Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Tulsa, Oklahoma (OK)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 1,018Number of bridges
  • 12,605ft / 3,842mTotal length
  • $1,477,519,000Total costs
  • 19,139,960Total average daily traffic
  • 1,822,874Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Tulsa
  • No street view available for this location

New bridges in Tulsa, OK - historical statistics
  • New bridges - historical statistics
  • 11910-1919
  • 11920-1929
  • 91930-1939
  • 261940-1949
  • 221950-1959
  • 1971960-1969
  • 3341970-1979
  • 1101980-1989
  • 961990-1999
  • 1422000-2009
  • 692010-2019
  • 112020-2022
Reconstructed bridges in Tulsa, OK - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 61960-1969
  • 71970-1979
  • 121980-1989
  • 71990-1999
  • 142000-2009
  • 82010-2019
Average Bridge Daily Traffic in Tulsa, OK
Average Bridge Truck Traffic in Tulsa, OK
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 6.0%Excellent
  • 8.6%Very good
  • 53.4%Good
  • 19.6%Satisfactory
  • 10.3%Fair
  • 1.8%Poor
  • 0.3%Failed
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 7.3%Excellent
  • 25.7%Very good
  • 39.3%Good
  • 19.4%Satisfactory
  • 7.3%Fair
  • 1.0%Poor
  • 0.3%Critical
  • 0.3%Failed
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 2.0%Excellent
  • 17.4%Very good
  • 48.1%Good
  • 15.1%Satisfactory
  • 14.1%Fair
  • 3.0%Poor
  • 0.3%Failed
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 2.1%Excellent
  • 46.5%Very good
  • 24.2%Good
  • 15.6%Satisfactory
  • 9.5%Fair
  • 1.2%Poor
  • 0.9%Serious
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 9.1%Excellent
  • 41.1%Very good
  • 44.0%Good
  • 2.4%Satisfactory
  • 2.4%Fair
  • 1.0%Poor
  • 2.4%Serious
Find on map >>   Show street view

Structure Number: 22197,  Location: 1900 W 43 (Lat: 36.100697,  Lng: -96.015033),  Route carried "on" structure: City street E0633,  Year Built: 1989,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 1,150 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 1,840 (year 2040),  Design Load: HS 20,  Features Intersected: RED FORK CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.287,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.6m (21.7ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.4m (14.4ft),  Curb or Sidewalk Widths: Left: 3.0m (9.8ft),  Right: 4.6m (15.1ft),  Curb-To-Curb Width: 6.6m (21.7ft),  Out-to-Out Width: 15.1m (49.5ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 63.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.28m (10.76ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $100,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $225,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 2221,  Location: 4200 S UNION (Lat: 36.102481,  Lng: -96.011697),  Route carried "on" structure: City street 8261,  Year Built: 1989,  Status: Open,  Structure Length: 1.34m (4.40ft),  Average Daily Traffic: 7,500 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 12,000 (year 2040),  Design Load: HS 20,  Features Intersected: RED FORK CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.723,  Lanes on structure: 3,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.3m (14.1ft),  Curb or Sidewalk Widths: Left: 3.6m (11.8ft),  Right: 3.6m (11.8ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 19.9m (65.3ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.03m (13.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $100,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $225,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 2227,  Location: 11300 E 15TH ST (Lat: 36.140703,  Lng: -95.849508),  Route carried "on" structure: City street E0605,  Year Built: 1989,  Status: Open,  Structure Length: 2.08m (6.82ft),  Average Daily Traffic: 600 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 960 (year 2040),  Design Load: HS 20,  Features Intersected: TUPELO CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.161,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 10.4m (34.1ft),  Curb or Sidewalk Widths: Left: 0.9m (3.0ft),  Right: 0.9m (3.0ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 67.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.00m (16.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $255,000,  Roadway Improvement Cost: $140,000,  Total Project Cost: $406,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 22274,  Location: 2900 S 87 E (Lat: 36.120925,  Lng: -95.879631),  Route carried "on" structure: City street N4003,  Year Built: 1989,  Status: Posted for load,  Structure Length: 2.23m (7.32ft),  Average Daily Traffic: 864 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,382 (year 2040),  Design Load: HS 20,  Features Intersected: AUDUBON CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.127,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 11.0m (36.1ft),  Curb or Sidewalk Widths: Left: 1.7m (5.6ft),  Right: 1.7m (5.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 5.28m (17.32ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $270,000,  Roadway Improvement Cost: $148,000,  Total Project Cost: $430,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 22289,  Location: 2750S 90TH E AVE. (Lat: 36.123517,  Lng: -95.875769),  Route carried "on" structure: City street N4006,  Year Built: 1989,  Status: Posted for load,  Structure Length: 2.38m (7.81ft),  Average Daily Traffic: 300 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 480 (year 2040),  Design Load: HS 20,  Features Intersected: AUDUBON CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.805,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 11.6m (38.1ft),  Curb or Sidewalk Widths: Left: 2.3m (7.5ft),  Right: 2.3m (7.5ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 17.1m (56.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 29.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 17.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 5.54m (18.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $283,000,  Roadway Improvement Cost: $156,000,  Total Project Cost: $451,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 22329,  Location: 5.9 MI N OF I-244 (Lat: 36.235017,  Lng: -95.945297),  Route carried "on" structure: US 75,  Year Built: 1989,  Status: Open,  Structure Length: 3.05m (10.01ft),  Average Daily Traffic: 18,250 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 29,200 (year 2040),  Design Load: HS 20,  Features Intersected: 56TH ST. N. UNDER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.574,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 30.5m (100.1ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.5m (41.0ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 64.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 49.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.80m (19.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $744,000,  Roadway Improvement Cost: $1,228,000,  Total Project Cost: $2,083,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Membrane: Epoxy,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 22394,  Location: 10500 E. 36TH ST. N. (Lat: 36.205944,  Lng: -95.857844),  Route carried "on" structure: City street 8420,  Year Built: 1989,  Status: Open,  Structure Length: 7.67m (25.16ft),  Average Daily Traffic: 5,098 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 8,157 (year 2040),  Design Load: HS 20,  Features Intersected: MINGO CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.011,  Lanes on structure: 4,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 24.2m (79.4ft),  Skew: 30 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 25.6m (84.0ft),  Curb-To-Curb Width: 21.5m (70.5ft),  Out-to-Out Width: 25.3m (83.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 71.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.17m (33.37ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $1,038,000,  Roadway Improvement Cost: $480,000,  Total Project Cost: $1,546,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 2256,  Location: 700 E APACHE (Lat: 36.191364,  Lng: -95.982839),  Route carried "on" structure: City street 8400,  Year Built: 1990,  Status: Open,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 8,260 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 13,216 (year 2040),  Design Load: HS 20,  Features Intersected: DIRTY BUTTER CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.058,  Lanes on structure: 4,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 15.3m (50.2ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 7.3m (24.0ft),  Curb or Sidewalk Widths: Left: 2.8m (9.2ft),  Right: 2.0m (6.6ft),  Curb-To-Curb Width: 15.3m (50.2ft),  Out-to-Out Width: 22.6m (74.1ft)

Condition: Channel: Very good,  Culverts: Satisfactory,  Operating Rating: 42.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.31m (14.14ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $441,000,  Roadway Improvement Cost: $242,000,  Total Project Cost: $686,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 22638,  Location: 2.1 MI E JCT SH 51 (Lat: 36.133231,  Lng: -95.868453),  Route carried "on" structure: Interstate 44,  Year Built: 1990,  Status: Open,  Structure Length: 8.84m (29.00ft),  Average Daily Traffic: 27,600 (year 2020),  Truck Traffic: 12%,  Average Future Daily Traffic: 44,160 (year 2040),  Design Load: HS 20,  Features Intersected: 21ST ST. UNDER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.247,  Lanes on structure: 4,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 19.5m (64.0ft),  Skew: 35 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 40.8m (133.9ft),  Curb-To-Curb Width: 19.5m (64.0ft),  Out-to-Out Width: 20.6m (67.6ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 70.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.02m (29.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $1,968,000,  Roadway Improvement Cost: $3,247,000,  Total Project Cost: $5,510,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Membrane: Epoxy,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 22644,  Location: 11300 E. 51ST ST. (Lat: 36.089583,  Lng: -95.850844),  Route carried "on" structure: City street 8260,  Year Built: 1990,  Status: Open,  Structure Length: 3.17m (10.40ft),  Average Daily Traffic: 16,000 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 25,600 (year 2040),  Design Load: HS 20,  Features Intersected: FORD CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.654,  Lanes on structure: 6,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 24.4m (80.1ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 6.1m (20.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft)

Condition: Channel: Very good,  Culverts: Satisfactory,  Inventory Rating: 60.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.64m (25.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $100,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $225,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 22672,  Location: 2 MI E JCT SH 51 (Lat: 36.132167,  Lng: -95.870617),  Route carried "on" structure: Interstate 44,  Year Built: 1990,  Status: Open,  Structure Length: 8.53m (27.99ft),  Average Daily Traffic: 30,350 (year 2020),  Truck Traffic: 12%,  Average Future Daily Traffic: 48,560 (year 2040),  Design Load: HS 20,  Features Intersected: MINGO CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.054,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 19.5m (64.0ft),  Skew: 33 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 30.5m (100.1ft),  Curb-To-Curb Width: 19.5m (64.0ft),  Out-to-Out Width: 20.4m (66.9ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 87.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.75m (35.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $2,344,000,  Roadway Improvement Cost: $3,867,000,  Total Project Cost: $6,563,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Membrane: Epoxy,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 22673,  Location: 2 MI E JCT SH 51 (Lat: 36.131764,  Lng: -95.870517),  Route carried "on" structure: Interstate 44,  Year Built: 1990,  Status: Open,  Structure Length: 8.53m (27.99ft),  Average Daily Traffic: 27,600 (year 2020),  Truck Traffic: 12%,  Average Future Daily Traffic: 44,160 (year 2040),  Design Load: HS 20,  Features Intersected: MINGO CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.054,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 19.5m (64.0ft),  Skew: 33 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 30.5m (100.1ft),  Curb-To-Curb Width: 19.5m (64.0ft),  Out-to-Out Width: 20.4m (66.9ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 87.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.75m (35.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $2,344,000,  Roadway Improvement Cost: $3,867,000,  Total Project Cost: $6,563,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Membrane: Epoxy,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 22674,  Location: 2.1 MI E JCT SH 51 (Lat: 36.133206,  Lng: -95.869147),  Route carried "on" structure: Interstate 44,  Year Built: 1990,  Status: Open,  Structure Length: 8.78m (28.81ft),  Average Daily Traffic: 30,350 (year 2020),  Truck Traffic: 12%,  Average Future Daily Traffic: 48,560 (year 2040),  Design Load: HS 20,  Features Intersected: 21ST ST. UNDER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.247,  Lanes on structure: 4,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 19.5m (64.0ft),  Skew: 35 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 40.8m (133.9ft),  Curb-To-Curb Width: 19.5m (64.0ft),  Out-to-Out Width: 20.6m (67.6ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 78.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.02m (29.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $1,968,000,  Roadway Improvement Cost: $3,247,000,  Total Project Cost: $5,510,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Membrane: Epoxy,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 22716,  Location: 5800 E 86 ST. (Lat: 36.038525,  Lng: -95.912197),  Route carried "on" structure: City street E0675,  Year Built: 1991,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 160 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 256 (year 2040),  Design Load: HS 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.805,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.3m (30.5ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.6m (8.5ft),  Curb-To-Curb Width: 9.3m (30.5ft),  Out-to-Out Width: 21.3m (69.9ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 42.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.11m (10.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $100,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $225,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 22757,  Location: 5100 S MINGO (Lat: 36.088883,  Lng: -95.868764),  Route carried "on" structure: City street 8421,  Year Built: 1991,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 16,733 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 26,773 (year 2040),  Design Load: HS 20,  Features Intersected: ALSUMA CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 15.286,  Lanes on structure: 5,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 18.9m (62.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.3m (14.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.3m (4.3ft)

Condition: Channel: Fair,  Culverts: Good,  Operating Rating: 42.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.83m (12.57ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $100,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $225,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 22772,  Location: 9800 E 51 ST. (Lat: 36.089814,  Lng: -95.867517),  Route carried "on" structure: City street 8260,  Year Built: 1991,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 19,000 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 30,400 (year 2040),  Design Load: HS 20,  Features Intersected: ALSUMA CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.654,  Lanes on structure: 5,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 19.2m (63.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.3m (14.1ft),  Curb or Sidewalk Widths: Left: 1.3m (4.3ft),  Right: 1.3m (4.3ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 42.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.83m (12.57ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $100,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $225,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 22862,  Location: 09.21 (Lat: 36.024722,  Lng: -95.940000),  Route carried "on" structure: City street ,  Year Built: 1991,  Status: Open,  Structure Length: 5.24m (17.19ft),  Average Daily Traffic: 20,400 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 32,640 (year 2040),  Design Load: HS 20,  Features Intersected: CREEK TP UNDER,  Facility Carried by Structure: HARVARD AVE.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.080,  Lanes on structure: 2,  Lanes under structure: 6,  Owner: State Toll Authority,  Approaching Roadway Width: 17.7m (58.1ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 25.9m (85.0ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 71.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.76m (18.90ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $1,854,000,  Roadway Improvement Cost: $1,250,000,  Total Project Cost: $3,539,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 22863,  Location: 10.22 (Lat: 36.025283,  Lng: -95.922253),  Route carried "on" structure: City street ,  Year Built: 1991,  Status: Open,  Structure Length: 4.91m (16.11ft),  Average Daily Traffic: 26,700 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 42,720 (year 2040),  Design Load: HS 20,  Features Intersected: CREEK TP UNDER,  Facility Carried by Structure: YALE AVE.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.689,  Lanes on structure: 4,  Lanes under structure: 6,  Owner: State Toll Authority,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 20 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 24.4m (80.1ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 24.7m (81.0ft),  Out-to-Out Width: 29.0m (95.1ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 56.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.91m (16.11ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $1,738,000,  Roadway Improvement Cost: $2,500,000,  Total Project Cost: $4,825,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 22864,  Location: 11.22 (Lat: 36.025742,  Lng: -95.904314),  Route carried "on" structure: City street ,  Year Built: 1991,  Status: Open,  Structure Length: 4.94m (16.21ft),  Average Daily Traffic: 53,400 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 85,440 (year 2040),  Design Load: HS 20,  Features Intersected: CREEK TP UNDER,  Facility Carried by Structure: SHERIDAN & 95TH ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.298,  Lanes on structure: 2,  Lanes under structure: 6,  Owner: State Toll Authority,  Approaching Roadway Width: 17.6m (57.7ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 24.7m (81.0ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 19.8m (65.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 72.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.94m (16.21ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $1,753,000,  Roadway Improvement Cost: $2,500,000,  Total Project Cost: $4,842,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 22911,  Location: 12.22S (Lat: 36.025636,  Lng: -95.886833),  Route carried "on" structure: Other road ,  Year Built: 1991,  Status: Open,  Structure Length: 6.83m (22.41ft),  Average Daily Traffic: 27,750 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 44,400 (year 2040),  Design Load: HS 20,  Features Intersected: U.S. 64 (MEMORIAL DR.)UN,  Facility Carried by Structure: CREEK TP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.908,  Lanes on structure: 3,  Lanes under structure: 6,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 13.7m (44.9ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 18.6m (61.0ft),  Curb-To-Curb Width: 16.9m (55.4ft),  Out-to-Out Width: 17.8m (58.4ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 69.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of replacement,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.83m (22.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $1,612,000,  Roadway Improvement Cost: $2,418,000,  Total Project Cost: $4,588,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 23121,  Location: 09.05N (Lat: 36.023553,  Lng: -95.942436),  Route carried "on" structure: Other road ,  Year Built: 1991,  Status: Open,  Structure Length: 3.84m (12.60ft),  Average Daily Traffic: 25,850 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 41,360 (year 2040),  Design Load: HS 20,  Features Intersected: VENSEL CREEK,  Facility Carried by Structure: CREEK TP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.806,  Lanes on structure: 3,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 11 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 38.4m (126.0ft),  Curb-To-Curb Width: 16.9m (55.4ft),  Out-to-Out Width: 17.8m (58.4ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 88.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.04m (23.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $542,000,  Roadway Improvement Cost: $813,000,  Total Project Cost: $1,554,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 23122,  Location: 11.00S (Lat: 36.025822,  Lng: -95.907422),  Route carried "on" structure: Other road ,  Year Built: 1991,  Status: Open,  Structure Length: 3.05m (10.01ft),  Average Daily Traffic: 26,700 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 42,720 (year 2040),  Design Load: HS 20,  Features Intersected: FRY CREEK,  Facility Carried by Structure: CREEK TP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.041,  Lanes on structure: 2,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 30.5m (100.1ft),  Curb-To-Curb Width: 16.9m (55.4ft),  Out-to-Out Width: 17.8m (58.4ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Inventory Rating: 67.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.23m (20.44ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $480,000,  Roadway Improvement Cost: $720,000,  Total Project Cost: $1,379,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 23123,  Location: 11.63 (Lat: 36.024892,  Lng: -95.897125),  Route carried "on" structure: Other road ,  Year Built: 1991,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 53,400 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 85,440 (year 2040),  Design Load: HS 20,  Features Intersected: CREEK,  Facility Carried by Structure: CREEK TP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.956,  Lanes on structure: 4,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 35.4m (116.1ft),  Skew: 30 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft),  Curb-To-Curb Width: 61.0m (200.1ft),  Out-to-Out Width: 61.9m (203.1ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.05m (10.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $200,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $360,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 23124,  Location: 11.99 (Lat: 36.024947,  Lng: -95.890719),  Route carried "on" structure: Other road ,  Year Built: 1991,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 53,400 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 85,440 (year 2040),  Design Load: HS 20,  Features Intersected: CREEK,  Facility Carried by Structure: CREEK TP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.537,  Lanes on structure: 6,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 35.4m (116.1ft),  Skew: 20 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 90.8m (297.9ft),  Out-to-Out Width: 91.4m (299.9ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.98m (13.06ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $200,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $360,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 23141,  Location: 9700 S DELAWARE (Lat: 36.022914,  Lng: -95.948906),  Route carried "on" structure: City street 8331,  Year Built: 1983,  Status: Open,  Structure Length: 5.00m (16.40ft),  Average Daily Traffic: 100 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 160 (year 2040),  Design Load: HS 20,  Features Intersected: VENSEL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.322,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 16.5m (54.1ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 50.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.10m (26.57ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $414,000,  Roadway Improvement Cost: $227,000,  Total Project Cost: $642,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 23142,  Location: .3S OF I-244 (Lat: 36.156556,  Lng: -95.991222),  Route carried "on" structure: City street 8275,  Year Built: 1930,  Year Reconstructed: 1982,  Status: Posted for load,  Structure Length: 11.99m (39.34ft),  Average Daily Traffic: 50 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 50 (year 2040),  Design Load: HS 20,  Features Intersected: B.N. R.R./ACCESS RD. UND,  Facility Carried by Structure: FAU 8273(BOSTON AV
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 30 degrees,  Material/Design: Concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 9,  Length of Maximum Span: 16.2m (53.1ft),  Curb or Sidewalk Widths: Left: 3.2m (10.5ft),  Right: 12.5m (41.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 37.2m (122.0ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Poor,  Operating Rating: 36.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Better than present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 7.99m (26.21ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $2,541,000,  Roadway Improvement Cost: $1,250,000,  Total Project Cost: $4,207,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 23143,  Location: 10800 E. 46TH ST. NORTH (Lat: 36.220417,  Lng: -95.858433),  Route carried "on" structure: City street 8440,  Year Built: 1975,  Status: Open,  Structure Length: 6.94m (22.77ft),  Average Daily Traffic: 5,600 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 8,960 (year 2040),  Design Load: HS 20,  Features Intersected: MINGO CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.459,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 22.9m (75.1ft),  Curb-To-Curb Width: 11.7m (38.4ft),  Out-to-Out Width: 12.5m (41.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Good,  Operating Rating: 65.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.2 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.64m (31.63ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $492,000,  Roadway Improvement Cost: $271,000,  Total Project Cost: $768,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 23267,  Location: .3 MI. N OF ADM. ON 129TH (Lat: 36.164394,  Lng: -95.833550),  Route carried "on" structure: City street N4030,  Year Built: 1970,  Status: Open,  Structure Length: 1.67m (5.48ft),  Average Daily Traffic: 2,000 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 3,200 (year 2040),  Design Load: HS 20,  Features Intersected: COOLEY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.448,  Lanes on structure: 4,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 6.3m (20.7ft),  Out-to-Out Width: 50.3m (165.0ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 42.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.53m (14.86ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $100,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $225,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 23535,  Location: 9500 E 61ST STREET (Lat: 36.075289,  Lng: -95.871039),  Route carried "on" structure: City street 8240,  Year Built: 1997,  Status: Open,  Structure Length: 1.33m (4.36ft),  Average Daily Traffic: 16,600 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 26,560 (year 2040),  Design Load: HS 20,  Features Intersected: MINGO CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.654,  Lanes on structure: 5,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 19.2m (63.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 19.2m (63.0ft),  Out-to-Out Width: 30.8m (101.0ft)

Condition: Channel: Good,  Culverts: Good,  Inventory Rating: 76.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.08m (13.39ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $100,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $225,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 23536,  Location: 3100 N PEORIA AVE (Lat: 36.198528,  Lng: -95.975719),  Route carried "on" structure: City street 8301,  Year Built: 1991,  Status: Open,  Structure Length: 1.94m (6.36ft),  Average Daily Traffic: 16,000 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 25,600 (year 2040),  Design Load: HS 20,  Features Intersected: DIRTY BUTTER CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 23.653,  Lanes on structure: 5,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 20.9m (68.6ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 5.2m (17.1ft),  Curb or Sidewalk Widths: Left: 2.1m (6.9ft),  Right: 2.1m (6.9ft),  Curb-To-Curb Width: 20.9m (68.6ft),  Out-to-Out Width: 28.5m (93.5ft)

Condition: Channel: Very good,  Culverts: Satisfactory,  Operating Rating: 52.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.59m (15.06ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $100,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $225,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 23604,  Location: 3500 E 91 S (Lat: 36.031847,  Lng: -95.937072),  Route carried "on" structure: City street 8180,  Year Built: 1993,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 14,500 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 23,200 (year 2040),  Design Load: HS 20,  Features Intersected: VENSEL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.367,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 10.7m (35.1ft),  Out-to-Out Width: 11.3m (37.1ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 61.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.63m (11.91ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $100,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $225,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 23934,  Location: 09.05S (Lat: 36.023736,  Lng: -95.942764),  Route carried "on" structure: Other road ,  Year Built: 1991,  Status: Open,  Structure Length: 3.84m (12.60ft),  Average Daily Traffic: 25,850 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 41,360 (year 2040),  Design Load: HS 20,  Features Intersected: VENSEL CREEK,  Facility Carried by Structure: CREEK TP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.806,  Lanes on structure: 2,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 11 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 38.4m (126.0ft),  Curb-To-Curb Width: 17.6m (57.7ft),  Out-to-Out Width: 18.6m (61.0ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 88.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.04m (23.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $542,000,  Roadway Improvement Cost: $813,000,  Total Project Cost: $1,554,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 23935,  Location: 11.00N (Lat: 36.026147,  Lng: -95.907431),  Route carried "on" structure: Other road ,  Year Built: 1991,  Status: Open,  Structure Length: 3.05m (10.01ft),  Average Daily Traffic: 26,700 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 42,720 (year 2040),  Design Load: HS 20,  Features Intersected: FRY CREEK,  Facility Carried by Structure: CREEK TP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.041,  Lanes on structure: 3,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 30.5m (100.1ft),  Curb-To-Curb Width: 16.9m (55.4ft),  Out-to-Out Width: 17.8m (58.4ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Inventory Rating: 67.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.23m (20.44ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $480,000,  Roadway Improvement Cost: $720,000,  Total Project Cost: $1,379,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 23936,  Location: 12.22N (Lat: 36.025325,  Lng: -95.886833),  Route carried "on" structure: Other road ,  Year Built: 1991,  Status: Open,  Structure Length: 6.83m (22.41ft),  Average Daily Traffic: 26,700 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 42,720 (year 2040),  Design Load: HS 20,  Features Intersected: U.S. 64 (MEMORIAL DR.)UN,  Facility Carried by Structure: CREEK TP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.908,  Lanes on structure: 3,  Lanes under structure: 6,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 13.7m (44.9ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 18.6m (61.0ft),  Curb-To-Curb Width: 16.9m (55.4ft),  Out-to-Out Width: 17.8m (58.4ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 69.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of replacement,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.83m (22.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $1,051,000,  Roadway Improvement Cost: $1,577,000,  Total Project Cost: $2,998,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 24312,  Location: S 91 ST & US 169 (Lat: 36.031619,  Lng: -95.860533),  Route carried "on" structure: US 169,  Year Built: 1991,  Status: Open,  Structure Length: 6.52m (21.39ft),  Average Daily Traffic: 45,000 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 72,000 (year 2040),  Design Load: HS 20,  Features Intersected: E 91 ST S UNDER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.639,  Lanes on structure: 2,  Lanes under structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Skew: 12 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 32.6m (107.0ft),  Curb-To-Curb Width: 17.7m (58.1ft),  Out-to-Out Width: 18.6m (61.0ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 91.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.17m (23.52ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $920,000,  Roadway Improvement Cost: $1,518,000,  Total Project Cost: $2,575,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Membrane: Epoxy,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 24313,  Location: S 91 ST & US 169 (Lat: 36.031622,  Lng: -95.861042),  Route carried "on" structure: US 169,  Year Built: 1991,  Status: Open,  Structure Length: 6.61m (21.69ft),  Average Daily Traffic: 49,700 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 79,520 (year 2040),  Design Load: HS 20,  Features Intersected: E 91 ST S UNDER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.639,  Lanes on structure: 2,  Lanes under structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.7m (58.1ft),  Skew: 12 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 33.2m (108.9ft),  Curb-To-Curb Width: 17.7m (58.1ft),  Out-to-Out Width: 18.6m (61.0ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 91.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.17m (23.52ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $920,000,  Roadway Improvement Cost: $1,518,000,  Total Project Cost: $2,575,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Membrane: Epoxy,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 24314,  Location: S 91 ST & US 169 (Lat: 36.025219,  Lng: -95.868603),  Route carried "on" structure: City street ,  Year Built: 1990,  Status: Open,  Structure Length: 8.47m (27.79ft),  Average Daily Traffic: 5,000 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 8,000 (year 2040),  Design Load: HS 20,  Features Intersected: U.S. 169 UNDER,  Facility Carried by Structure: MINGO RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.625,  Lanes on structure: 4,  Lanes under structure: 8,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Skew: 2 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 44.2m (145.0ft),  Curb or Sidewalk Widths: Left: 3.0m (9.8ft),  Right: 2.4m (7.9ft),  Curb-To-Curb Width: 20.4m (66.9ft),  Out-to-Out Width: 27.5m (90.2ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 65.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.91m (32.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $2,162,000,  Roadway Improvement Cost: $3,568,000,  Total Project Cost: $6,054,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Membrane: Epoxy,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 24315,  Location: S 81 ST & US 169 (Lat: 36.046086,  Lng: -95.858950),  Route carried "on" structure: US 169,  Year Built: 1991,  Status: Open,  Structure Length: 6.55m (21.49ft),  Average Daily Traffic: 99,400 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 159,040 (year 2040),  Design Load: HS 20,  Features Intersected: E 81 ST S UNDER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.265,  Lanes on structure: 8,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 20.7m (67.9ft),  Skew: 30 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 32.3m (106.0ft),  Curb-To-Curb Width: 41.5m (136.2ft),  Out-to-Out Width: 42.4m (139.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 92.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.21m (23.65ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $1,849,000,  Roadway Improvement Cost: $3,050,000,  Total Project Cost: $5,176,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Discuss Tulsa, Oklahoma (OK) on our hugely popular Oklahoma forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.