  • National Bridge Inventory (NBI) Statistics
  • 1,018Number of bridges
  • 12,605ft / 3,842mTotal length
  • $1,477,519,000Total costs
  • 19,139,960Total average daily traffic
  • 1,822,874Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Tulsa
  • No street view available for this location

New bridges in Tulsa, OK - historical statistics
  • New bridges - historical statistics
  • 11910-1919
  • 11920-1929
  • 91930-1939
  • 261940-1949
  • 221950-1959
  • 1971960-1969
  • 3341970-1979
  • 1101980-1989
  • 961990-1999
  • 1422000-2009
  • 692010-2019
  • 112020-2022
Reconstructed bridges in Tulsa, OK - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 61960-1969
  • 71970-1979
  • 121980-1989
  • 71990-1999
  • 142000-2009
  • 82010-2019
Average Bridge Daily Traffic in Tulsa, OK
Average Bridge Truck Traffic in Tulsa, OK
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 6.0%Excellent
  • 8.6%Very good
  • 53.4%Good
  • 19.6%Satisfactory
  • 10.3%Fair
  • 1.8%Poor
  • 0.3%Failed
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 7.3%Excellent
  • 25.7%Very good
  • 39.3%Good
  • 19.4%Satisfactory
  • 7.3%Fair
  • 1.0%Poor
  • 0.3%Critical
  • 0.3%Failed
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 2.0%Excellent
  • 17.4%Very good
  • 48.1%Good
  • 15.1%Satisfactory
  • 14.1%Fair
  • 3.0%Poor
  • 0.3%Failed
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 2.1%Excellent
  • 46.5%Very good
  • 24.2%Good
  • 15.6%Satisfactory
  • 9.5%Fair
  • 1.2%Poor
  • 0.9%Serious
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 9.1%Excellent
  • 41.1%Very good
  • 44.0%Good
  • 2.4%Satisfactory
  • 2.4%Fair
  • 1.0%Poor
  • 2.4%Serious
Find on map >>   Show street view

Structure Number: 18051,  Location: 0.4 MI E JCT I-244 (Lat: 36.145153,  Lng: -95.998256),  Route carried "on" structure: Ramp Interstate 444,  Year Built: 1971,  Status: Open,  Structure Length: 4.16m (13.65ft),  Average Daily Traffic: 35,000 (year 2020),  Truck Traffic: 12%,  Average Future Daily Traffic: 56,000 (year 2040),  Design Load: HL 93,  Features Intersected: HOUSTON AVE. UNDER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.191,  Lanes on structure: 1,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 19.8m (65.0ft),  Curb-To-Curb Width: 5.5m (18.0ft),  Out-to-Out Width: 6.4m (21.0ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 81.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 63.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.57m (14.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $586,000,  Roadway Improvement Cost: $966,000,  Total Project Cost: $1,640,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Membrane: Epoxy,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 18054,  Location: 5.6 MI N I-44 (Lat: 36.158833,  Lng: -96.001456),  Route carried "on" structure: Ramp US 244,  Year Built: 1971,  Status: Open,  Structure Length: 4.15m (13.62ft),  Average Daily Traffic: 30,950 (year 2020),  Truck Traffic: 12%,  Average Future Daily Traffic: 49,520 (year 2040),  Design Load: HS 20,  Features Intersected: I-244 S-W UNDER,  Facility Carried by Structure: U.S. 64 EB RAMP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.107,  Lanes on structure: 3,  Lanes under structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 14.0m (45.9ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 20.4m (66.9ft),  Curb-To-Curb Width: 14.0m (45.9ft),  Out-to-Out Width: 14.6m (47.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.44m (17.85ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $978,000,  Roadway Improvement Cost: $1,613,000,  Total Project Cost: $2,737,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Membrane: Epoxy,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 18055,  Location: 0.8 MI N SH 51 (Lat: 36.155556,  Lng: -95.980278),  Route carried "on" structure: City street ,  Year Built: 1971,  Status: Open,  Structure Length: 4.51m (14.80ft),  Average Daily Traffic: 3,900 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 6,240 (year 2040),  Design Load: HS 20,  Features Intersected: I-444 UNDER,  Facility Carried by Structure: 4TH ST.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.384,  Lanes on structure: 3,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 18.8m (61.7ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 22.6m (74.1ft),  Curb or Sidewalk Widths: Left: 2.1m (6.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 14.9m (48.9ft),  Out-to-Out Width: 19.4m (63.6ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Very good,  Operating Rating: 39.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.00m (26.25ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $1,745,000,  Roadway Improvement Cost: $2,879,000,  Total Project Cost: $4,885,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Membrane: Epoxy,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 18056,  Location: I-244 & SH 11 JCT (Lat: 36.161086,  Lng: -96.000331),  Route carried "on" structure: Ramp Interstate 244,  Year Built: 1971,  Status: Open,  Structure Length: 4.36m (14.30ft),  Average Daily Traffic: 11,145 (year 2020),  Truck Traffic: 12%,  Average Future Daily Traffic: 17,832 (year 2040),  Design Load: HS 20,  Features Intersected: EDISON ROAD UNDER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.259,  Lanes on structure: 3,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 11 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 54.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.10m (20.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $1,095,000,  Roadway Improvement Cost: $1,807,000,  Total Project Cost: $3,067,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 18057,  Location: I-244 & TISDALE (Lat: 36.161097,  Lng: -96.001208),  Route carried "on" structure: State highway ,  Year Built: 1971,  Status: Open,  Structure Length: 4.48m (14.70ft),  Average Daily Traffic: 11,145 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 17,832 (year 2040),  Design Load: HS 20,  Features Intersected: EDISON ROAD UNDER,  Facility Carried by Structure: TISDALE PKWY RAMP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.259,  Lanes on structure: 3,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Skew: 11 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 14.6m (47.9ft),  Out-to-Out Width: 15.2m (49.9ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 56.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.10m (20.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $1,095,000,  Roadway Improvement Cost: $1,807,000,  Total Project Cost: $3,067,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 18058,  Location: 0.1 MI N JCT I-244 (Lat: 36.161164,  Lng: -95.981308),  Route carried "on" structure: Ramp US 75,  Year Built: 1971,  Status: Open,  Structure Length: 4.30m (14.11ft),  Average Daily Traffic: 36,600 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 58,560 (year 2040),  Design Load: HS 20,  Features Intersected: U.S. 75 SB UNDER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.259,  Lanes on structure: 1,  Lanes under structure: 3,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 10 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 32.3m (106.0ft),  Curb-To-Curb Width: 6.4m (21.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 56.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.73m (15.52ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $607,000,  Roadway Improvement Cost: $1,001,000,  Total Project Cost: $1,699,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Membrane: Epoxy,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1806,  Location: 5.7 MI N I-44 (Lat: 36.160942,  Lng: -95.999531),  Route carried "on" structure: Ramp Interstate 244,  Year Built: 1971,  Status: Open,  Structure Length: 4.54m (14.90ft),  Average Daily Traffic: 27,500 (year 2020),  Truck Traffic: 12%,  Average Future Daily Traffic: 44,000 (year 2040),  Design Load: HS 20,  Features Intersected: DENVER AVE. UNDER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.316,  Lanes on structure: 1,  Lanes under structure: 5,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 24.1m (79.1ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.35m (17.55ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $686,000,  Roadway Improvement Cost: $1,132,000,  Total Project Cost: $1,921,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Membrane: Epoxy,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 18061,  Location: 6.9 MI N I-44 (Lat: 36.159383,  Lng: -95.979603),  Route carried "on" structure: Ramp Interstate 244,  Year Built: 1971,  Status: Open,  Structure Length: 4.42m (14.50ft),  Average Daily Traffic: 10,000 (year 2020),  Truck Traffic: 12%,  Average Future Daily Traffic: 16,000 (year 2040),  Design Load: HS 20,  Features Intersected: 1ST ST. UNDER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.166,  Lanes on structure: 1,  Lanes under structure: 3,  Owner: State Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Skew: 9 degrees,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 23.2m (76.1ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.7m (22.0ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 75.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.61m (18.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $720,000,  Roadway Improvement Cost: $1,188,000,  Total Project Cost: $2,017,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Membrane: Epoxy,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 18062,  Location: 15.2 MI E OSAGE CO (Lat: 36.160350,  Lng: -95.999214),  Route carried "on" structure: US 64,  Year Built: 1971,  Status: Open,  Structure Length: 4.30m (14.11ft),  Average Daily Traffic: 55,000 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 88,000 (year 2040),  Design Load: HS 20,  Features Intersected: DENVER AVE. UNDER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 24.586,  Lanes on structure: 3,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Skew: 10 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 22.6m (74.1ft),  Curb-To-Curb Width: 15.2m (49.9ft),  Out-to-Out Width: 16.2m (53.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 5.81m (19.06ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $746,000,  Roadway Improvement Cost: $1,231,000,  Total Project Cost: $2,088,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Membrane: Epoxy,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 18067,  Location: 5.5 MI N I-44 (Lat: 36.157781,  Lng: -96.000914),  Route carried "on" structure: Ramp Interstate 244,  Year Built: 1971,  Status: Open,  Structure Length: 4.69m (15.39ft),  Average Daily Traffic: 27,500 (year 2020),  Truck Traffic: 12%,  Average Future Daily Traffic: 44,000 (year 2040),  Design Load: HS 20,  Features Intersected: BIKE PATH UNDER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.962,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 4 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 17.7m (58.1ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.5m (41.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 72.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.30m (23.95ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $936,000,  Roadway Improvement Cost: $1,544,000,  Total Project Cost: $2,621,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Membrane: Epoxy,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 18068,  Location: 5.7 MI N I-44 (Lat: 36.160106,  Lng: -95.999114),  Route carried "on" structure: Interstate 244,  Year Built: 1971,  Status: Open,  Structure Length: 4.82m (15.81ft),  Average Daily Traffic: 31,350 (year 2020),  Truck Traffic: 12%,  Average Future Daily Traffic: 50,160 (year 2040),  Design Load: HS 20,  Features Intersected: DENVER AVE. UNDER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.316,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.8m (38.7ft),  Skew: 31 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 23.5m (77.1ft),  Curb-To-Curb Width: 11.8m (38.7ft),  Out-to-Out Width: 12.5m (41.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 73.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 6.10m (20.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $782,000,  Roadway Improvement Cost: $1,291,000,  Total Project Cost: $2,190,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Membrane: Epoxy,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1807,  Location: .1 MI N JCT I-244 (Lat: 36.162350,  Lng: -96.000919),  Route carried "on" structure: City street ,  Year Built: 1971,  Year Reconstructed: 2013,  Status: Open,  Structure Length: 4.83m (15.85ft),  Average Daily Traffic: 2,000 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 3,200 (year 2040),  Design Load: HS 20,  Features Intersected: TISDALE PKWY RAMP,  Facility Carried by Structure: FAIRVIEW ST.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.518,  Lanes on structure: 2,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 13.1m (43.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 24.1m (79.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 13.1m (43.0ft),  Out-to-Out Width: 16.8m (55.1ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 75.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.03m (26.35ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $1,442,000,  Roadway Improvement Cost: $2,380,000,  Total Project Cost: $4,038,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Membrane: Epoxy,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 18071,  Location: 0.9 MI N SH 51 (Lat: 36.156667,  Lng: -95.980278),  Route carried "on" structure: City street ,  Year Built: 1971,  Status: Open,  Structure Length: 5.12m (16.80ft),  Average Daily Traffic: 2,000 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 3,200 (year 2040),  Design Load: HS 20,  Features Intersected: I-444 UNDER,  Facility Carried by Structure: 3RD ST.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.465,  Lanes on structure: 2,  Lanes under structure: 7,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 25.6m (84.0ft),  Curb or Sidewalk Widths: Left: 2.1m (6.9ft),  Right: 2.6m (8.5ft),  Curb-To-Curb Width: 15.2m (49.9ft),  Out-to-Out Width: 20.6m (67.6ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 49.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.00m (26.25ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $1,745,000,  Roadway Improvement Cost: $2,879,000,  Total Project Cost: $4,885,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 18075,  Location: 6.5 MI N I-44 (Lat: 36.161111,  Lng: -95.986825),  Route carried "on" structure: Interstate 244,  Year Built: 1971,  Status: Open,  Structure Length: 5.15m (16.90ft),  Average Daily Traffic: 32,000 (year 2020),  Truck Traffic: 12%,  Average Future Daily Traffic: 51,200 (year 2040),  Design Load: HS 20,  Features Intersected: GREENWOOD AVE. UNDER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.491,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.9m (48.9ft),  Skew: 12 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 24.1m (79.1ft),  Curb-To-Curb Width: 14.9m (48.9ft),  Out-to-Out Width: 15.8m (51.8ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 65.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.17m (20.24ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $1,108,000,  Roadway Improvement Cost: $1,829,000,  Total Project Cost: $3,104,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Membrane: Epoxy,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 18079,  Location: 5.5 MI N I-44 (Lat: 36.157356,  Lng: -96.001944),  Route carried "on" structure: Interstate 244,  Year Built: 1971,  Status: Open,  Structure Length: 5.27m (17.29ft),  Average Daily Traffic: 29,500 (year 2020),  Truck Traffic: 12%,  Average Future Daily Traffic: 47,200 (year 2040),  Design Load: HS 20,  Features Intersected: BIKE PATH UNDER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.962,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.0m (45.9ft),  Skew: 11 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 19.5m (64.0ft),  Curb-To-Curb Width: 14.0m (45.9ft),  Out-to-Out Width: 14.6m (47.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 55.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.00m (19.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $1,078,000,  Roadway Improvement Cost: $1,778,000,  Total Project Cost: $3,018,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Membrane: Epoxy,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 18082,  Location: 15.0 MI E OSAGE CO. (Lat: 36.157472,  Lng: -96.002764),  Route carried "on" structure: Ramp US 64,  Year Built: 1971,  Status: Open,  Structure Length: 5.43m (17.81ft),  Average Daily Traffic: 15,000 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 24,000 (year 2040),  Design Load: HS 20,  Features Intersected: BIKE PATH UNDER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 24.151,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 4 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 17.1m (56.1ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 73.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 8.04m (26.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $1,031,000,  Roadway Improvement Cost: $1,701,000,  Total Project Cost: $2,887,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Membrane: Epoxy,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 18089,  Location: 5.5 MI N I-44 (Lat: 36.157875,  Lng: -96.000653),  Route carried "on" structure: Interstate 244,  Year Built: 1971,  Status: Open,  Structure Length: 5.79m (19.00ft),  Average Daily Traffic: 29,500 (year 2020),  Truck Traffic: 12%,  Average Future Daily Traffic: 47,200 (year 2040),  Design Load: HS 20,  Features Intersected: BIKE PATH UNDER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.962,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 19.5m (64.0ft),  Skew: 5 degrees,  Material/Design: Steel continuous,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 22.3m (73.2ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.1m (39.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 48.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.35m (33.96ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $1,327,000,  Roadway Improvement Cost: $2,190,000,  Total Project Cost: $3,716,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Membrane: Epoxy,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 18094,  Location: 4.8 MI N JCT I-44 (Lat: 36.205833,  Lng: -95.851389),  Route carried "on" structure: City street ,  Year Built: 1971,  Status: Open,  Structure Length: 6.11m (20.05ft),  Average Daily Traffic: 5,000 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 8,000 (year 2040),  Design Load: HS 20,  Features Intersected: U.S. 169 UNDER,  Facility Carried by Structure: E. 36TH N. ST.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.498,  Lanes on structure: 6,  Lanes under structure: 8,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 20 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 30.5m (100.1ft),  Curb-To-Curb Width: 34.7m (113.8ft),  Out-to-Out Width: 35.7m (117.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 61.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.00m (26.25ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $2,052,000,  Roadway Improvement Cost: $3,387,000,  Total Project Cost: $5,747,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 18097,  Location: 1.41 MI N SH 51 (Lat: 36.157636,  Lng: -95.980689),  Route carried "on" structure: City street ,  Year Built: 1971,  Status: Open,  Structure Length: 6.66m (21.85ft),  Average Daily Traffic: 5,000 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 8,000 (year 2040),  Design Load: HS 20,  Features Intersected: I-444 UNDER,  Facility Carried by Structure: 2ND ST.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.706,  Lanes on structure: 3,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 28.7m (94.2ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 18.0m (59.1ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Very good,  Operating Rating: 44.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.5 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: High priority of corrective action,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.29m (33.76ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $2,014,000,  Roadway Improvement Cost: $3,324,000,  Total Project Cost: $5,641,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Membrane: Epoxy,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 18102,  Location: 6.5 MI N I-44 (Lat: 36.160803,  Lng: -95.986919),  Route carried "on" structure: Interstate 244,  Year Built: 1971,  Year Reconstructed: 1987,  Status: Open,  Structure Length: 6.64m (21.78ft),  Average Daily Traffic: 33,200 (year 2020),  Truck Traffic: 12%,  Average Future Daily Traffic: 53,120 (year 2040),  Design Load: HS 20,  Features Intersected: GREENWOOD AVE. UNDER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.491,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Skew: 14 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 35.1m (115.2ft),  Curb-To-Curb Width: 15.2m (49.9ft),  Out-to-Out Width: 15.8m (51.8ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 60.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.70m (21.98ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $1,203,000,  Roadway Improvement Cost: $1,985,000,  Total Project Cost: $3,368,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Membrane: Epoxy,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1811,  Location: 6.9 MI N I-44 (Lat: 36.158511,  Lng: -95.980219),  Route carried "on" structure: Ramp Interstate 244,  Year Built: 1971,  Status: Open,  Structure Length: 7.44m (24.41ft),  Average Daily Traffic: 10,000 (year 2020),  Truck Traffic: 12%,  Average Future Daily Traffic: 16,000 (year 2040),  Design Load: HS 20,  Features Intersected: I-444 NB UNDER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.150,  Lanes on structure: 1,  Lanes under structure: 3,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 9 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 25.6m (84.0ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 7.0m (23.0ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 73.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of replacement,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.45m (31.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $1,212,000,  Roadway Improvement Cost: $2,000,000,  Total Project Cost: $3,394,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Membrane: Epoxy,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 18111,  Location: 0.1 MI N JCT I-244 (Lat: 36.162311,  Lng: -95.981183),  Route carried "on" structure: City street ,  Year Built: 1971,  Status: Open,  Structure Length: 7.77m (25.49ft),  Average Daily Traffic: 5,000 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 8,000 (year 2040),  Design Load: HS 20,  Features Intersected: U.S. 75 UNDER,  Facility Carried by Structure: ARCHER ST.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.290,  Lanes on structure: 2,  Lanes under structure: 9,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 39.3m (128.9ft),  Curb or Sidewalk Widths: Left: 2.1m (6.9ft),  Right: 2.4m (7.9ft),  Curb-To-Curb Width: 15.2m (49.9ft),  Out-to-Out Width: 21.0m (68.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Fair,  Operating Rating: 47.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.00m (26.25ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $1,745,000,  Roadway Improvement Cost: $2,879,000,  Total Project Cost: $4,885,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 18113,  Location: I-244 & 75 JCT. (Lat: 36.160519,  Lng: -95.981203),  Route carried "on" structure: Ramp Interstate 75,  Year Built: 1971,  Status: Open,  Structure Length: 7.62m (25.00ft),  Average Daily Traffic: 36,700 (year 2020),  Truck Traffic: 12%,  Average Future Daily Traffic: 58,720 (year 2040),  Design Load: HS 20,  Features Intersected: U.S. 75 & RAMP UNDER,  Facility Carried by Structure: I-244 RAMP W-N
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.097,  Lanes on structure: 1,  Lanes under structure: 5,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 10 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 33.2m (108.9ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 44.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.5 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.38m (27.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $1,075,000,  Roadway Improvement Cost: $1,774,000,  Total Project Cost: $3,011,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Membrane: Epoxy,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 18118,  Location: 5.7 MI N I-44 (Lat: 36.160261,  Lng: -96.001208),  Route carried "on" structure: Ramp City street 11,  Year Built: 1971,  Status: Open,  Structure Length: 8.75m (28.71ft),  Average Daily Traffic: 29,500 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 47,200 (year 2040),  Design Load: HS 20,  Features Intersected: I-244 WB E-S UNDER,  Facility Carried by Structure: TISDALE EXPY N-E
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.220,  Lanes on structure: 1,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 9 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 17.7m (58.1ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 11.11m (36.45ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $1,426,000,  Roadway Improvement Cost: $2,352,000,  Total Project Cost: $3,992,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 18127,  Location: 5.7 MI N I-44 (Lat: 36.159794,  Lng: -95.999883),  Route carried "on" structure: City street 11,  Year Built: 1971,  Status: Open,  Structure Length: 10.70m (35.10ft),  Average Daily Traffic: 30,000 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 48,000 (year 2040),  Design Load: HS 20,  Features Intersected: I-244 UNDER,  Facility Carried by Structure: TISDALE EXPY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.259,  Lanes on structure: 2,  Lanes under structure: 7,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 9 degrees,  Material/Design: Steel continuous,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 27.4m (89.9ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 13.59m (44.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $1,743,000,  Roadway Improvement Cost: $2,877,000,  Total Project Cost: $4,882,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Membrane: Epoxy,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 18128,  Location: 6.9 MI N I-44 (Lat: 36.158642,  Lng: -95.980764),  Route carried "on" structure: Ramp Interstate 244,  Year Built: 1971,  Status: Open,  Structure Length: 10.88m (35.70ft),  Average Daily Traffic: 72,000 (year 2020),  Truck Traffic: 12%,  Average Future Daily Traffic: 115,200 (year 2040),  Design Load: HS 20,  Features Intersected: I-444 UNDER
Minimum Vertical Clearance: 6.37m (20.90ft),  Kilometerpoint: 11.117,  Lanes on structure: 2,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Skew: 9 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 25.0m (82.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 55.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Underclear: High priority of replacement,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 13.82m (45.34ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $1,773,000,  Roadway Improvement Cost: $2,925,000,  Total Project Cost: $4,964,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Membrane: Epoxy,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 18129,  Location: 0.5 MI E JCT I-244 (Lat: 36.145169,  Lng: -95.995083),  Route carried "on" structure: City street ,  Year Built: 1971,  Status: Open,  Structure Length: 11.03m (36.19ft),  Average Daily Traffic: 2,100 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 3,360 (year 2040),  Design Load: HS 20,  Features Intersected: U.S. 64 / US 75 / SH 51,  Facility Carried by Structure: 12TH ST.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.014,  Lanes on structure: 4,  Lanes under structure: 8,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Skew: 4 degrees,  Material/Design: Steel continuous,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 2,  Length of Maximum Span: 40.8m (133.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 15.2m (49.9ft),  Out-to-Out Width: 19.2m (63.0ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 54.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Underclear: High priority of replacement,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 12.45m (40.85ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $2,714,000,  Roadway Improvement Cost: $4,478,000,  Total Project Cost: $7,599,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 18132,  Location: US75 & I-444 JCT (Lat: 36.159064,  Lng: -95.979128),  Route carried "on" structure: Ramp US 75,  Year Built: 1971,  Status: Open,  Structure Length: 12.09m (39.67ft),  Average Daily Traffic: 34,000 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 54,400 (year 2040),  Design Load: HS 20,  Features Intersected: 2ND/ 1 ST. & US75 UNDER
Minimum Vertical Clearance: 5.99m (19.65ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Steel continuous,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 32.6m (107.0ft),  Curb-To-Curb Width: 5.8m (19.0ft),  Out-to-Out Width: 6.7m (22.0ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Very good,  Operating Rating: 44.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.5 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 13.28m (43.57ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $1,703,000,  Roadway Improvement Cost: $2,810,000,  Total Project Cost: $4,769,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Membrane: Epoxy,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 18136,  Location: 5.6 MI N I-44 (Lat: 36.158206,  Lng: -96.002106),  Route carried "on" structure: Interstate 244,  Year Built: 1971,  Status: Open,  Structure Length: 12.59m (41.31ft),  Average Daily Traffic: 31,350 (year 2020),  Truck Traffic: 12%,  Average Future Daily Traffic: 50,160 (year 2040),  Design Load: HS 20,  Features Intersected: U.S. 64 UNDER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.059,  Lanes on structure: 2,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Skew: 9 degrees,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 32.0m (105.0ft),  Curb-To-Curb Width: 13.7m (44.9ft),  Out-to-Out Width: 14.3m (46.9ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 15.99m (52.46ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Critical Feature Inspection Date: November 2021,  Bridge Improvement Cost: $2,872,000,  Roadway Improvement Cost: $4,500,000,  Total Project Cost: $7,789,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 18145,  Location: 6.7 MI N I-44 (Lat: 36.159694,  Lng: -95.982836),  Route carried "on" structure: Interstate 244,  Year Built: 1971,  Status: Open,  Structure Length: 31.58m (103.61ft),  Average Daily Traffic: 33,200 (year 2020),  Truck Traffic: 12%,  Average Future Daily Traffic: 53,120 (year 2040),  Design Load: HS 20,  Features Intersected: I-444 / BNSF R.R. UNDER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.878,  Lanes on structure: 2,  Lanes under structure: 10,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 16.2m (53.1ft),  Skew: 14 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 16,  Length of Maximum Span: 25.6m (84.0ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.1m (39.7ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 51.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of replacement,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 40.11m (131.59ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Critical Feature Inspection Date: March 2020,  Bridge Improvement Cost: $6,054,000,  Roadway Improvement Cost: $4,500,000,  Total Project Cost: $11,151,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 18146,  Location: 6.6 MI N I-44 (Lat: 36.160742,  Lng: -95.984808),  Route carried "on" structure: Interstate 244,  Year Built: 1971,  Status: Open,  Structure Length: 55.41m (181.79ft),  Average Daily Traffic: 32,000 (year 2020),  Truck Traffic: 12%,  Average Future Daily Traffic: 51,200 (year 2040),  Design Load: HS 20,  Features Intersected: I-444 & SK&O R.R. UNDER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.194,  Lanes on structure: 2,  Lanes under structure: 17,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 19 degrees,  Material/Design: Steel continuous,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 23,  Length of Maximum Span: 39.9m (130.9ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.1m (39.7ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of replacement,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 70.38m (230.91ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Critical Feature Inspection Date: March 2020,  Other Special Inspection Date: March 2021,  Bridge Improvement Cost: $10,622,000,  Roadway Improvement Cost: $4,500,000,  Total Project Cost: $15,977,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 18169,  Location: 300 FT W US - 75 (Lat: 36.206653,  Lng: -95.947872),  Route carried "on" structure: Ramp US 75,  Year Built: 1972,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 12,500 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 20,000 (year 2040),  Design Load: HS 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.355,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 2.4m (7.9ft)

Condition: Channel: Fair,  Culverts: Very good,  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.76m (2.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $230,000,  Roadway Improvement Cost: $380,000,  Total Project Cost: $644,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 1817,  Location: 4.5 MI N I-244 (Lat: 36.215019,  Lng: -95.944244),  Route carried "on" structure: US 75,  Year Built: 1972,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 38,900 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 62,240 (year 2040),  Design Load: HS 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.808,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 76.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.67m (2.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $232,000,  Roadway Improvement Cost: $382,000,  Total Project Cost: $649,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 18253,  Location: 2.7 MI N I-44 (Lat: 36.118653,  Lng: -96.008686),  Route carried "on" structure: Interstate 244,  Year Built: 1972,  Status: Open,  Structure Length: 2.47m (8.10ft),  Average Daily Traffic: 69,000 (year 2020),  Truck Traffic: 12%,  Average Future Daily Traffic: 110,400 (year 2040),  Design Load: HS 20,  Features Intersected: 31ST ST. UNDER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.224,  Lanes on structure: 6,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Skew: 21 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 24.4m (80.1ft),  Curb-To-Curb Width: 32.9m (107.9ft),  Out-to-Out Width: 33.2m (108.9ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 57.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.89m (19.32ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $1,511,000,  Roadway Improvement Cost: $2,493,000,  Total Project Cost: $4,231,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 18254,  Location: 10.5 MI N JCT SH 67 (Lat: 36.096989,  Lng: -96.006531),  Route carried "on" structure: US 75,  Year Built: 1972,  Status: Open,  Structure Length: 2.44m (8.01ft),  Average Daily Traffic: 25,300 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 40,480 (year 2040),  Design Load: HS 20,  Features Intersected: 46TH ST. UNDER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 16.943,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 10 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 23.8m (78.1ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.0m (39.4ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 73.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.83m (19.13ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $748,000,  Roadway Improvement Cost: $1,234,000,  Total Project Cost: $2,095,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 18255,  Location: 10.5 MI N JCT SH 67 (Lat: 36.096992,  Lng: -96.006897),  Route carried "on" structure: US 75,  Year Built: 1972,  Status: Open,  Structure Length: 2.44m (8.01ft),  Average Daily Traffic: 25,050 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 40,080 (year 2040),  Design Load: HS 20,  Features Intersected: 46TH ST. UNDER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 16.943,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 10 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 23.8m (78.1ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 73.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.80m (19.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $744,000,  Roadway Improvement Cost: $1,228,000,  Total Project Cost: $2,083,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 18266,  Location: 5.9 MI N I-244 (Lat: 36.235014,  Lng: -95.944897),  Route carried "on" structure: US 75,  Year Built: 1972,  Status: Open,  Structure Length: 3.05m (10.01ft),  Average Daily Traffic: 16,400 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 26,240 (year 2040),  Design Load: HS 20,  Features Intersected: 56TH ST. UNDER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.574,  Lanes on structure: 3,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 16.5m (54.1ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 30.5m (100.1ft),  Curb-To-Curb Width: 16.7m (54.8ft),  Out-to-Out Width: 17.6m (57.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 61.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.80m (19.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $1,042,000,  Roadway Improvement Cost: $1,719,000,  Total Project Cost: $2,917,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete