Bridge Statistics for Providence, Rhode Island (RI) - Condition, Traffic, Stress, Structural Evaluation, Project Costs

Back to: Providence, RI, Rhode Island, Rhode Island forum, All US cities.





Parts: 1, 2, 3, 4, 5


National Bridge Inventory (NBI) Statistics
Number of bridges: 261
Total length: 3,216 meters (10,551ft)
Total costs: $733,079,000
Total average daily traffic: 8,457,883
Total average daily truck traffic: 818,437
National Bridge Inventory (NBI) Registered Bridges for Providence

New bridges - Historical Statistics

  • Before 1900: 7
  • 1900-1909: 5
  • 1910-1919: 5
  • 1920-1929: 2
  • 1930-1939: 6
  • 1940-1949: 0
  • 1950-1959: 47
  • 1960-1969: 77
  • 1970-1979: 16
  • 1980-1989: 42
  • 1990-1999: 18
  • 2000-2010: 36

Reconstructed bridges - Historical Statistics

  • 1940-1949: 1
  • 1950-1959: 0
  • 1960-1969: 1
  • 1970-1979: 12
  • 1980-1989: 19
  • 1990-1999: 9
  • 2000-2010: 2

Average Daily Traffic

Bridge Condition - Deck

Bridge Condition - Superstructure

Bridge Condition - Substructure

Bridge Condition - Channel

Bridge Condition - Culverts

Find on map >>

Structure Number: 78,  Location: 2.5 Mi S of JCT US 44 (Lat: 41.831667,  Lng: -71.470833),  Route carried "on" structure: Alternate City street ,  Year Built: 1913,  Year Reconstructed: 2001,  Status: Posted for load,  Structure Length: 1.98m (6.50ft),  Average Daily Traffic: 18,600 (year 1999),  Truck Traffic: 10%,  Average Future Daily Traffic: 23,600 (year 2028),  Design Load: HS 25,  Features Intersected: WOONASQUATUCKET RIVER,  Facility Carried by Structure: MANTON AV
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 6 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.6m (61.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 15.8m (51.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 13.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 82.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2009,  Bridge Improvement Cost: $659,000,  Roadway Improvement Cost: $66,000,  Total Project Cost: $989,000 ( Estimate for 2009),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 131,  Location: 0.8 Mi E JCT US 1 & RI 2 (Lat: 41.787833,  Lng: -71.419833),  Route carried "on" structure: Alternate US 1,  Year Built: 1961,  Status: Open,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 17,400 (year 2008),  Truck Traffic: 10%,  Average Future Daily Traffic: 24,360 (year 2028),  Design Load: HS 20,  Features Intersected: HAR JUNC BR LINE P&W RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Base Highway Network: Yes (,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 18.3m (60.0ft),  Skew: 15 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.8m (32.2ft),  Curb or Sidewalk Widths: Left: 2.4m (7.9ft),  Right: 2.4m (7.9ft),  Curb-To-Curb Width: 18.3m (60.0ft),  Out-to-Out Width: 24.6m (80.7ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Satisfactory,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 31.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.10m (3.61ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: July 2009,  Other Special Inspection Date: July 2009,  Bridge Improvement Cost: $1,133,000,  Roadway Improvement Cost: $113,000,  Total Project Cost: $1,700,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>

Structure Number: 142,  Location: 0.2 Mi E of No Main St (Lat: 41.843833,  Lng: -71.405000),  Route carried "on" structure: Other road ,  Year Built: 1935,  Status: Open,  Structure Length: 1.65m (5.41ft),  Average Daily Traffic: 1 (year 2008),  Average Future Daily Traffic: 2 (year 2028),  Design Load: HS 20,  Features Intersected: Cypress St,  Facility Carried by Structure: Ped O-P
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes under structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 2.4m (7.9ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.5m (50.9ft),  Curb-To-Curb Width: 2.4m (7.9ft),  Out-to-Out Width: 3.1m (10.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 0.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 0.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.65m (5.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2009,  Bridge Improvement Cost: $106,000,  Roadway Improvement Cost: $11,000,  Total Project Cost: $159,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 327,  Location: 0.1 Mi S of JCT US 1 (Lat: 41.796167,  Lng: -71.425833),  Route carried "on" structure: State highway 2,  Year Built: 1936,  Status: Temporarily open,  Structure Length: 4.97m (16.31ft),  Average Daily Traffic: 10,876 (year 1996),  Truck Traffic: 10%,  Average Future Daily Traffic: 13,752 (year 2028),  Design Load: HS 20,  Features Intersected: AMTRAK & P&W RRs
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Base Highway Network: Yes (,  Subroute: 1),  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Skew: 4 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 15.2m (49.9ft),  Curb or Sidewalk Widths: Left: 2.7m (8.9ft),  Right: 2.7m (8.9ft),  Curb-To-Curb Width: 14.6m (47.9ft),  Out-to-Out Width: 20.7m (67.9ft)

Condition: Deck: Serious,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 14.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 87.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 4.97m (16.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2009,  Bridge Improvement Cost: $4,716,000,  Roadway Improvement Cost: $472,000,  Total Project Cost: $7,074,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 348,  Location: 0.1 Mi N of JCT US 6 (Lat: 41.860500,  Lng: -71.466667),  Route carried "on" structure: City street ,  Year Built: 1974,  Status: Open,  Structure Length: 5.18m (16.99ft),  Average Daily Traffic: 16,500 (year 2008),  Truck Traffic: 10%,  Average Future Daily Traffic: 19,800 (year 2028),  Design Load: HS 20,  Features Intersected: WOONASQUATUCKET RIVER,  Facility Carried by Structure: GLENBRIDGE AV
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 50.6m (166.0ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 93.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 56.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 5.18m (16.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 10,  Bridge Improvement Cost: $869,000,  Roadway Improvement Cost: $87,000,  Total Project Cost: $1,304,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 402,  Location: 0.1 Mi W of Valley St (Lat: 41.819167,  Lng: -71.442167),  Route carried "on" structure: City street ,  Year Built: 1888,  Year Reconstructed: 1987,  Status: Open,  Structure Length: 1.74m (5.71ft),  Average Daily Traffic: 5,470 (year 1996),  Truck Traffic: 10%,  Average Future Daily Traffic: 6,754 (year 2028),  Design Load: HS 20,  Features Intersected: WOONASQUATUCKET RIVER,  Facility Carried by Structure: DELAINE ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.8m (55.1ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.74m (5.71ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2009,  Bridge Improvement Cost: $340,000,  Roadway Improvement Cost: $34,000,  Total Project Cost: $510,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 428,  Location: 2.0 Mi N of JCT I-95 (Lat: 41.853667,  Lng: -71.425833),  Route carried "on" structure: State highway 146,  Year Built: 1957,  Year Reconstructed: 1989,  Status: Open,  Structure Length: 5.15m (16.90ft),  Average Daily Traffic: 72,800 (year 2008),  Truck Traffic: 10%,  Average Future Daily Traffic: 84,000 (year 2028),  Design Load: HS 20,  Features Intersected: BRANCH AV
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 4,  Base Highway Network: Yes (,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 29.6m (97.1ft),  Skew: 33 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 19.8m (65.0ft),  Curb-To-Curb Width: 29.6m (97.1ft),  Out-to-Out Width: 32.3m (106.0ft)

Condition: Deck: Good,  Superstructure: Poor,  Substructure: Poor,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.24m (17.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2009,  Bridge Improvement Cost: $13,461,000,  Roadway Improvement Cost: $1,346,000,  Total Project Cost: $20,192,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>

Structure Number: 429,  Location: 2.5 Mi N of JCT I-95 (Lat: 41.849667,  Lng: -71.424833),  Route carried "on" structure: City street ,  Year Built: 1957,  Year Reconstructed: 1990,  Status: Open,  Structure Length: 3.20m (10.50ft),  Average Daily Traffic: 8,773 (year 1996),  Truck Traffic: 10%,  Average Future Daily Traffic: 10,833 (year 2028),  Design Load: HS 20,  Features Intersected: RI 146 LOUISQUISSET PIKE,  Facility Carried by Structure: HAWKINS ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 14.9m (48.9ft),  Curb or Sidewalk Widths: Left: 2.0m (6.6ft),  Right: 2.0m (6.6ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 17.7m (58.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 74.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 57.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.20m (10.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2009,  Bridge Improvement Cost: $121,000,  Roadway Improvement Cost: $12,000,  Total Project Cost: $182,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 43,  Location: 1.0 Mi N of JCT I-95 (Lat: 41.841000,  Lng: -71.418000),  Route carried "on" structure: City street ,  Year Built: 1975,  Year Reconstructed: 1991,  Status: Open,  Structure Length: 3.32m (10.89ft),  Average Daily Traffic: 19,238 (year 1996),  Truck Traffic: 10%,  Average Future Daily Traffic: 24,086 (year 2028),  Design Load: HS 20,  Features Intersected: RI 146 LOUISQUISSET PIKE,  Facility Carried by Structure: ADMIRAL ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 16.5m (54.1ft),  Skew: 22 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 15.8m (51.8ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 16.5m (54.1ft),  Out-to-Out Width: 21.0m (68.9ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 53.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.32m (10.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2009,  Bridge Improvement Cost: $1,351,000,  Roadway Improvement Cost: $135,000,  Total Project Cost: $2,027,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>

Structure Number: 439,  Location: 0.1 Mi S of Branch Av (Lat: 41.852000,  Lng: -71.427000),  Route carried "on" structure: State highway 146,  Year Built: 1957,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 53,800 (year 1995),  Truck Traffic: 10%,  Average Future Daily Traffic: 65,560 (year 2028),  Design Load: HS 20,  Features Intersected: WEST RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 6,  Base Highway Network: Yes (,  Subroute: 1),  Owner: State Highway Agency,  Skew: 23 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 27.7m (90.9ft),  Out-to-Out Width: 32.0m (105.0ft)

Condition: Channel: Poor,  Culverts: Good,  Operating Rating: 38.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.64m (2.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2009,  Bridge Improvement Cost: $506,000,  Roadway Improvement Cost: $51,000,  Total Project Cost: $759,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 452,  Location: 0.3 Mi S of JCT US6&RI10 (Lat: 41.809500,  Lng: -71.440667),  Route carried "on" structure: City street ,  Year Built: 1958,  Status: Posted for load,  Structure Length: 5.97m (19.59ft),  Average Daily Traffic: 9,000 (year 2008),  Truck Traffic: 10%,  Average Future Daily Traffic: 26,934 (year 2028),  Design Load: HS 20,  Features Intersected: RI 10 HUNTINGTON EXPRESS,  Facility Carried by Structure: UNION AV
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Skew: 22 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 2,  Length of Maximum Span: 19.2m (63.0ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 14.6m (47.9ft),  Out-to-Out Width: 20.6m (67.6ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Poor,  Operating Rating: 37.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 22.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 5.97m (19.59ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: March 2008,  Other Special Inspection Date: March 2008,  Bridge Improvement Cost: $5,016,000,  Roadway Improvement Cost: $502,000,  Total Project Cost: $7,524,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 454,  Location: 0.1 Mi W of JCT Niantc Av (Lat: 41.789167,  Lng: -71.435833),  Route carried "on" structure: City street ,  Year Built: 1959,  Status: Open,  Structure Length: 5.91m (19.39ft),  Average Daily Traffic: 3,700 (year 2008),  Truck Traffic: 10%,  Average Future Daily Traffic: 4,440 (year 2028),  Design Load: HS 20,  Features Intersected: RI 10 HUNTINGTON EXPRESS,  Facility Carried by Structure: FRANKFORT ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 5,  Owner: State Highway Agency,  Approaching Roadway Width: 10.7m (35.1ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 2,  Length of Maximum Span: 20.4m (66.9ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 15.0m (49.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 66.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 5.91m (19.39ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2008,  Bridge Improvement Cost: $253,000,  Roadway Improvement Cost: $25,000,  Total Project Cost: $380,000 ( Estimate for 2007),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 501,  Location: 0.4 Mi E of JCT RI 10 (Lat: 41.815333,  Lng: -71.446500),  Route carried "on" structure: US 6,  Year Built: 1953,  Year Reconstructed: 1968,  Status: Temporarily open,  Structure Length: 2.10m (6.89ft),  Average Daily Traffic: 28,300 (year 2008),  Truck Traffic: 10%,  Average Future Daily Traffic: 30,000 (year 2028),  Design Load: HS 20,  Features Intersected: PLAINFIELD ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 6,  Lanes under structure: 2,  Base Highway Network: Yes (,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 37.5m (123.0ft),  Skew: 30 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 19.8m (65.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 37.5m (123.0ft),  Out-to-Out Width: 49.4m (162.1ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Poor,  Operating Rating: 52.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.01m (6.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2008,  Bridge Improvement Cost: $759,000,  Roadway Improvement Cost: $76,000,  Total Project Cost: $1,139,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>

Structure Number: 503,  Location: 0.1 Mi W of JCT RI 10 (Lat: 41.814667,  Lng: -71.444500),  Route carried "on" structure: US 6,  Year Built: 1950,  Status: Temporarily open,  Structure Length: 9.69m (31.79ft),  Average Daily Traffic: 28,300 (year 2008),  Truck Traffic: 10%,  Average Future Daily Traffic: 30,000 (year 2028),  Design Load: HS 20,  Features Intersected: US 6 LANES C & D
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes (,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 11.3m (37.1ft),  Skew: 9 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 21.9m (71.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 11.3m (37.1ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Serious,  Operating Rating: 38.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: High priority of corrective action,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 9.57m (31.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2008,  Bridge Improvement Cost: $5,721,000,  Roadway Improvement Cost: $572,000,  Total Project Cost: $8,582,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>

Structure Number: 504,  Location: 0.1 Mi W of JCT RI 10 (Lat: 41.814333,  Lng: -71.441167),  Route carried "on" structure: US 6,  Year Built: 1951,  Year Reconstructed: 1978,  Status: Temporarily open,  Structure Length: 40.81m (133.89ft),  Average Daily Traffic: 48,800 (year 2008),  Truck Traffic: 10%,  Average Future Daily Traffic: 50,000 (year 2028),  Design Load: HS 20,  Features Intersected: WESTMINSTER,TROY,AMTRAK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 6,  Lanes under structure: 10,  Base Highway Network: Yes (,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Skew: 39 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 38,  Length of Maximum Span: 22.6m (74.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 28.0m (91.9ft),  Out-to-Out Width: 30.8m (101.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Serious,  Operating Rating: 63.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of corrective action,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 40.81m (133.89ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: November 2009,  Other Special Inspection Date: November 2009,  Bridge Improvement Cost: $63,178,000,  Roadway Improvement Cost: $6,318,000,  Total Project Cost: $94,767,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>

Structure Number: 505,  Location: 2.2 Mi W of JCT I-95 (Lat: 41.815667,  Lng: -71.438500),  Route carried "on" structure: Alternate City street ,  Year Built: 1951,  Status: Open,  Structure Length: 1.46m (4.79ft),  Average Daily Traffic: 11,400 (year 2008),  Truck Traffic: 10%,  Average Future Daily Traffic: 13,680 (year 2028),  Design Load: HS 20,  Features Intersected: OLNEYVILLE EXP LANE H,  Facility Carried by Structure: WESTMINSTER ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.0m (45.9ft),  Curb or Sidewalk Widths: Left: 3.0m (9.8ft),  Right: 3.0m (9.8ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 19.3m (63.3ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 72.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.46m (4.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2008,  Bridge Improvement Cost: $227,000,  Roadway Improvement Cost: $23,000,  Total Project Cost: $341,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>

Structure Number: 506,  Location: 2.0 Mi W of JCT I-95 (Lat: 41.816000,  Lng: -71.439000),  Route carried "on" structure: Alternate City street ,  Year Built: 1951,  Status: Open,  Structure Length: 2.65m (8.69ft),  Average Daily Traffic: 11,400 (year 2008),  Truck Traffic: 10%,  Average Future Daily Traffic: 13,680 (year 2028),  Design Load: HS 20,  Features Intersected: OLNEYVILLE EXPWY,  Facility Carried by Structure: WESTMINSTER ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 3,  Owner: State Highway Agency,  Approaching Roadway Width: 14.0m (45.9ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.0m (68.9ft),  Curb or Sidewalk Widths: Left: 3.0m (9.8ft),  Right: 3.0m (9.8ft),  Curb-To-Curb Width: 13.6m (44.6ft),  Out-to-Out Width: 20.7m (67.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 10.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 66.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.65m (8.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2008,  Bridge Improvement Cost: $424,000,  Roadway Improvement Cost: $42,000,  Total Project Cost: $636,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>

Structure Number: 507,  Location: 0.3 Mi N of JCT RI 195 (Lat: 41.817500,  Lng: -71.439000),  Route carried "on" structure: US 6,  Year Built: 1951,  Year Reconstructed: 1978,  Status: Open,  Structure Length: 3.78m (12.40ft),  Average Daily Traffic: 28,300 (year 2006),  Truck Traffic: 10%,  Average Future Daily Traffic: 33,960 (year 2028),  Design Load: HS 20,  Features Intersected: BROADWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes (,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 11.3m (37.1ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 18.6m (61.0ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 11.3m (37.1ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Poor,  Operating Rating: 49.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.78m (12.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2008,  Bridge Improvement Cost: $530,000,  Roadway Improvement Cost: $53,000,  Total Project Cost: $795,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>

Structure Number: 508,  Location: 1.5 Mi W of JCT I-95 (Lat: 41.823833,  Lng: -71.415833),  Route carried "on" structure: City street ,  Year Built: 1951,  Year Reconstructed: 1978,  Status: Open,  Structure Length: 3.40m (11.15ft),  Average Daily Traffic: 12,900 (year 2008),  Truck Traffic: 10%,  Average Future Daily Traffic: 14,100 (year 2028),  Design Load: HS 20,  Features Intersected: OLNEYVILLE EXPWY LANE B,  Facility Carried by Structure: BROADWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 18.3m (60.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 32.4m (106.3ft),  Curb or Sidewalk Widths: Left: 2.7m (8.9ft),  Right: 2.7m (8.9ft),  Curb-To-Curb Width: 18.3m (60.0ft),  Out-to-Out Width: 24.4m (80.1ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 93.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 56.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.80m (5.91ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2008,  Total Project Cost: $2,553,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 509,  Location: 0.4 Mi N of JCT RI 195 (Lat: 41.821000,  Lng: -71.437167),  Route carried "on" structure: Ramp US 6,  Year Built: 1978,  Status: Open,  Structure Length: 13.17m (43.21ft),  Average Daily Traffic: 8,000 (year 2007),  Truck Traffic: 10%,  Average Future Daily Traffic: 9,000 (year 2028),  Design Load: HS 20,  Features Intersected: US 6, AMTRAK & P&W RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 8,  Owner: State Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Skew: 9 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 29.3m (96.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 8.1m (26.6ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 60.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 12.98m (42.59ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: August 2009,  Other Special Inspection Date: August 2009,  Bridge Improvement Cost: $2,458,000,  Roadway Improvement Cost: $246,000,  Total Project Cost: $3,687,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 51,  Location: 0.5 Mi N of WSTMNSTR ST (Lat: 41.820333,  Lng: -71.438500),  Route carried "on" structure: Ramp US 6,  Year Built: 1951,  Year Reconstructed: 1978,  Status: Temporarily open,  Structure Length: 6.34m (20.80ft),  Average Daily Traffic: 7,000 (year 2008),  Truck Traffic: 10%,  Average Future Daily Traffic: 8,000 (year 2028),  Design Load: HS 20,  Features Intersected: HARRIS AV; AMTRAK; P&W
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 11.3m (37.1ft),  Skew: 5 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 39.0m (128.0ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 11.3m (37.1ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Fair,  Operating Rating: 34.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 26.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 3.35m (10.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2009,  Bridge Improvement Cost: $3,915,000,  Roadway Improvement Cost: $392,000,  Total Project Cost: $5,873,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>

Structure Number: 511,  Location: 0.1 Mi S of Atwells Av (Lat: 41.821500,  Lng: -71.441167),  Route carried "on" structure: City street ,  Year Built: 1909,  Year Reconstructed: 1949,  Status: Open,  Structure Length: 1.49m (4.89ft),  Average Daily Traffic: 15,200 (year 2008),  Truck Traffic: 10%,  Average Future Daily Traffic: 16,704 (year 2028),  Design Load: HS 20,  Features Intersected: WOONASQUATUCKET RIVER,  Facility Carried by Structure: VALLEY ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 10.3m (33.8ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.1m (43.0ft),  Curb or Sidewalk Widths: Left: 2.2m (7.2ft),  Right: 2.2m (7.2ft),  Curb-To-Curb Width: 10.3m (33.8ft),  Out-to-Out Width: 15.1m (49.5ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 71.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.49m (4.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2009,  Bridge Improvement Cost: $702,000,  Roadway Improvement Cost: $70,000,  Total Project Cost: $1,053,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 513,  Location: 1.0 Mi W of JCT RI 10 (Lat: 41.817667,  Lng: -71.443667),  Route carried "on" structure: City street ,  Year Built: 1951,  Status: Open,  Structure Length: 1.74m (5.71ft),  Average Daily Traffic: 16,800 (year 2008),  Truck Traffic: 10%,  Average Future Daily Traffic: 28,100 (year 2028),  Design Load: HS 20,  Features Intersected: WOONASQUATUCKET RIVER,  Facility Carried by Structure: MANTON AV
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.8m (55.1ft),  Curb or Sidewalk Widths: Left: 2.1m (6.9ft),  Right: 2.1m (6.9ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 15.8m (51.8ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Poor,  Channel: Satisfactory,  Operating Rating: 27.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 20.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.07m (6.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2009,  Bridge Improvement Cost: $1,021,000,  Roadway Improvement Cost: $102,000,  Total Project Cost: $1,531,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 523,  Location: 0.1 Mi W of JCT US 44 (Lat: 41.819500,  Lng: -71.401167),  Route carried "on" structure: Ramp Interstate 195,  Year Built: 1958,  Status: Temporarily open,  Structure Length: 6.04m (19.82ft),  Average Daily Traffic: 9,800 (year 1992),  Truck Traffic: 10%,  Average Future Daily Traffic: 11,760 (year 2028),  Design Load: HS 20,  Features Intersected: BRIDGE ST & SR-2 & DR-2
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 7,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 9 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 20.4m (66.9ft),  Curb or Sidewalk Widths: Left: 0.8m (2.6ft),  Right: 0.8m (2.6ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Poor,  Structural Evaluation: High priority of corrective action,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 6.04m (19.82ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: December 2008,  Other Special Inspection Date: November 2009,  Bridge Improvement Cost: $2,328,000,  Roadway Improvement Cost: $233,000,  Total Project Cost: $3,492,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>

Structure Number: 524,  Location: 0.1 Mi N of Bridge St (Lat: 41.819667,  Lng: -71.403000),  Route carried "on" structure: Ramp Interstate 195,  Year Built: 1958,  Year Reconstructed: 1989,  Status: Closed,  Structure Length: 18.59m (60.99ft),  Average Daily Traffic: 5,500 (year 1992),  Truck Traffic: 10%,  Average Future Daily Traffic: 7,500 (year 2028),  Design Load: HS 20,  Features Intersected: SR-5 & 7 & RAMP CR-2
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 3,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 9 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 12,  Length of Maximum Span: 19.8m (65.0ft),  Curb or Sidewalk Widths: Left: 1.3m (4.3ft),  Right: 1.3m (4.3ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Serious,  Deck Geometry: Better than present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 18.59m (60.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2008,  Bridge Improvement Cost: $5,752,000,  Roadway Improvement Cost: $575,000,  Total Project Cost: $8,628,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 525,  Location: 0.1 Mi E of JCT I-95 (Lat: 41.820500,  Lng: -71.404500),  Route carried "on" structure: Interstate 195,  Year Built: 1958,  Year Reconstructed: 1990,  Status: Closed,  Structure Length: 36.88m (121.00ft),  Average Daily Traffic: 176,500 (year 2008),  Truck Traffic: 10%,  Average Future Daily Traffic: 191,107 (year 2028),  Design Load: HS 20,  Features Intersected: PROVIDENCE RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 8,  Lanes under structure: 6,  Base Highway Network: Yes (,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 34.4m (112.9ft),  Skew: 39 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 18,  Length of Maximum Span: 25.9m (85.0ft),  Curb or Sidewalk Widths: Left: 0.8m (2.6ft),  Right: 0.8m (2.6ft),  Curb-To-Curb Width: 34.1m (111.9ft),  Out-to-Out Width: 36.7m (120.4ft)

Condition: Deck: Serious,  Superstructure: Fair,  Substructure: Poor,  Channel: Good,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 36.88m (121.00ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: November 2008,  Underwater Inspection Date: June 2009,  Other Special Inspection Date: November 2008,  Bridge Improvement Cost: $97,854,000,  Roadway Improvement Cost: $9,785,000,  Total Project Cost: $146,781,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 526,  Location: 0.1 Mi E of JCT US 6 (Lat: 41.821000,  Lng: -71.408333),  Route carried "on" structure: Ramp Interstate 195,  Year Built: 1957,  Status: Closed,  Structure Length: 6.92m (22.70ft),  Average Daily Traffic: 3,010 (year 2007),  Truck Traffic: 10%,  Average Future Daily Traffic: 3,500 (year 2028),  Design Load: HS 20,  Features Intersected: I-195 RAMP SR-8
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 18.0m (59.1ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Poor,  Operating Rating: 70.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 7.80m (25.59ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: June 2009,  Other Special Inspection Date: June 2009,  Bridge Improvement Cost: $1,238,000,  Roadway Improvement Cost: $124,000,  Total Project Cost: $1,857,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>

Structure Number: 528,  Location: 0.1 Mi E of JCT I-95 (Lat: 41.821167,  Lng: -71.408333),  Route carried "on" structure: Interstate 195,  Year Built: 1957,  Year Reconstructed: 1989,  Status: Closed,  Structure Length: 6.89m (22.60ft),  Average Daily Traffic: 176,500 (year 2007),  Truck Traffic: 10%,  Average Future Daily Traffic: 190,000 (year 2028),  Design Load: HS 20,  Features Intersected: DYER ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 2,  Base Highway Network: Yes (,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 23.2m (76.1ft),  Curb or Sidewalk Widths: Left: 0.8m (2.6ft),  Right: 0.8m (2.6ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Poor,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 6.89m (22.60ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2009,  Bridge Improvement Cost: $314,000,  Roadway Improvement Cost: $31,000,  Total Project Cost: $471,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>

Structure Number: 529,  Location: 0.1 Mi E of JCT I-95 (Lat: 41.820833,  Lng: -71.410667),  Route carried "on" structure: Interstate 195,  Year Built: 1958,  Status: Closed,  Structure Length: 2.01m (6.59ft),  Average Daily Traffic: 161,600 (year 2008),  Truck Traffic: 10%,  Average Future Daily Traffic: 193,920 (year 2028),  Design Load: HS 20,  Features Intersected: RICHMOND ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 8,  Lanes under structure: 2,  Base Highway Network: Yes (,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 33.5m (109.9ft),  Skew: 32 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.6m (61.0ft),  Curb or Sidewalk Widths: Left: 0.8m (2.6ft),  Right: 0.8m (2.6ft),  Curb-To-Curb Width: 32.6m (107.0ft),  Out-to-Out Width: 34.5m (113.2ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Serious,  Deck Geometry: Meets minimum limits,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.01m (6.59ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: April 2009,  Other Special Inspection Date: April 2009,  Bridge Improvement Cost: $3,597,000,  Roadway Improvement Cost: $360,000,  Total Project Cost: $5,395,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>

Structure Number: 53,  Location: 0.1 Mi E of JCT I-95 (Lat: 41.820167,  Lng: -71.412167),  Route carried "on" structure: Interstate 195,  Year Built: 1957,  Status: Closed,  Structure Length: 5.70m (18.70ft),  Average Daily Traffic: 161,700 (year 2008),  Truck Traffic: 10%,  Average Future Daily Traffic: 193,162 (year 2028),  Design Load: HS 20,  Features Intersected: CHESTNUT ST & SR-12
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 7,  Lanes under structure: 4,  Base Highway Network: Yes (,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 33.5m (109.9ft),  Skew: 39 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 19.2m (63.0ft),  Curb or Sidewalk Widths: Left: 0.8m (2.6ft),  Right: 0.8m (2.6ft),  Curb-To-Curb Width: 32.6m (107.0ft),  Out-to-Out Width: 34.7m (113.8ft)

Condition: Deck: Poor,  Superstructure: Serious,  Substructure: Serious,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 5.70m (18.70ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: May 2009,  Other Special Inspection Date: May 2009,  Bridge Improvement Cost: $12,869,000,  Roadway Improvement Cost: $1,287,000,  Total Project Cost: $19,304,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>

Structure Number: 537,  Location: 1.0 Mi S of JCT I-195 (Lat: 41.813500,  Lng: -71.407000),  Route carried "on" structure: Interstate 95,  Year Built: 1961,  Year Reconstructed: 1982,  Status: Open,  Structure Length: 3.47m (11.38ft),  Average Daily Traffic: 198,200 (year 2008),  Truck Traffic: 10%,  Average Future Daily Traffic: 222,433 (year 2028),  Design Load: HS 20+Mod,  Features Intersected: EDDY ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 8,  Lanes under structure: 2,  Base Highway Network: Yes (,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 45.3m (148.6ft),  Skew: 15 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 30.5m (100.1ft),  Curb-To-Curb Width: 44.4m (145.7ft),  Out-to-Out Width: 45.8m (150.3ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 85.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.47m (11.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2009,  Bridge Improvement Cost: $3,325,000,  Roadway Improvement Cost: $333,000,  Total Project Cost: $4,988,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>

Structure Number: 539,  Location: AT JCT BLACKSTONE-ALLENS (Lat: 41.810333,  Lng: -71.405500),  Route carried "on" structure: Interstate 95,  Year Built: 1961,  Year Reconstructed: 1982,  Status: Open,  Structure Length: 3.72m (12.20ft),  Average Daily Traffic: 195,100 (year 2008),  Truck Traffic: 10%,  Average Future Daily Traffic: 226,304 (year 2028),  Design Load: HS 20+Mod,  Features Intersected: BLACKSTONE ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 8,  Lanes under structure: 2,  Base Highway Network: Yes (,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 18.6m (61.0ft),  Skew: 31 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 14.0m (45.9ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 37.2m (122.0ft),  Out-to-Out Width: 44.2m (145.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 92.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 55.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.72m (12.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2009,  Bridge Improvement Cost: $3,421,000,  Roadway Improvement Cost: $342,000,  Total Project Cost: $5,132,000 ( Estimate for 2007),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>

Structure Number: 571,  Location: 1.0 Mi N of JCT Elmwd Av (Lat: 41.817833,  Lng: -71.416500),  Route carried "on" structure: City street ,  Year Built: 1963,  Status: Open,  Structure Length: 6.10m (20.01ft),  Average Daily Traffic: 9,612 (year 1998),  Truck Traffic: 9%,  Average Future Daily Traffic: 12,154 (year 2028),  Design Load: HS 20,  Features Intersected: I-95, A,B,C,D,  Facility Carried by Structure: BROAD ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 9,  Owner: State Highway Agency,  Approaching Roadway Width: 14.3m (46.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 29.9m (98.1ft),  Curb or Sidewalk Widths: Left: 2.5m (8.2ft),  Right: 2.5m (8.2ft),  Curb-To-Curb Width: 14.0m (45.9ft),  Out-to-Out Width: 20.9m (68.6ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 77.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.10m (20.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2009,  Bridge Improvement Cost: $2,223,000,  Roadway Improvement Cost: $222,000,  Total Project Cost: $3,335,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>

Structure Number: 572,  Location: 0.1 Mi N of JCT I-195 (Lat: 41.819167,  Lng: -71.418667),  Route carried "on" structure: Business City street ,  Year Built: 1963,  Status: Open,  Structure Length: 5.27m (17.29ft),  Average Daily Traffic: 7,200 (year 1992),  Truck Traffic: 10%,  Average Future Daily Traffic: 8,640 (year 2028),  Design Load: HS 20,  Features Intersected: I-95,  Facility Carried by Structure: WESTMINSTER ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 9,  Owner: State Highway Agency,  Approaching Roadway Width: 14.3m (46.9ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 27.4m (89.9ft),  Curb or Sidewalk Widths: Left: 2.5m (8.2ft),  Right: 2.5m (8.2ft),  Curb-To-Curb Width: 14.0m (45.9ft),  Out-to-Out Width: 19.9m (65.3ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 84.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 5.27m (17.29ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2009,  Bridge Improvement Cost: $1,941,000,  Roadway Improvement Cost: $194,000,  Total Project Cost: $2,912,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 573,  Location: 0.3 Mi N of JCT I-195 (Lat: 41.821000,  Lng: -71.418500),  Route carried "on" structure: Alternate City street ,  Year Built: 1963,  Status: Open,  Structure Length: 6.34m (20.80ft),  Average Daily Traffic: 3,941 (year 1998),  Truck Traffic: 10%,  Average Future Daily Traffic: 4,866 (year 2028),  Design Load: HS 20,  Features Intersected: I-95, BR-3,  Facility Carried by Structure: WASHINGTON ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 9,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 25.3m (83.0ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 16.8m (55.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 72.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 6.34m (20.80ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2009,  Bridge Improvement Cost: $2,216,000,  Roadway Improvement Cost: $222,000,  Total Project Cost: $3,324,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>

Structure Number: 574,  Location: 0.1 Mi S of ATWELLS AV (Lat: 41.822167,  Lng: -71.420500),  Route carried "on" structure: Business City street ,  Year Built: 1963,  Status: Open,  Structure Length: 5.64m (18.50ft),  Average Daily Traffic: 14,967 (year 1998),  Truck Traffic: 10%,  Average Future Daily Traffic: 18,739 (year 2028),  Design Load: HS 20,  Features Intersected: I-95,  Facility Carried by Structure: BROADWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 8,  Owner: State Highway Agency,  Approaching Roadway Width: 18.6m (61.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 27.7m (90.9ft),  Curb or Sidewalk Widths: Left: 2.6m (8.5ft),  Right: 2.4m (7.9ft),  Curb-To-Curb Width: 14.9m (48.9ft),  Out-to-Out Width: 20.8m (68.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 79.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 5.64m (18.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2009,  Bridge Improvement Cost: $2,441,000,  Roadway Improvement Cost: $244,000,  Total Project Cost: $3,662,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>

Structure Number: 575,  Location: 1.0 Mi N of JCT BROADWAY (Lat: 41.822833,  Lng: -71.420333),  Route carried "on" structure: City street ,  Year Built: 1965,  Status: Open,  Structure Length: 6.64m (21.78ft),  Average Daily Traffic: 16,600 (year 1992),  Truck Traffic: 10%,  Average Future Daily Traffic: 19,920 (year 2028),  Design Load: HS 20,  Features Intersected: I-95 RAMPS BC&CA,  Facility Carried by Structure: ATWELLS AV
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 8,  Owner: State Highway Agency,  Approaching Roadway Width: 13.7m (44.9ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 32.6m (107.0ft),  Curb or Sidewalk Widths: Left: 2.4m (7.9ft),  Right: 2.4m (7.9ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 19.3m (63.3ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 72.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 6.64m (21.78ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2009,  Bridge Improvement Cost: $482,000,  Roadway Improvement Cost: $48,000,  Total Project Cost: $723,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 576,  Location: 0.8 Mi S of JCT RI 146 (Lat: 41.824167,  Lng: -71.419333),  Route carried "on" structure: Ramp Interstate 95,  Year Built: 1965,  Year Reconstructed: 1992,  Status: Open,  Structure Length: 7.68m (25.20ft),  Average Daily Traffic: 13,200 (year 2008),  Truck Traffic: 10%,  Average Future Daily Traffic: 17,734 (year 2028),  Design Load: HS 20+Mod,  Features Intersected: I-95 RAMP BC,  Facility Carried by Structure: RAMP BR-4
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 38.1m (125.0ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 8.1m (26.6ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 94.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 56.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 7.68m (25.20ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 12 months,  Inspection Date: December 2008,  Critical Feature Inspection Date: November 2009,  Bridge Improvement Cost: $368,000,  Roadway Improvement Cost: $37,000,  Total Project Cost: $552,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>

Structure Number: 577,  Location: 0.5 Mi N of JCT I 195 (Lat: 41.825667,  Lng: -71.420167),  Route carried "on" structure: Ramp Interstate 95,  Year Built: 1965,  Year Reconstructed: 1992,  Status: Open,  Structure Length: 10.33m (33.89ft),  Average Daily Traffic: 11,400 (year 1994),  Truck Traffic: 10%,  Average Future Daily Traffic: 6,901 (year 2028),  Design Load: HS 20+Mod,  Features Intersected: I-95 RAMP CA,  Facility Carried by Structure: RAMP AR-5
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 34.4m (112.9ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 8.1m (26.6ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Poor,  Operating Rating: 29.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 21.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 10.33m (33.89ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 12 months,  Inspection Date: December 2008,  Critical Feature Inspection Date: November 2009,  Bridge Improvement Cost: $1,742,000,  Roadway Improvement Cost: $174,000,  Total Project Cost: $2,613,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 578,  Location: 0.25 Mi N ATWELLS AV (Lat: 41.827333,  Lng: -71.418833),  Route carried "on" structure: Interstate 95,  Year Built: 1964,  Year Reconstructed: 1992,  Status: Open,  Structure Length: 39.47m (129.49ft),  Average Daily Traffic: 236,230 (year 1998),  Truck Traffic: 10%,  Average Future Daily Traffic: 283,152 (year 2028),  Design Load: HS 20,  Features Intersected: US 6,WOON RVR,AMTRAK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 8,  Lanes under structure: 13,  Base Highway Network: Yes (,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 32.6m (107.0ft),  Skew: 10 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 8,  Length of Maximum Span: 64.0m (210.0ft),  Curb-To-Curb Width: 28.7m (94.2ft),  Out-to-Out Width: 30.8m (101.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Good,  Operating Rating: 61.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 39.47m (129.49ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: November 2009,  Underwater Inspection Date: October 2009,  Bridge Improvement Cost: $25,299,000,  Roadway Improvement Cost: $2,530,000,  Total Project Cost: $37,948,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing

Parts: 1, 2, 3, 4, 5

Jump to a detailed profile or search site with Google Custom Search
Business Search - 14 Million verified businesses
Search for: near: 

Discuss this city on our hugely popular Rhode Island forum

Back to: Providence, RI, Rhode Island, All US cities.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2009 Advameg, Inc.