features Intersected: EB I-74
Minimum Vertical Clearance: 5.21m (17.09ft),  Kilometerpoint: 162.185,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 54.3m (178.1ft)

Find on map >>   Show street view

Structure Number: 900103,  Location: NEAR CTR 10 GROVELND (Lat: 40.631831,  Lng: -89.541175),  Route carried "under" structure: Interstate 474,  Year Built: 1979,  Structure Length: 0. m,  Average Daily Traffic: 17,000 (year 2021),  Truck Traffic: 22%,  Features Intersected: I-474,  Facility Carried by Structure: FAU 6720 (PINECRES
Minimum Vertical Clearance: 4.83m (15.85ft),  Kilometerpoint: 21.532,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 29.9m (98.1ft)

Find on map >>   Show street view

Structure Number: 900104,  Location: .3 MI N OF MULLER RD (Lat: 40.631000,  Lng: -89.550917),  Route carried "under" structure: Interstate 474,  Year Built: 1972,  Structure Length: 0. m,  Average Daily Traffic: 17,000 (year 2021),  Truck Traffic: 22%,  Features Intersected: I-474,  Facility Carried by Structure: SPFLD RD FAU 6719
Minimum Vertical Clearance: 5.66m (18.57ft),  Kilometerpoint: 20.680,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 27.4m (89.9ft)

Find on map >>   Show street view

Structure Number: 900105,  Location: 0.25 MI N MULLER RD (Lat: 40.630161,  Lng: -89.569661),  Route carried "under" structure: Interstate 474,  Year Built: 1972,  Structure Length: 0. m,  Average Daily Traffic: 17,000 (year 2021),  Truck Traffic: 22%,  Features Intersected: I-474,  Facility Carried by Structure: COLE ST
Minimum Vertical Clearance: 5.21m (17.09ft),  Kilometerpoint: 19.118,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 26.8m (87.9ft)

Find on map >>   Show street view

Structure Number: 900116,  Location: 1.5 MI W OF I-155 (Lat: 40.629400,  Lng: -89.507825),  Route carried "under" structure: Interstate 74,  Year Built: 1980,  Structure Length: 0. m,  Average Daily Traffic: 49,400 (year 2021),  Truck Traffic: 14%,  Features Intersected: I-74,  Facility Carried by Structure: Pleasant Hill Road
Minimum Vertical Clearance: 4.98m (16.34ft),  Kilometerpoint: 163.376,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 39.3m (128.9ft)

Find on map >>   Show street view

Structure Number: 900117,  Location: 1 MI W OF I-155 (Lat: 40.626675,  Lng: -89.501419),  Route carried "under" structure: Interstate 74,  Year Built: 1980,  Structure Length: 0. m,  Average Daily Traffic: 49,400 (year 2021),  Truck Traffic: 14%,  Features Intersected: I-74,  Facility Carried by Structure: Muller Road
Minimum Vertical Clearance: 5.26m (17.26ft),  Kilometerpoint: 164.004,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 52.7m (172.9ft)

Find on map >>   Show street view

Structure Number: 900118,  Location: 3 MI NW OF MORTON (Lat: 40.632806,  Lng: -89.529044),  Route carried "under" structure: Interstate 474,  Year Built: 1980,  Structure Length: 0. m,  Average Daily Traffic: 15,800 (year 2021),  Truck Traffic: 24%,  Features Intersected: WB I-474
Minimum Vertical Clearance: 5.36m (17.59ft),  Kilometerpoint: 22.562,  Lanes on structure: 1,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 56.1m (184.1ft)

Find on map >>   Show street view

Structure Number: 900119,  Location: 3.5 MI E OF E. PEO. (Lat: 40.636439,  Lng: -89.524889),  Route carried "under" structure: Interstate 74,  Year Built: 1980,  Structure Length: 0. m,  Average Daily Traffic: 35,100 (year 2021),  Truck Traffic: 13%,  Features Intersected: I-74
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 161.702,  Lanes on structure: 1,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 41.8m (137.1ft)

Find on map >>   Show street view

Structure Number: 900124,  Location: 0.5 MI E. GRANGE RD (Lat: 40.716119,  Lng: -89.471928),  Route carried "under" structure: US 24,  Year Built: 1988,  Structure Length: 0. m,  Average Daily Traffic: 13,900 (year 2021),  Truck Traffic: 5%,  Features Intersected: US 24
Minimum Vertical Clearance: 4.93m (16.17ft),  Kilometerpoint: 223.870,  Lanes on structure: 1,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 39.3m (128.9ft)

Find on map >>   Show street view

Structure Number: 900152,  Location: EAST PEORIA (Lat: 40.681406,  Lng: -89.581136),  Route carried "under" structure: Interstate 74,  Year Built: 2004,  Structure Length: 0. m,  Average Daily Traffic: 52,800 (year 2021),  Truck Traffic: 7%,  Features Intersected: I-74,  Facility Carried by Structure: FAP 404
Minimum Vertical Clearance: 5.61m (18.41ft),  Kilometerpoint: 154.589,  Lanes on structure: 1,  Lanes under structure: 5,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 28.8m (94.5ft)

Find on map >>   Show street view

Structure Number: 900153,  Location: EAST PEORIA (Lat: 40.679306,  Lng: -89.580072),  Route carried "under" structure: Interstate 74,  Year Built: 2004,  Structure Length: 0. m,  Average Daily Traffic: 52,100 (year 2021),  Truck Traffic: 7%,  Features Intersected: RMPS H-1,4 DIVR CHAN
Minimum Vertical Clearance: 4.90m (16.08ft),  Kilometerpoint: 154.799,  Lanes on structure: 2,  Lanes under structure: 5,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 71.7m (235.2ft)

Find on map >>   Show street view

Structure Number: 900155,  Location: 0.03 MI W OF US 116 (Lat: 40.670189,  Lng: -89.574003),  Route carried "under" structure: US 24,  Year Built: 2005,  Structure Length: 0. m,  Average Daily Traffic: 25,000 (year 2021),  Truck Traffic: 5%,  Features Intersected: MAIN ST & RAMP 1.71,  Facility Carried by Structure: 74EB TO EB CAMP ST
Minimum Vertical Clearance: 4.88m (16.01ft),  Kilometerpoint: 212.572,  Lanes on structure: 1,  Lanes under structure: 8,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 42.1m (138.1ft)

Find on map >>   Show street view

Structure Number: 900156,  Location: 0.02 MI NE 74 (Lat: 40.670517,  Lng: -89.573419),  Route carried "under" structure: US 24,  Year Built: 2006,  Structure Length: 0. m,  Average Daily Traffic: 24,500 (year 2021),  Truck Traffic: 7%,  Features Intersected: MAINST&WB74TONBSB116,  Facility Carried by Structure: CAMP ST TO WB 74
Minimum Vertical Clearance: 5.23m (17.16ft),  Kilometerpoint: 212.669,  Lanes on structure: 1,  Lanes under structure: 8,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 57.5m (188.6ft)

Find on map >>   Show street view

Structure Number: 900156,  Location: 0.02 MI NE 74 (Lat: 40.669481,  Lng: -89.572617),  Route carried "under" structure: Other road ,  Year Built: 2006,  Structure Length: 0. m,  Average Daily Traffic: 4,200 (year 2018),  Truck Traffic: 11%,  Features Intersected: MAINST&WB74TONBSB116,  Facility Carried by Structure: CAMP ST TO WB 74
Minimum Vertical Clearance: 5.36m (17.59ft),  Kilometerpoint: 0.225,  Lanes on structure: 1,  Lanes under structure: 1,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 57.5m (188.6ft)

Find on map >>   Show street view

Structure Number: 900157,  Location: .25 MI E JCT US 116 (Lat: 40.666383,  Lng: -89.571817),  Route carried "under" structure: US 150,  Year Built: 2005,  Structure Length: 0. m,  Average Daily Traffic: 12,500 (year 2021),  Truck Traffic: 3%,  Features Intersected: WB US 150,  Facility Carried by Structure: EXIT TO CAMP ST
Minimum Vertical Clearance: 4.45m (14.60ft),  Kilometerpoint: 152.755,  Lanes on structure: 1,  Lanes under structure: 1,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 22.6m (74.1ft)

Find on map >>   Show street view

Structure Number: 900159,  Location: .25 MI W OF ILL 116 (Lat: 40.673292,  Lng: -89.575617),  Route carried "under" structure: City street ,  Year Built: 2006,  Structure Length: 0. m,  Average Daily Traffic: 275 (year 2018),  Truck Traffic: 25%,  Features Intersected: ALTORFER LA&TP&W RR,  Facility Carried by Structure: WB I-74
Minimum Vertical Clearance: 6.93m (22.74ft),  Kilometerpoint: 0.869,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 25.7m (84.3ft)

Find on map >>   Show street view

Structure Number: 90016,  Location: ILL 116 INTERCHANGE (Lat: 40.670308,  Lng: -89.573786),  Route carried "under" structure: US 24,  Year Built: 2006,  Structure Length: 0. m,  Average Daily Traffic: 25,000 (year 2021),  Truck Traffic: 5%,  Features Intersected: ILL 116 (MAIN ST),  Facility Carried by Structure: WB I-74
Minimum Vertical Clearance: 4.80m (15.75ft),  Kilometerpoint: 212.621,  Lanes on structure: 2,  Lanes under structure: 8,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 29.5m (96.8ft)

Find on map >>   Show street view

Structure Number: 900161,  Location: ILL 116 INTERCHANGE (Lat: 40.670228,  Lng: -89.573936),  Route carried "under" structure: US 24,  Year Built: 2005,  Structure Length: 0. m,  Average Daily Traffic: 25,000 (year 2021),  Truck Traffic: 5%,  Features Intersected: ILL 116(MAIN ST),  Facility Carried by Structure: EB I-74
Minimum Vertical Clearance: 4.80m (15.75ft),  Kilometerpoint: 212.589,  Lanes on structure: 4,  Lanes under structure: 8,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 29.1m (95.5ft)

Find on map >>   Show street view

Structure Number: 900162,  Location: ILL 8 INTER,E PEORIA (Lat: 40.663875,  Lng: -89.569097),  Route carried "under" structure: Other road ,  Year Built: 2005,  Structure Length: 0. m,  Average Daily Traffic: 10,700 (year 2018),  Truck Traffic: 3%,  Features Intersected: E WASHINGTON, TAYLOR,  Facility Carried by Structure: EB I-74,RP L-1
Minimum Vertical Clearance: 5.94m (19.49ft),  Kilometerpoint: 2.092,  Lanes on structure: 3,  Lanes under structure: 6,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 34.8m (114.2ft)

Find on map >>   Show street view

Structure Number: 900162,  Location: ILL 8 INTER,E PEORIA (Lat: 40.663975,  Lng: -89.569317),  Route carried "under" structure: City street ,  Year Built: 2005,  Structure Length: 0. m,  Average Daily Traffic: 950 (year 2018),  Truck Traffic: 7%,  Features Intersected: E WASHINGTON, TAYLOR,  Facility Carried by Structure: EB I-74,RP L-1
Minimum Vertical Clearance: 5.94m (19.49ft),  Kilometerpoint: 0.740,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 34.8m (114.2ft)

Find on map >>   Show street view

Structure Number: 900163,  Location: ILL 8 INTER,E PEORIA (Lat: 40.664019,  Lng: -89.568728),  Route carried "under" structure: Other road ,  Year Built: 2006,  Structure Length: 0. m,  Average Daily Traffic: 10,700 (year 2018),  Truck Traffic: 3%,  Features Intersected: E WASHINGTON, TAYLOR,  Facility Carried by Structure: WB I-74,RP L-4
Minimum Vertical Clearance: 5.94m (19.49ft),  Kilometerpoint: 2.124,  Lanes on structure: 3,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 35.1m (115.2ft)

Find on map >>   Show street view

Structure Number: 900163,  Location: ILL 8 INTER,E PEORIA (Lat: 40.664025,  Lng: -89.569200),  Route carried "under" structure: City street ,  Year Built: 2006,  Structure Length: 0. m,  Average Daily Traffic: 950 (year 2018),  Truck Traffic: 7%,  Features Intersected: E WASHINGTON, TAYLOR,  Facility Carried by Structure: WB I-74,RP L-4
Minimum Vertical Clearance: 5.94m (19.49ft),  Kilometerpoint: 0.756,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 35.1m (115.2ft)

Find on map >>   Show street view

Structure Number: 900181,  Location: PINECREST DR. (Lat: 40.643100,  Lng: -89.540553),  Route carried "under" structure: Interstate 74,  Year Built: 2021,  Structure Length: 0. m,  Average Daily Traffic: 35,100 (year 2021),  Truck Traffic: 13%,  Features Intersected: I-74,  Facility Carried by Structure: PINECREST DR.
Minimum Vertical Clearance: 5.21m (17.09ft),  Kilometerpoint: 160.206,  Lanes on structure: 3,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 0.0m

Discuss East Peoria, Illinois (IL) on our hugely popular Illinois forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.