Bridge Statistics for Los Angeles, California (CA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs
- National Bridge Inventory (NBI) Statistics
- 2,325Number of bridges
- 39,718ft / 12,106mTotal length
- $98,718,000Total costs
- 180,570,830Total average daily traffic
- 9,950,919Total average daily truck traffic
- National Bridge Inventory (NBI) Registered Bridges for Los Angeles
- No street view available for this location
- New bridges - historical statistics
- 121900-1909
- 41910-1919
- 431920-1929
- 721930-1939
- 1701940-1949
- 5201950-1959
- 6961960-1969
- 3091970-1979
- 1881980-1989
- 2231990-1999
- 512000-2009
- 372010-2019
- Reconstructed bridges - Historical Statistics
- 11920-1929
- 31930-1939
- 51940-1949
- 181950-1959
- 501960-1969
- 341970-1979
- 461980-1989
- 421990-1999
- 702000-2009
- 132010-2019
- Bridge Condition - Deck
- 81.7%Good
- 1.1%Satisfactory
- 15.5%Fair
- 1.7%Poor
- Bridge Condition - Superstructure
- 0.5%Very good
- 89.2%Good
- 1.1%Satisfactory
- 9.2%Fair
- Bridge Condition - Substructure
- 94.1%Good
- 2.3%Satisfactory
- 3.4%Fair
- 0.2%Poor
- Bridge Condition - Channel
- 16.2%Excellent
- 77.2%Very good
- 2.7%Good
- 2.2%Satisfactory
- 1.7%Fair
- 0.5%Poor
- 0.2%Serious
- Bridge Condition - Culverts
- 76.5%Good
- 23.5%Satisfactory
Find on map >> Show street view
Structure Number: 53 1105, Location: 07-LA-110-24.37-LA (Lat: 34.067683, Lng: -118.239544), Route carried "under" structure: Ramp State highway 110, Year Built: 1962, Structure Length: 0. m, Average Daily Traffic: 3,000 (year 2011), Truck Traffic: 1%, Features Intersected: STATE ROUTE 110 & RAMPS, Facility Carried by Structure: PEDESTRIAN WALKWAY
Minimum Vertical Clearance: 5.59m (18.34ft), Kilometerpoint: 24.370, Lanes under structure: 2, Material/Design: Concrete, Design/Construction: Slab, Length of Maximum Span: 46.6m (152.9ft)
Structure Number: 53 1105, Location: 07-LA-110-24.37-LA (Lat: 34.067683, Lng: -118.239544), Route carried "under" structure: Ramp State highway 110, Year Built: 1962, Structure Length: 0. m, Average Daily Traffic: 3,000 (year 2011), Truck Traffic: 1%, Features Intersected: STATE ROUTE 110 & RAMPS, Facility Carried by Structure: PEDESTRIAN WALKWAY
Minimum Vertical Clearance: 5.59m (18.34ft), Kilometerpoint: 24.370, Lanes under structure: 2, Material/Design: Concrete, Design/Construction: Slab, Length of Maximum Span: 46.6m (152.9ft)
Find on map >> Show street view
Structure Number: 53 1107, Location: 07-LA-005S-25.33-LA (Lat: 34.141831, Lng: -118.269761), Route carried "under" structure: Spur Interstate 5, Year Built: 1957, Structure Length: 0. m, Average Daily Traffic: 19,000 (year 1998), Truck Traffic: 8%, Features Intersected: I-5 SUPPLEMENTAL ROUTE, Facility Carried by Structure: SAN FERNANDO RD W
Minimum Vertical Clearance: 4.62m (15.16ft), Kilometerpoint: 25.330, Lanes on structure: 2, Lanes under structure: 10, Material/Design: Concrete continuous, Design/Construction: Slab, Length of Maximum Span: 13.8m (45.3ft)
Structure Number: 53 1107, Location: 07-LA-005S-25.33-LA (Lat: 34.141831, Lng: -118.269761), Route carried "under" structure: Spur Interstate 5, Year Built: 1957, Structure Length: 0. m, Average Daily Traffic: 19,000 (year 1998), Truck Traffic: 8%, Features Intersected: I-5 SUPPLEMENTAL ROUTE, Facility Carried by Structure: SAN FERNANDO RD W
Minimum Vertical Clearance: 4.62m (15.16ft), Kilometerpoint: 25.330, Lanes on structure: 2, Lanes under structure: 10, Material/Design: Concrete continuous, Design/Construction: Slab, Length of Maximum Span: 13.8m (45.3ft)
Find on map >> Show street view
Structure Number: 53 1112, Location: 07-LA-005-32.35-LA (Lat: 34.212336, Lng: -118.348331), Route carried "under" structure: City street L427, Year Built: 1960, Structure Length: 0. m, Average Daily Traffic: 12,400 (year 2009), Truck Traffic: 2%, Features Intersected: HOLLYWOOD WAY, Facility Carried by Structure: INTERSTATE 5
Minimum Vertical Clearance: 4.50m (14.76ft), Kilometerpoint: 0.000, Lanes on structure: 10, Lanes under structure: 5, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 21.6m (70.9ft)
Structure Number: 53 1112, Location: 07-LA-005-32.35-LA (Lat: 34.212336, Lng: -118.348331), Route carried "under" structure: City street L427, Year Built: 1960, Structure Length: 0. m, Average Daily Traffic: 12,400 (year 2009), Truck Traffic: 2%, Features Intersected: HOLLYWOOD WAY, Facility Carried by Structure: INTERSTATE 5
Minimum Vertical Clearance: 4.50m (14.76ft), Kilometerpoint: 0.000, Lanes on structure: 10, Lanes under structure: 5, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 21.6m (70.9ft)
Find on map >> Show street view
Structure Number: 53 1114, Location: 07-LA-005-33.68-LA (Lat: 34.221744, Lng: -118.366714), Route carried "under" structure: Interstate 5, Year Built: 1961, Structure Length: 0. m, Average Daily Traffic: 187,358 (year 2011), Truck Traffic: 9%, Features Intersected: I 5, Facility Carried by Structure: SUNLAND BLVD
Minimum Vertical Clearance: 4.62m (15.16ft), Kilometerpoint: 33.680, Lanes on structure: 6, Lanes under structure: 8, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 25.0m (82.0ft)
Structure Number: 53 1114, Location: 07-LA-005-33.68-LA (Lat: 34.221744, Lng: -118.366714), Route carried "under" structure: Interstate 5, Year Built: 1961, Structure Length: 0. m, Average Daily Traffic: 187,358 (year 2011), Truck Traffic: 9%, Features Intersected: I 5, Facility Carried by Structure: SUNLAND BLVD
Minimum Vertical Clearance: 4.62m (15.16ft), Kilometerpoint: 33.680, Lanes on structure: 6, Lanes under structure: 8, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 25.0m (82.0ft)
Find on map >> Show street view
Structure Number: 53 1118, Location: 07-LA-005-34.99-LA (Lat: 34.226308, Lng: -118.387642), Route carried "under" structure: Interstate 5, Year Built: 1961, Structure Length: 0. m, Average Daily Traffic: 187,358 (year 2011), Truck Traffic: 9%, Features Intersected: ROUTE 5, Facility Carried by Structure: LANKERSHIM BLVD
Minimum Vertical Clearance: 4.62m (15.16ft), Kilometerpoint: 34.990, Lanes on structure: 5, Lanes under structure: 9, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 25.6m (84.0ft)
Structure Number: 53 1118, Location: 07-LA-005-34.99-LA (Lat: 34.226308, Lng: -118.387642), Route carried "under" structure: Interstate 5, Year Built: 1961, Structure Length: 0. m, Average Daily Traffic: 187,358 (year 2011), Truck Traffic: 9%, Features Intersected: ROUTE 5, Facility Carried by Structure: LANKERSHIM BLVD
Minimum Vertical Clearance: 4.62m (15.16ft), Kilometerpoint: 34.990, Lanes on structure: 5, Lanes under structure: 9, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 25.6m (84.0ft)
Find on map >> Show street view
Structure Number: 53 1119, Location: 07-LA-005-35.35-LA (Lat: 34.228792, Lng: -118.393539), Route carried "under" structure: Interstate 5, Year Built: 1963, Structure Length: 0. m, Average Daily Traffic: 187,358 (year 2011), Truck Traffic: 9%, Features Intersected: ROUTE 5, Facility Carried by Structure: PEORIA STREET
Minimum Vertical Clearance: 4.70m (15.42ft), Kilometerpoint: 35.350, Lanes on structure: 2, Lanes under structure: 8, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 22.9m (75.1ft)
Structure Number: 53 1119, Location: 07-LA-005-35.35-LA (Lat: 34.228792, Lng: -118.393539), Route carried "under" structure: Interstate 5, Year Built: 1963, Structure Length: 0. m, Average Daily Traffic: 187,358 (year 2011), Truck Traffic: 9%, Features Intersected: ROUTE 5, Facility Carried by Structure: PEORIA STREET
Minimum Vertical Clearance: 4.70m (15.42ft), Kilometerpoint: 35.350, Lanes on structure: 2, Lanes under structure: 8, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 22.9m (75.1ft)
Find on map >> Show street view
Structure Number: 53 112, Location: 07-LA-005-36.00-LA (Lat: 34.231444, Lng: -118.404297), Route carried "under" structure: Interstate 5, Year Built: 1963, Structure Length: 0. m, Average Daily Traffic: 187,358 (year 2011), Truck Traffic: 9%, Features Intersected: ROUTE 5, Facility Carried by Structure: SHELDON STREET
Minimum Vertical Clearance: 4.52m (14.83ft), Kilometerpoint: 36.000, Lanes on structure: 5, Lanes under structure: 10, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 27.9m (91.5ft)
Structure Number: 53 112, Location: 07-LA-005-36.00-LA (Lat: 34.231444, Lng: -118.404297), Route carried "under" structure: Interstate 5, Year Built: 1963, Structure Length: 0. m, Average Daily Traffic: 187,358 (year 2011), Truck Traffic: 9%, Features Intersected: ROUTE 5, Facility Carried by Structure: SHELDON STREET
Minimum Vertical Clearance: 4.52m (14.83ft), Kilometerpoint: 36.000, Lanes on structure: 5, Lanes under structure: 10, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 27.9m (91.5ft)
Find on map >> Show street view
Structure Number: 53 1133, Location: 07-LA-005-41.57-LA (Lat: 34.291528, Lng: -118.467794), Route carried "under" structure: Ramp Interstate 405, Year Built: 1963, Structure Length: 0. m, Average Daily Traffic: 97,600 (year 2013), Truck Traffic: 15%, Features Intersected: N405-N5 CONNECTOR RAMP, Facility Carried by Structure: I-5
Minimum Vertical Clearance: 4.62m (15.16ft), Kilometerpoint: 48.640, Lanes on structure: 6, Lanes under structure: 4, Material/Design: Concrete, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 63.1m (207.0ft)
Structure Number: 53 1133, Location: 07-LA-005-41.57-LA (Lat: 34.291528, Lng: -118.467794), Route carried "under" structure: Ramp Interstate 405, Year Built: 1963, Structure Length: 0. m, Average Daily Traffic: 97,600 (year 2013), Truck Traffic: 15%, Features Intersected: N405-N5 CONNECTOR RAMP, Facility Carried by Structure: I-5
Minimum Vertical Clearance: 4.62m (15.16ft), Kilometerpoint: 48.640, Lanes on structure: 6, Lanes under structure: 4, Material/Design: Concrete, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 63.1m (207.0ft)
Find on map >> Show street view
Structure Number: 53 1137, Location: 07-LA-405-12.95-LA (Lat: 33.857022, Lng: -118.284336), Route carried "under" structure: Interstate 110, Year Built: 1961, Structure Length: 0. m, Average Daily Traffic: 218,800 (year 2019), Truck Traffic: 6%, Features Intersected: INTERSTATE 110, Facility Carried by Structure: INTERSTATE 405
Minimum Vertical Clearance: 5.68m (18.64ft), Kilometerpoint: 8.780, Lanes on structure: 10, Lanes under structure: 8, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 25.6m (84.0ft)
Structure Number: 53 1137, Location: 07-LA-405-12.95-LA (Lat: 33.857022, Lng: -118.284336), Route carried "under" structure: Interstate 110, Year Built: 1961, Structure Length: 0. m, Average Daily Traffic: 218,800 (year 2019), Truck Traffic: 6%, Features Intersected: INTERSTATE 110, Facility Carried by Structure: INTERSTATE 405
Minimum Vertical Clearance: 5.68m (18.64ft), Kilometerpoint: 8.780, Lanes on structure: 10, Lanes under structure: 8, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 25.6m (84.0ft)
Find on map >> Show street view
Structure Number: 53 1137F, Location: 07-LA-110-8.75-LA (Lat: 33.856717, Lng: -118.285053), Route carried "under" structure: Interstate 110, Year Built: 1961, Structure Length: 0. m, Average Daily Traffic: 199,500 (year 2015), Truck Traffic: 10%, Features Intersected: I 110
Minimum Vertical Clearance: 4.80m (15.75ft), Kilometerpoint: 8.750, Lanes on structure: 2, Lanes under structure: 8, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 24.4m (80.1ft)
Structure Number: 53 1137F, Location: 07-LA-110-8.75-LA (Lat: 33.856717, Lng: -118.285053), Route carried "under" structure: Interstate 110, Year Built: 1961, Structure Length: 0. m, Average Daily Traffic: 199,500 (year 2015), Truck Traffic: 10%, Features Intersected: I 110
Minimum Vertical Clearance: 4.80m (15.75ft), Kilometerpoint: 8.750, Lanes on structure: 2, Lanes under structure: 8, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 24.4m (80.1ft)
Find on map >> Show street view
Structure Number: 53 1142, Location: 07-LA-405-13.06-LA (Lat: 33.857931, Lng: -118.286133), Route carried "under" structure: Ramp Interstate 110, Year Built: 1961, Structure Length: 0. m, Average Daily Traffic: 220,000 (year 2011), Truck Traffic: 6%, Features Intersected: S110-S405 CONNECTOR RAMP, Facility Carried by Structure: INTERSTATE 405
Minimum Vertical Clearance: 4.69m (15.39ft), Kilometerpoint: 8.790, Lanes on structure: 9, Lanes under structure: 2, Material/Design: Concrete, Design/Construction: Frame, Length of Maximum Span: 23.5m (77.1ft)
Structure Number: 53 1142, Location: 07-LA-405-13.06-LA (Lat: 33.857931, Lng: -118.286133), Route carried "under" structure: Ramp Interstate 110, Year Built: 1961, Structure Length: 0. m, Average Daily Traffic: 220,000 (year 2011), Truck Traffic: 6%, Features Intersected: S110-S405 CONNECTOR RAMP, Facility Carried by Structure: INTERSTATE 405
Minimum Vertical Clearance: 4.69m (15.39ft), Kilometerpoint: 8.790, Lanes on structure: 9, Lanes under structure: 2, Material/Design: Concrete, Design/Construction: Frame, Length of Maximum Span: 23.5m (77.1ft)
Find on map >> Show street view
Structure Number: 53 1144, Location: 07-LA-405-13.28-LA (Lat: 33.859189, Lng: -118.289133), Route carried "under" structure: City street L074, Year Built: 1962, Structure Length: 0. m, Average Daily Traffic: 20,000 (year 2019), Truck Traffic: 1%, Features Intersected: VERMONT AVE, 190TH ST, Facility Carried by Structure: INTERSTATE 405
Minimum Vertical Clearance: 5.00m (16.40ft), Kilometerpoint: 0.000, Lanes on structure: 10, Lanes under structure: 4, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 36.3m (119.1ft)
Structure Number: 53 1144, Location: 07-LA-405-13.28-LA (Lat: 33.859189, Lng: -118.289133), Route carried "under" structure: City street L074, Year Built: 1962, Structure Length: 0. m, Average Daily Traffic: 20,000 (year 2019), Truck Traffic: 1%, Features Intersected: VERMONT AVE, 190TH ST, Facility Carried by Structure: INTERSTATE 405
Minimum Vertical Clearance: 5.00m (16.40ft), Kilometerpoint: 0.000, Lanes on structure: 10, Lanes under structure: 4, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 36.3m (119.1ft)
Find on map >> Show street view
Structure Number: 53 1144, Location: 07-LA-405-13.28-LA (Lat: 33.859189, Lng: -118.289133), Route carried "under" structure: City street L040, Year Built: 1962, Structure Length: 0. m, Average Daily Traffic: 30,000 (year 2019), Truck Traffic: 1%, Features Intersected: VERMONT AVE, 190TH ST, Facility Carried by Structure: INTERSTATE 405
Minimum Vertical Clearance: 4.87m (15.98ft), Kilometerpoint: 0.000, Lanes on structure: 10, Lanes under structure: 6, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 36.3m (119.1ft)
Structure Number: 53 1144, Location: 07-LA-405-13.28-LA (Lat: 33.859189, Lng: -118.289133), Route carried "under" structure: City street L040, Year Built: 1962, Structure Length: 0. m, Average Daily Traffic: 30,000 (year 2019), Truck Traffic: 1%, Features Intersected: VERMONT AVE, 190TH ST, Facility Carried by Structure: INTERSTATE 405
Minimum Vertical Clearance: 4.87m (15.98ft), Kilometerpoint: 0.000, Lanes on structure: 10, Lanes under structure: 6, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 36.3m (119.1ft)
Find on map >> Show street view
Structure Number: 53 1145L, Location: 07-LA-101-17.07L-LA (Lat: 34.159511, Lng: -118.467922), Route carried "under" structure: Ramp Interstate 405, Year Built: 1958, Structure Length: 0. m, Average Daily Traffic: 93,000 (year 2018), Truck Traffic: 4%, Features Intersected: N405-N101 CONNECTOR RAMP, Facility Carried by Structure: US HIGHWAY 101 SB
Minimum Vertical Clearance: 4.85m (15.91ft), Kilometerpoint: 39.420, Lanes on structure: 5, Lanes under structure: 2, Material/Design: Concrete continuous, Design/Construction: Slab, Length of Maximum Span: 12.2m (40.0ft)
Structure Number: 53 1145L, Location: 07-LA-101-17.07L-LA (Lat: 34.159511, Lng: -118.467922), Route carried "under" structure: Ramp Interstate 405, Year Built: 1958, Structure Length: 0. m, Average Daily Traffic: 93,000 (year 2018), Truck Traffic: 4%, Features Intersected: N405-N101 CONNECTOR RAMP, Facility Carried by Structure: US HIGHWAY 101 SB
Minimum Vertical Clearance: 4.85m (15.91ft), Kilometerpoint: 39.420, Lanes on structure: 5, Lanes under structure: 2, Material/Design: Concrete continuous, Design/Construction: Slab, Length of Maximum Span: 12.2m (40.0ft)
Find on map >> Show street view
Structure Number: 53 1146F, Location: 07-LA-101-17.14L-LA (Lat: 34.159725, Lng: -118.469236), Route carried "under" structure: Interstate 405, Year Built: 1958, Structure Length: 0. m, Average Daily Traffic: 229,000 (year 2018), Truck Traffic: 10%, Features Intersected: I 405 & N101-S405 RAMP
Minimum Vertical Clearance: 4.55m (14.93ft), Kilometerpoint: 39.420, Lanes on structure: 1, Lanes under structure: 8, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 28.0m (91.9ft)
Structure Number: 53 1146F, Location: 07-LA-101-17.14L-LA (Lat: 34.159725, Lng: -118.469236), Route carried "under" structure: Interstate 405, Year Built: 1958, Structure Length: 0. m, Average Daily Traffic: 229,000 (year 2018), Truck Traffic: 10%, Features Intersected: I 405 & N101-S405 RAMP
Minimum Vertical Clearance: 4.55m (14.93ft), Kilometerpoint: 39.420, Lanes on structure: 1, Lanes under structure: 8, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 28.0m (91.9ft)
Find on map >> Show street view
Structure Number: 53 1146F, Location: 07-LA-101-17.14L-LA (Lat: 34.159725, Lng: -118.469236), Route carried "under" structure: Ramp US 101, Year Built: 1958, Structure Length: 0. m, Average Daily Traffic: 17,701 (year 2011), Truck Traffic: 8%, Features Intersected: I 405 & N101-S405 RAMP
Minimum Vertical Clearance: 4.83m (15.85ft), Kilometerpoint: 17.140, Lanes on structure: 1, Lanes under structure: 1, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 28.0m (91.9ft)
Structure Number: 53 1146F, Location: 07-LA-101-17.14L-LA (Lat: 34.159725, Lng: -118.469236), Route carried "under" structure: Ramp US 101, Year Built: 1958, Structure Length: 0. m, Average Daily Traffic: 17,701 (year 2011), Truck Traffic: 8%, Features Intersected: I 405 & N101-S405 RAMP
Minimum Vertical Clearance: 4.83m (15.85ft), Kilometerpoint: 17.140, Lanes on structure: 1, Lanes under structure: 1, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 28.0m (91.9ft)
Find on map >> Show street view
Structure Number: 53 1146G, Location: 07-LA-101-17.14R-LA (Lat: 34.161078, Lng: -118.469300), Route carried "under" structure: Interstate 405, Year Built: 1958, Structure Length: 0. m, Average Daily Traffic: 219,000 (year 2018), Truck Traffic: 8%, Features Intersected: I 405 & N101-S405 RAMP
Minimum Vertical Clearance: 4.55m (14.93ft), Kilometerpoint: 39.510, Lanes on structure: 1, Lanes under structure: 8, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 28.0m (91.9ft)
Structure Number: 53 1146G, Location: 07-LA-101-17.14R-LA (Lat: 34.161078, Lng: -118.469300), Route carried "under" structure: Interstate 405, Year Built: 1958, Structure Length: 0. m, Average Daily Traffic: 219,000 (year 2018), Truck Traffic: 8%, Features Intersected: I 405 & N101-S405 RAMP
Minimum Vertical Clearance: 4.55m (14.93ft), Kilometerpoint: 39.510, Lanes on structure: 1, Lanes under structure: 8, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 28.0m (91.9ft)
Find on map >> Show street view
Structure Number: 53 1146G, Location: 07-LA-101-17.14R-LA (Lat: 34.161078, Lng: -118.469300), Route carried "under" structure: Ramp US 101, Year Built: 1958, Structure Length: 0. m, Average Daily Traffic: 17,701 (year 2011), Truck Traffic: 3%, Features Intersected: I 405 & N101-S405 RAMP
Minimum Vertical Clearance: 4.83m (15.85ft), Kilometerpoint: 17.140, Lanes on structure: 1, Lanes under structure: 1, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 28.0m (91.9ft)
Structure Number: 53 1146G, Location: 07-LA-101-17.14R-LA (Lat: 34.161078, Lng: -118.469300), Route carried "under" structure: Ramp US 101, Year Built: 1958, Structure Length: 0. m, Average Daily Traffic: 17,701 (year 2011), Truck Traffic: 3%, Features Intersected: I 405 & N101-S405 RAMP
Minimum Vertical Clearance: 4.83m (15.85ft), Kilometerpoint: 17.140, Lanes on structure: 1, Lanes under structure: 1, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 28.0m (91.9ft)
Find on map >> Show street view
Structure Number: 53 1146L, Location: 07-LA-101-17.14L-LA (Lat: 34.159981, Lng: -118.469264), Route carried "under" structure: Ramp US 101, Year Built: 1958, Structure Length: 0. m, Average Daily Traffic: 40,800 (year 2011), Truck Traffic: 5%, Features Intersected: I 405 & N101-S405 RAMP
Minimum Vertical Clearance: 4.83m (15.85ft), Kilometerpoint: 17.140, Lanes on structure: 5, Lanes under structure: 1, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 26.8m (87.9ft)
Structure Number: 53 1146L, Location: 07-LA-101-17.14L-LA (Lat: 34.159981, Lng: -118.469264), Route carried "under" structure: Ramp US 101, Year Built: 1958, Structure Length: 0. m, Average Daily Traffic: 40,800 (year 2011), Truck Traffic: 5%, Features Intersected: I 405 & N101-S405 RAMP
Minimum Vertical Clearance: 4.83m (15.85ft), Kilometerpoint: 17.140, Lanes on structure: 5, Lanes under structure: 1, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 26.8m (87.9ft)
Find on map >> Show street view
Structure Number: 53 1146L, Location: 07-LA-101-17.14L-LA (Lat: 34.159981, Lng: -118.469264), Route carried "under" structure: Interstate 405, Year Built: 1958, Structure Length: 0. m, Average Daily Traffic: 93,000 (year 2018), Truck Traffic: 10%, Features Intersected: I 405 & N101-S405 RAMP, Facility Carried by Structure: US HIGHWAY 101 SB
Minimum Vertical Clearance: 4.55m (14.93ft), Kilometerpoint: 39.430, Lanes on structure: 5, Lanes under structure: 8, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 26.8m (87.9ft)
Structure Number: 53 1146L, Location: 07-LA-101-17.14L-LA (Lat: 34.159981, Lng: -118.469264), Route carried "under" structure: Interstate 405, Year Built: 1958, Structure Length: 0. m, Average Daily Traffic: 93,000 (year 2018), Truck Traffic: 10%, Features Intersected: I 405 & N101-S405 RAMP, Facility Carried by Structure: US HIGHWAY 101 SB
Minimum Vertical Clearance: 4.55m (14.93ft), Kilometerpoint: 39.430, Lanes on structure: 5, Lanes under structure: 8, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 26.8m (87.9ft)
Find on map >> Show street view
Structure Number: 53 1146R, Location: 07-LA-101-17.14R-LA (Lat: 34.160939, Lng: -118.469297), Route carried "under" structure: Interstate 405, Year Built: 1958, Structure Length: 0. m, Average Daily Traffic: 175,000 (year 2018), Truck Traffic: 10%, Features Intersected: I 405 & N101-S405 RAMP, Facility Carried by Structure: US HIGHWAY 101 NB
Minimum Vertical Clearance: 4.55m (14.93ft), Kilometerpoint: 39.500, Lanes on structure: 6, Lanes under structure: 6, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 27.4m (89.9ft)
Structure Number: 53 1146R, Location: 07-LA-101-17.14R-LA (Lat: 34.160939, Lng: -118.469297), Route carried "under" structure: Interstate 405, Year Built: 1958, Structure Length: 0. m, Average Daily Traffic: 175,000 (year 2018), Truck Traffic: 10%, Features Intersected: I 405 & N101-S405 RAMP, Facility Carried by Structure: US HIGHWAY 101 NB
Minimum Vertical Clearance: 4.55m (14.93ft), Kilometerpoint: 39.500, Lanes on structure: 6, Lanes under structure: 6, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 27.4m (89.9ft)
Find on map >> Show street view
Structure Number: 53 1146R, Location: 07-LA-101-17.14R-LA (Lat: 34.160939, Lng: -118.469297), Route carried "under" structure: Ramp US 101, Year Built: 1958, Structure Length: 0. m, Average Daily Traffic: 40,800 (year 2011), Truck Traffic: 8%, Features Intersected: I 405 & N101-S405 RAMP
Minimum Vertical Clearance: 4.83m (15.85ft), Kilometerpoint: 17.140, Lanes on structure: 6, Lanes under structure: 1, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 27.4m (89.9ft)
Structure Number: 53 1146R, Location: 07-LA-101-17.14R-LA (Lat: 34.160939, Lng: -118.469297), Route carried "under" structure: Ramp US 101, Year Built: 1958, Structure Length: 0. m, Average Daily Traffic: 40,800 (year 2011), Truck Traffic: 8%, Features Intersected: I 405 & N101-S405 RAMP
Minimum Vertical Clearance: 4.83m (15.85ft), Kilometerpoint: 17.140, Lanes on structure: 6, Lanes under structure: 1, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 27.4m (89.9ft)
Find on map >> Show street view
Structure Number: 53 1147R, Location: 07-LA-101-17.29R-LA (Lat: 34.162139, Lng: -118.470731), Route carried "under" structure: Ramp Interstate 405, Year Built: 1958, Structure Length: 0. m, Average Daily Traffic: 93,000 (year 2018), Truck Traffic: 4%, Features Intersected: S405-S101 CONNECTOR RAMP, Facility Carried by Structure: US HIGHWAY 101 NB
Minimum Vertical Clearance: 4.57m (14.99ft), Kilometerpoint: 39.560, Lanes on structure: 6, Lanes under structure: 2, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 23.8m (78.1ft)
Structure Number: 53 1147R, Location: 07-LA-101-17.29R-LA (Lat: 34.162139, Lng: -118.470731), Route carried "under" structure: Ramp Interstate 405, Year Built: 1958, Structure Length: 0. m, Average Daily Traffic: 93,000 (year 2018), Truck Traffic: 4%, Features Intersected: S405-S101 CONNECTOR RAMP, Facility Carried by Structure: US HIGHWAY 101 NB
Minimum Vertical Clearance: 4.57m (14.99ft), Kilometerpoint: 39.560, Lanes on structure: 6, Lanes under structure: 2, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 23.8m (78.1ft)
Find on map >> Show street view
Structure Number: 53 115, Location: 07-LA-710-23.77-LA (Lat: 34.023467, Lng: -118.172400), Route carried "under" structure: City street , Year Built: 1960, Structure Length: 0. m, Average Daily Traffic: 17,500 (year 2009), Truck Traffic: 10%, Features Intersected: WHITTIER BLVD, Facility Carried by Structure: ROUTE 710
Minimum Vertical Clearance: 4.44m (14.57ft), Kilometerpoint: 0.000, Lanes on structure: 9, Lanes under structure: 4, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 25.0m (82.0ft)
Structure Number: 53 115, Location: 07-LA-710-23.77-LA (Lat: 34.023467, Lng: -118.172400), Route carried "under" structure: City street , Year Built: 1960, Structure Length: 0. m, Average Daily Traffic: 17,500 (year 2009), Truck Traffic: 10%, Features Intersected: WHITTIER BLVD, Facility Carried by Structure: ROUTE 710
Minimum Vertical Clearance: 4.44m (14.57ft), Kilometerpoint: 0.000, Lanes on structure: 9, Lanes under structure: 4, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 25.0m (82.0ft)
Find on map >> Show street view
Structure Number: 53 1151, Location: 07-LA-710-24.22-LA (Lat: 34.030392, Lng: -118.171811), Route carried "under" structure: Interstate 710, Year Built: 1960, Structure Length: 0. m, Average Daily Traffic: 192,000 (year 2017), Truck Traffic: 7%, Features Intersected: INTERSTATE 710 & CONNS, Facility Carried by Structure: HUMPHREYS AVE
Minimum Vertical Clearance: 5.13m (16.83ft), Kilometerpoint: 24.220, Lanes on structure: 2, Lanes under structure: 7, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 33.5m (109.9ft)
Structure Number: 53 1151, Location: 07-LA-710-24.22-LA (Lat: 34.030392, Lng: -118.171811), Route carried "under" structure: Interstate 710, Year Built: 1960, Structure Length: 0. m, Average Daily Traffic: 192,000 (year 2017), Truck Traffic: 7%, Features Intersected: INTERSTATE 710 & CONNS, Facility Carried by Structure: HUMPHREYS AVE
Minimum Vertical Clearance: 5.13m (16.83ft), Kilometerpoint: 24.220, Lanes on structure: 2, Lanes under structure: 7, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 33.5m (109.9ft)
Find on map >> Show street view
Structure Number: 53 1151, Location: 07-LA-710-24.22-LA (Lat: 34.030392, Lng: -118.171811), Route carried "under" structure: Ramp Interstate 60, Year Built: 1960, Structure Length: 0. m, Average Daily Traffic: 20,000 (year 2010), Truck Traffic: 6%, Features Intersected: INTERSTATE 710 & CONNS, Facility Carried by Structure: HUMPHREYS AVE
Minimum Vertical Clearance: 5.91m (19.39ft), Kilometerpoint: 3.230, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 33.5m (109.9ft)
Structure Number: 53 1151, Location: 07-LA-710-24.22-LA (Lat: 34.030392, Lng: -118.171811), Route carried "under" structure: Ramp Interstate 60, Year Built: 1960, Structure Length: 0. m, Average Daily Traffic: 20,000 (year 2010), Truck Traffic: 6%, Features Intersected: INTERSTATE 710 & CONNS, Facility Carried by Structure: HUMPHREYS AVE
Minimum Vertical Clearance: 5.91m (19.39ft), Kilometerpoint: 3.230, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 33.5m (109.9ft)
Find on map >> Show street view
Structure Number: 53 1151, Location: 07-LA-710-24.22-LA (Lat: 34.030392, Lng: -118.171811), Route carried "under" structure: Ramp Interstate 710, Year Built: 1960, Structure Length: 0. m, Average Daily Traffic: 20,000 (year 2010), Truck Traffic: 6%, Features Intersected: INTERSTATE 710 & CONNS, Facility Carried by Structure: HUMPHREYS AVE
Minimum Vertical Clearance: 4.62m (15.16ft), Kilometerpoint: 24.220, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 33.5m (109.9ft)
Structure Number: 53 1151, Location: 07-LA-710-24.22-LA (Lat: 34.030392, Lng: -118.171811), Route carried "under" structure: Ramp Interstate 710, Year Built: 1960, Structure Length: 0. m, Average Daily Traffic: 20,000 (year 2010), Truck Traffic: 6%, Features Intersected: INTERSTATE 710 & CONNS, Facility Carried by Structure: HUMPHREYS AVE
Minimum Vertical Clearance: 4.62m (15.16ft), Kilometerpoint: 24.220, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 33.5m (109.9ft)
Find on map >> Show street view
Structure Number: 53 1152, Location: 07-LA-710-24.47-LA (Lat: 34.033167, Lng: -118.170450), Route carried "under" structure: Ramp Interstate 710, Year Built: 1960, Structure Length: 0. m, Average Daily Traffic: 15,000 (year 2010), Truck Traffic: 2%, Features Intersected: INTERSTATE 710, Facility Carried by Structure: THIRD STREET
Minimum Vertical Clearance: 7.62m (25.00ft), Kilometerpoint: 24.470, Lanes on structure: 6, Lanes under structure: 1, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 25.6m (84.0ft)
Structure Number: 53 1152, Location: 07-LA-710-24.47-LA (Lat: 34.033167, Lng: -118.170450), Route carried "under" structure: Ramp Interstate 710, Year Built: 1960, Structure Length: 0. m, Average Daily Traffic: 15,000 (year 2010), Truck Traffic: 2%, Features Intersected: INTERSTATE 710, Facility Carried by Structure: THIRD STREET
Minimum Vertical Clearance: 7.62m (25.00ft), Kilometerpoint: 24.470, Lanes on structure: 6, Lanes under structure: 1, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 25.6m (84.0ft)
Find on map >> Show street view
Structure Number: 53 1152, Location: 07-LA-710-24.47-LA (Lat: 34.033167, Lng: -118.170450), Route carried "under" structure: Ramp City street , Year Built: 1960, Structure Length: 0. m, Average Daily Traffic: 5,000 (year 2010), Truck Traffic: 2%, Features Intersected: INTERSTATE 710, Facility Carried by Structure: THIRD STREET
Minimum Vertical Clearance: 5.08m (16.67ft), Kilometerpoint: 24.470, Lanes on structure: 6, Lanes under structure: 1, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 25.6m (84.0ft)
Structure Number: 53 1152, Location: 07-LA-710-24.47-LA (Lat: 34.033167, Lng: -118.170450), Route carried "under" structure: Ramp City street , Year Built: 1960, Structure Length: 0. m, Average Daily Traffic: 5,000 (year 2010), Truck Traffic: 2%, Features Intersected: INTERSTATE 710, Facility Carried by Structure: THIRD STREET
Minimum Vertical Clearance: 5.08m (16.67ft), Kilometerpoint: 24.470, Lanes on structure: 6, Lanes under structure: 1, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 25.6m (84.0ft)
Find on map >> Show street view
Structure Number: 53 1152, Location: 07-LA-710-24.47-LA (Lat: 34.033167, Lng: -118.170450), Route carried "under" structure: Interstate 710, Year Built: 1960, Structure Length: 0. m, Average Daily Traffic: 192,000 (year 2017), Truck Traffic: 7%, Features Intersected: INTERSTATE 710, Facility Carried by Structure: THIRD STREET
Minimum Vertical Clearance: 5.23m (17.16ft), Kilometerpoint: 24.470, Lanes on structure: 6, Lanes under structure: 6, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 25.6m (84.0ft)
Structure Number: 53 1152, Location: 07-LA-710-24.47-LA (Lat: 34.033167, Lng: -118.170450), Route carried "under" structure: Interstate 710, Year Built: 1960, Structure Length: 0. m, Average Daily Traffic: 192,000 (year 2017), Truck Traffic: 7%, Features Intersected: INTERSTATE 710, Facility Carried by Structure: THIRD STREET
Minimum Vertical Clearance: 5.23m (17.16ft), Kilometerpoint: 24.470, Lanes on structure: 6, Lanes under structure: 6, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 25.6m (84.0ft)
Find on map >> Show street view
Structure Number: 53 1153, Location: 07-LA-710-24.72-LA (Lat: 34.036869, Lng: -118.170306), Route carried "under" structure: Interstate 710, Year Built: 1960, Structure Length: 0. m, Average Daily Traffic: 127,000 (year 2009), Truck Traffic: 5%, Features Intersected: INTERSTATE 710, Facility Carried by Structure: FIRST ST
Minimum Vertical Clearance: 4.72m (15.49ft), Kilometerpoint: 24.720, Lanes on structure: 4, Lanes under structure: 8, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 21.3m (69.9ft)
Structure Number: 53 1153, Location: 07-LA-710-24.72-LA (Lat: 34.036869, Lng: -118.170306), Route carried "under" structure: Interstate 710, Year Built: 1960, Structure Length: 0. m, Average Daily Traffic: 127,000 (year 2009), Truck Traffic: 5%, Features Intersected: INTERSTATE 710, Facility Carried by Structure: FIRST ST
Minimum Vertical Clearance: 4.72m (15.49ft), Kilometerpoint: 24.720, Lanes on structure: 4, Lanes under structure: 8, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 21.3m (69.9ft)
Find on map >> Show street view
Structure Number: 53 1154, Location: 07-LA-710-24.97-LA (Lat: 34.040478, Lng: -118.170336), Route carried "under" structure: Interstate 710, Year Built: 1960, Structure Length: 0. m, Average Daily Traffic: 127,000 (year 2009), Truck Traffic: 5%, Features Intersected: INTERSTATE 710, Facility Carried by Structure: CESAR E. CHAVEZ AV
Minimum Vertical Clearance: 4.64m (15.22ft), Kilometerpoint: 24.970, Lanes on structure: 5, Lanes under structure: 8, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 21.3m (69.9ft)
Structure Number: 53 1154, Location: 07-LA-710-24.97-LA (Lat: 34.040478, Lng: -118.170336), Route carried "under" structure: Interstate 710, Year Built: 1960, Structure Length: 0. m, Average Daily Traffic: 127,000 (year 2009), Truck Traffic: 5%, Features Intersected: INTERSTATE 710, Facility Carried by Structure: CESAR E. CHAVEZ AV
Minimum Vertical Clearance: 4.64m (15.22ft), Kilometerpoint: 24.970, Lanes on structure: 5, Lanes under structure: 8, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 21.3m (69.9ft)
Find on map >> Show street view
Structure Number: 53 1155, Location: 07-LA-710-25.21-LA (Lat: 34.044117, Lng: -118.169767), Route carried "under" structure: City street L714, Year Built: 1960, Structure Length: 0. m, Average Daily Traffic: 20,500 (year 2010), Truck Traffic: 10%, Features Intersected: FLORAL DRIVE, Facility Carried by Structure: ROUTE 710 NB
Minimum Vertical Clearance: 4.57m (14.99ft), Kilometerpoint: 0.000, Lanes on structure: 5, Lanes under structure: 2, Material/Design: Concrete, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 18.6m (61.0ft)
Structure Number: 53 1155, Location: 07-LA-710-25.21-LA (Lat: 34.044117, Lng: -118.169767), Route carried "under" structure: City street L714, Year Built: 1960, Structure Length: 0. m, Average Daily Traffic: 20,500 (year 2010), Truck Traffic: 10%, Features Intersected: FLORAL DRIVE, Facility Carried by Structure: ROUTE 710 NB
Minimum Vertical Clearance: 4.57m (14.99ft), Kilometerpoint: 0.000, Lanes on structure: 5, Lanes under structure: 2, Material/Design: Concrete, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 18.6m (61.0ft)
Find on map >> Show street view
Structure Number: 53 1162, Location: 07-LA-101-26.68-LA (Lat: 34.162981, Lng: -118.626658), Route carried "under" structure: US 101, Year Built: 1957, Structure Length: 0. m, Average Daily Traffic: 180,000 (year 2011), Truck Traffic: 10%, Features Intersected: U.S. HIGHWAY 101, Facility Carried by Structure: PEDESTRIAN WALKWAY
Minimum Vertical Clearance: 5.11m (16.77ft), Kilometerpoint: 26.680, Lanes under structure: 10, Material/Design: Prestressed concrete continuous, Design/Construction: Slab, Length of Maximum Span: 17.7m (58.1ft)
Structure Number: 53 1162, Location: 07-LA-101-26.68-LA (Lat: 34.162981, Lng: -118.626658), Route carried "under" structure: US 101, Year Built: 1957, Structure Length: 0. m, Average Daily Traffic: 180,000 (year 2011), Truck Traffic: 10%, Features Intersected: U.S. HIGHWAY 101, Facility Carried by Structure: PEDESTRIAN WALKWAY
Minimum Vertical Clearance: 5.11m (16.77ft), Kilometerpoint: 26.680, Lanes under structure: 10, Material/Design: Prestressed concrete continuous, Design/Construction: Slab, Length of Maximum Span: 17.7m (58.1ft)
Find on map >> Show street view
Structure Number: 53 1172, Location: 07-LA-405-14.40-LA (Lat: 33.860044, Lng: -118.308886), Route carried "under" structure: City street L005, Year Built: 1962, Structure Length: 0. m, Average Daily Traffic: 15,000 (year 2015), Truck Traffic: 2%, Features Intersected: WESTERN AVENUE, Facility Carried by Structure: INTERSTATE 405
Minimum Vertical Clearance: 4.72m (15.49ft), Kilometerpoint: 0.000, Lanes on structure: 12, Lanes under structure: 6, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 31.1m (102.0ft)
Structure Number: 53 1172, Location: 07-LA-405-14.40-LA (Lat: 33.860044, Lng: -118.308886), Route carried "under" structure: City street L005, Year Built: 1962, Structure Length: 0. m, Average Daily Traffic: 15,000 (year 2015), Truck Traffic: 2%, Features Intersected: WESTERN AVENUE, Facility Carried by Structure: INTERSTATE 405
Minimum Vertical Clearance: 4.72m (15.49ft), Kilometerpoint: 0.000, Lanes on structure: 12, Lanes under structure: 6, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 31.1m (102.0ft)
Find on map >> Show street view
Structure Number: 53 1173, Location: 07-LA-005-26.47-LA (Lat: 34.150022, Lng: -118.281256), Route carried "under" structure: Ramp Interstate 5, Year Built: 1967, Structure Length: 0. m, Average Daily Traffic: 5,000 (year 1998), Truck Traffic: 2%, Features Intersected: I 5, Facility Carried by Structure: ZOO DRIVE
Minimum Vertical Clearance: 4.67m (15.32ft), Kilometerpoint: 26.470, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 29.1m (95.5ft)
Structure Number: 53 1173, Location: 07-LA-005-26.47-LA (Lat: 34.150022, Lng: -118.281256), Route carried "under" structure: Ramp Interstate 5, Year Built: 1967, Structure Length: 0. m, Average Daily Traffic: 5,000 (year 1998), Truck Traffic: 2%, Features Intersected: I 5, Facility Carried by Structure: ZOO DRIVE
Minimum Vertical Clearance: 4.67m (15.32ft), Kilometerpoint: 26.470, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 29.1m (95.5ft)
Find on map >> Show street view
Structure Number: 53 1173, Location: 07-LA-005-26.47-LA (Lat: 34.150022, Lng: -118.281256), Route carried "under" structure: Interstate 5, Year Built: 1967, Structure Length: 0. m, Average Daily Traffic: 263,000 (year 2009), Truck Traffic: 7%, Features Intersected: I 5, Facility Carried by Structure: ZOO DRIVE
Minimum Vertical Clearance: 4.67m (15.32ft), Kilometerpoint: 26.470, Lanes on structure: 2, Lanes under structure: 11, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 29.1m (95.5ft)
Structure Number: 53 1173, Location: 07-LA-005-26.47-LA (Lat: 34.150022, Lng: -118.281256), Route carried "under" structure: Interstate 5, Year Built: 1967, Structure Length: 0. m, Average Daily Traffic: 263,000 (year 2009), Truck Traffic: 7%, Features Intersected: I 5, Facility Carried by Structure: ZOO DRIVE
Minimum Vertical Clearance: 4.67m (15.32ft), Kilometerpoint: 26.470, Lanes on structure: 2, Lanes under structure: 11, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 29.1m (95.5ft)
Find on map >> Show street view
Structure Number: 53 1173, Location: 07-LA-005-26.47-LA (Lat: 34.150022, Lng: -118.281256), Route carried "under" structure: Ramp US 5, Year Built: 1967, Structure Length: 0. m, Average Daily Traffic: 2,500 (year 1998), Truck Traffic: 1%, Features Intersected: I 5, Facility Carried by Structure: ZOO DRIVE
Minimum Vertical Clearance: 4.74m (15.55ft), Kilometerpoint: 26.470, Lanes on structure: 2, Lanes under structure: 1, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 29.1m (95.5ft)
Structure Number: 53 1173, Location: 07-LA-005-26.47-LA (Lat: 34.150022, Lng: -118.281256), Route carried "under" structure: Ramp US 5, Year Built: 1967, Structure Length: 0. m, Average Daily Traffic: 2,500 (year 1998), Truck Traffic: 1%, Features Intersected: I 5, Facility Carried by Structure: ZOO DRIVE
Minimum Vertical Clearance: 4.74m (15.55ft), Kilometerpoint: 26.470, Lanes on structure: 2, Lanes under structure: 1, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 29.1m (95.5ft)
Find on map >> Show street view
Structure Number: 53 1178, Location: 07-LA-405-42.36-LA (Lat: 34.200950, Lng: -118.473292), Route carried "under" structure: City street L547, Year Built: 1963, Structure Length: 0. m, Average Daily Traffic: 25,000 (year 2011), Truck Traffic: 10%, Features Intersected: SHERMAN WAY, Facility Carried by Structure: INTERSTATE 405
Minimum Vertical Clearance: 4.65m (15.26ft), Kilometerpoint: 0.000, Lanes on structure: 10, Lanes under structure: 6, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 17.7m (58.1ft)
Structure Number: 53 1178, Location: 07-LA-405-42.36-LA (Lat: 34.200950, Lng: -118.473292), Route carried "under" structure: City street L547, Year Built: 1963, Structure Length: 0. m, Average Daily Traffic: 25,000 (year 2011), Truck Traffic: 10%, Features Intersected: SHERMAN WAY, Facility Carried by Structure: INTERSTATE 405
Minimum Vertical Clearance: 4.65m (15.26ft), Kilometerpoint: 0.000, Lanes on structure: 10, Lanes under structure: 6, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 17.7m (58.1ft)
Find on map >> Show street view
Structure Number: 53 1179, Location: 07-LA-405-13.83-LA (Lat: 33.860122, Lng: -118.298925), Route carried "under" structure: City street L018, Year Built: 1962, Structure Length: 0. m, Average Daily Traffic: 1,000 (year 2015), Truck Traffic: 1%, Features Intersected: NORMANDIE AVE & RR, Facility Carried by Structure: INTERSTATE 405
Minimum Vertical Clearance: 7.28m (23.88ft), Kilometerpoint: 0.000, Lanes on structure: 11, Lanes under structure: 4, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 27.4m (89.9ft)
Structure Number: 53 1179, Location: 07-LA-405-13.83-LA (Lat: 33.860122, Lng: -118.298925), Route carried "under" structure: City street L018, Year Built: 1962, Structure Length: 0. m, Average Daily Traffic: 1,000 (year 2015), Truck Traffic: 1%, Features Intersected: NORMANDIE AVE & RR, Facility Carried by Structure: INTERSTATE 405
Minimum Vertical Clearance: 7.28m (23.88ft), Kilometerpoint: 0.000, Lanes on structure: 11, Lanes under structure: 4, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 27.4m (89.9ft)
Find on map >> Show street view
Structure Number: 53 1180K, Location: 07-LA-005-24.60-LA (Lat: 34.123811, Lng: -118.272836), Route carried "under" structure: Bypass Interstate 5, Year Built: 1957, Structure Length: 0. m, Average Daily Traffic: 22,000 (year 2008), Truck Traffic: 2%, Features Intersected: S5-LOS FELIZ BL OFF RAMP, Facility Carried by Structure: GRIFFITH PARK DR-S
Minimum Vertical Clearance: 4.72m (15.49ft), Kilometerpoint: 24.600, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 25.9m (85.0ft)
Structure Number: 53 1180K, Location: 07-LA-005-24.60-LA (Lat: 34.123811, Lng: -118.272836), Route carried "under" structure: Bypass Interstate 5, Year Built: 1957, Structure Length: 0. m, Average Daily Traffic: 22,000 (year 2008), Truck Traffic: 2%, Features Intersected: S5-LOS FELIZ BL OFF RAMP, Facility Carried by Structure: GRIFFITH PARK DR-S
Minimum Vertical Clearance: 4.72m (15.49ft), Kilometerpoint: 24.600, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 25.9m (85.0ft)
Find on map >> Show street view
Structure Number: 53 1181S, Location: 07-LA-005-24.61-LA (Lat: 34.123994, Lng: -118.272183), Route carried "under" structure: Interstate 5, Year Built: 1957, Structure Length: 0. m, Average Daily Traffic: 264,292 (year 2010), Truck Traffic: 7%, Features Intersected: ROUTE 5 & S5-LOS FELIZ B
Minimum Vertical Clearance: 4.62m (15.16ft), Kilometerpoint: 24.610, Lanes on structure: 2, Lanes under structure: 10, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 37.2m (122.0ft)
Structure Number: 53 1181S, Location: 07-LA-005-24.61-LA (Lat: 34.123994, Lng: -118.272183), Route carried "under" structure: Interstate 5, Year Built: 1957, Structure Length: 0. m, Average Daily Traffic: 264,292 (year 2010), Truck Traffic: 7%, Features Intersected: ROUTE 5 & S5-LOS FELIZ B
Minimum Vertical Clearance: 4.62m (15.16ft), Kilometerpoint: 24.610, Lanes on structure: 2, Lanes under structure: 10, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 37.2m (122.0ft)
Find on map >> Show street view
Structure Number: 53 1183, Location: 07-LA-005-23.97-LA (Lat: 34.115558, Lng: -118.268831), Route carried "under" structure: Interstate 5, Year Built: 1957, Structure Length: 0. m, Average Daily Traffic: 263,000 (year 2009), Truck Traffic: 7%, Features Intersected: INTERSTATE 5, Facility Carried by Structure: PEDESTRIAN WALKWAY
Minimum Vertical Clearance: 4.72m (15.49ft), Kilometerpoint: 23.970, Lanes under structure: 10, Material/Design: Prestressed concrete, Design/Construction: Slab, Length of Maximum Span: 24.4m (80.1ft)
Structure Number: 53 1183, Location: 07-LA-005-23.97-LA (Lat: 34.115558, Lng: -118.268831), Route carried "under" structure: Interstate 5, Year Built: 1957, Structure Length: 0. m, Average Daily Traffic: 263,000 (year 2009), Truck Traffic: 7%, Features Intersected: INTERSTATE 5, Facility Carried by Structure: PEDESTRIAN WALKWAY
Minimum Vertical Clearance: 4.72m (15.49ft), Kilometerpoint: 23.970, Lanes under structure: 10, Material/Design: Prestressed concrete, Design/Construction: Slab, Length of Maximum Span: 24.4m (80.1ft)
Find on map >> Show street view
Structure Number: 53 1184, Location: 07-LA-110-13.77-LA (Lat: 33.927861, Lng: -118.281606), Route carried "under" structure: Interstate 110, Year Built: 1986, Structure Length: 0. m, Average Daily Traffic: 260,000 (year 2009), Truck Traffic: 7%, Features Intersected: INTERSTATE 110, Facility Carried by Structure: SP/UP RR
Minimum Vertical Clearance: 5.82m (19.09ft), Kilometerpoint: 13.770, Lanes under structure: 13, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 39.6m (129.9ft)
Structure Number: 53 1184, Location: 07-LA-110-13.77-LA (Lat: 33.927861, Lng: -118.281606), Route carried "under" structure: Interstate 110, Year Built: 1986, Structure Length: 0. m, Average Daily Traffic: 260,000 (year 2009), Truck Traffic: 7%, Features Intersected: INTERSTATE 110, Facility Carried by Structure: SP/UP RR
Minimum Vertical Clearance: 5.82m (19.09ft), Kilometerpoint: 13.770, Lanes under structure: 13, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 39.6m (129.9ft)
Find on map >> Show street view
Structure Number: 53 1216, Location: 07-LA-005-33.28-LA (Lat: 34.221275, Lng: -118.359781), Route carried "under" structure: Interstate 5, Year Built: 1960, Structure Length: 0. m, Average Daily Traffic: 187,358 (year 2011), Truck Traffic: 9%, Features Intersected: ROUTE 5, Facility Carried by Structure: ROSCOE BLVD
Minimum Vertical Clearance: 4.57m (14.99ft), Kilometerpoint: 33.280, Lanes on structure: 2, Lanes under structure: 8, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 21.8m (71.5ft)
Structure Number: 53 1216, Location: 07-LA-005-33.28-LA (Lat: 34.221275, Lng: -118.359781), Route carried "under" structure: Interstate 5, Year Built: 1960, Structure Length: 0. m, Average Daily Traffic: 187,358 (year 2011), Truck Traffic: 9%, Features Intersected: ROUTE 5, Facility Carried by Structure: ROSCOE BLVD
Minimum Vertical Clearance: 4.57m (14.99ft), Kilometerpoint: 33.280, Lanes on structure: 2, Lanes under structure: 8, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 21.8m (71.5ft)
Find on map >> Show street view
Structure Number: 53 1217S, Location: 07-LA-005-34.72-LA (Lat: 34.226956, Lng: -118.382936), Route carried "under" structure: Ramp Interstate 5, Year Built: 1961, Structure Length: 0. m, Average Daily Traffic: 5,935 (year 2011), Truck Traffic: 8%, Features Intersected: TUXFORD RAMP SEPARATION
Minimum Vertical Clearance: 4.70m (15.42ft), Kilometerpoint: 34.700, Lanes on structure: 2, Lanes under structure: 1, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 25.4m (83.3ft)
Structure Number: 53 1217S, Location: 07-LA-005-34.72-LA (Lat: 34.226956, Lng: -118.382936), Route carried "under" structure: Ramp Interstate 5, Year Built: 1961, Structure Length: 0. m, Average Daily Traffic: 5,935 (year 2011), Truck Traffic: 8%, Features Intersected: TUXFORD RAMP SEPARATION
Minimum Vertical Clearance: 4.70m (15.42ft), Kilometerpoint: 34.700, Lanes on structure: 2, Lanes under structure: 1, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 25.4m (83.3ft)
Find on map >> Show street view
Structure Number: 53 1218S, Location: 07-LA-005-34.82-LA (Lat: 34.226211, Lng: -118.384692), Route carried "under" structure: Interstate 5, Year Built: 1961, Structure Length: 0. m, Average Daily Traffic: 187,358 (year 2011), Truck Traffic: 9%, Features Intersected: INTERSTATE 5
Minimum Vertical Clearance: 4.57m (14.99ft), Kilometerpoint: 34.820, Lanes on structure: 1, Lanes under structure: 9, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 28.4m (93.2ft)
Structure Number: 53 1218S, Location: 07-LA-005-34.82-LA (Lat: 34.226211, Lng: -118.384692), Route carried "under" structure: Interstate 5, Year Built: 1961, Structure Length: 0. m, Average Daily Traffic: 187,358 (year 2011), Truck Traffic: 9%, Features Intersected: INTERSTATE 5
Minimum Vertical Clearance: 4.57m (14.99ft), Kilometerpoint: 34.820, Lanes on structure: 1, Lanes under structure: 9, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 28.4m (93.2ft)
Find on map >> Show street view
Structure Number: 53 1219, Location: 07-LA-005-35.94-LA (Lat: 34.231167, Lng: -118.402653), Route carried "under" structure: Interstate 5, Year Built: 1963, Structure Length: 0. m, Average Daily Traffic: 187,358 (year 2011), Truck Traffic: 9%, Features Intersected: ROUTE 5, Facility Carried by Structure: LAUREL CYN BLVD
Minimum Vertical Clearance: 4.52m (14.83ft), Kilometerpoint: 35.940, Lanes on structure: 5, Lanes under structure: 10, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 36.7m (120.4ft)
Structure Number: 53 1219, Location: 07-LA-005-35.94-LA (Lat: 34.231167, Lng: -118.402653), Route carried "under" structure: Interstate 5, Year Built: 1963, Structure Length: 0. m, Average Daily Traffic: 187,358 (year 2011), Truck Traffic: 9%, Features Intersected: ROUTE 5, Facility Carried by Structure: LAUREL CYN BLVD
Minimum Vertical Clearance: 4.52m (14.83ft), Kilometerpoint: 35.940, Lanes on structure: 5, Lanes under structure: 10, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 36.7m (120.4ft)
Find on map >> Show street view
Structure Number: 53 1222K, Location: 07-LA-005-36.34-LA (Lat: 34.232639, Lng: -118.410303), Route carried "under" structure: Ramp Interstate 5, Year Built: 1963, Structure Length: 0. m, Average Daily Traffic: 32,163 (year 2011), Truck Traffic: 12%, Features Intersected: S5-S170 CONNECTOR RAMP
Minimum Vertical Clearance: 4.80m (15.75ft), Kilometerpoint: 36.340, Lanes on structure: 2, Lanes under structure: 3, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 42.7m (140.1ft)
Structure Number: 53 1222K, Location: 07-LA-005-36.34-LA (Lat: 34.232639, Lng: -118.410303), Route carried "under" structure: Ramp Interstate 5, Year Built: 1963, Structure Length: 0. m, Average Daily Traffic: 32,163 (year 2011), Truck Traffic: 12%, Features Intersected: S5-S170 CONNECTOR RAMP
Minimum Vertical Clearance: 4.80m (15.75ft), Kilometerpoint: 36.340, Lanes on structure: 2, Lanes under structure: 3, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 42.7m (140.1ft)
Find on map >> Show street view
Structure Number: 53 1225, Location: 07-LA-101-11.11-LA (Lat: 34.146975, Lng: -118.370117), Route carried "under" structure: City street L424, Year Built: 1957, Structure Length: 0. m, Average Daily Traffic: 15,500 (year 2021), Truck Traffic: 1%, Features Intersected: VINELAND AVE, Facility Carried by Structure: U.S. HIGHWAY 101
Minimum Vertical Clearance: 4.70m (15.42ft), Kilometerpoint: 0.000, Lanes on structure: 11, Lanes under structure: 6, Material/Design: Concrete continuous, Design/Construction: Tee Beam, Length of Maximum Span: 24.4m (80.1ft)
Structure Number: 53 1225, Location: 07-LA-101-11.11-LA (Lat: 34.146975, Lng: -118.370117), Route carried "under" structure: City street L424, Year Built: 1957, Structure Length: 0. m, Average Daily Traffic: 15,500 (year 2021), Truck Traffic: 1%, Features Intersected: VINELAND AVE, Facility Carried by Structure: U.S. HIGHWAY 101
Minimum Vertical Clearance: 4.70m (15.42ft), Kilometerpoint: 0.000, Lanes on structure: 11, Lanes under structure: 6, Material/Design: Concrete continuous, Design/Construction: Tee Beam, Length of Maximum Span: 24.4m (80.1ft)
Find on map >> Show street view
Structure Number: 53 1226, Location: 07-LA-101-11.45-LA (Lat: 34.150253, Lng: -118.373858), Route carried "under" structure: City street L428, Year Built: 1957, Structure Length: 0. m, Average Daily Traffic: 19,201 (year 2021), Truck Traffic: 2%, Features Intersected: MOORPARK STREET, Facility Carried by Structure: U.S. HIGHWAY 101
Minimum Vertical Clearance: 4.62m (15.16ft), Kilometerpoint: 0.000, Lanes on structure: 10, Lanes under structure: 5, Material/Design: Concrete, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 32.0m (105.0ft)
Structure Number: 53 1226, Location: 07-LA-101-11.45-LA (Lat: 34.150253, Lng: -118.373858), Route carried "under" structure: City street L428, Year Built: 1957, Structure Length: 0. m, Average Daily Traffic: 19,201 (year 2021), Truck Traffic: 2%, Features Intersected: MOORPARK STREET, Facility Carried by Structure: U.S. HIGHWAY 101
Minimum Vertical Clearance: 4.62m (15.16ft), Kilometerpoint: 0.000, Lanes on structure: 10, Lanes under structure: 5, Material/Design: Concrete, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 32.0m (105.0ft)
Find on map >> Show street view
Structure Number: 53 1239H, Location: 07-LA-105-R2.05-LA (Lat: 33.916644, Lng: -118.370742), Route carried "under" structure: City street L080, Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 32,700 (year 2006), Truck Traffic: 2%, Features Intersected: EL SEGUNDO BLVD, Facility Carried by Structure: E&W105-S405 CONN
Minimum Vertical Clearance: 8.23m (27.00ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 6, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 54.9m (180.1ft)
Structure Number: 53 1239H, Location: 07-LA-105-R2.05-LA (Lat: 33.916644, Lng: -118.370742), Route carried "under" structure: City street L080, Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 32,700 (year 2006), Truck Traffic: 2%, Features Intersected: EL SEGUNDO BLVD, Facility Carried by Structure: E&W105-S405 CONN
Minimum Vertical Clearance: 8.23m (27.00ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 6, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 54.9m (180.1ft)
Find on map >> Show street view
Structure Number: 53 1241, Location: 07-LA-405-R21.22-LA (Lat: 33.930708, Lng: -118.368156), Route carried "under" structure: City street L100, Year Built: 1963, Structure Length: 0. m, Average Daily Traffic: 22,500 (year 2015), Truck Traffic: 1%, Features Intersected: IMPERIAL HIGHWAY, Facility Carried by Structure: INTERSTATE 405
Minimum Vertical Clearance: 4.64m (15.22ft), Kilometerpoint: 0.000, Lanes on structure: 11, Lanes under structure: 6, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 30.8m (101.0ft)
Structure Number: 53 1241, Location: 07-LA-405-R21.22-LA (Lat: 33.930708, Lng: -118.368156), Route carried "under" structure: City street L100, Year Built: 1963, Structure Length: 0. m, Average Daily Traffic: 22,500 (year 2015), Truck Traffic: 1%, Features Intersected: IMPERIAL HIGHWAY, Facility Carried by Structure: INTERSTATE 405
Minimum Vertical Clearance: 4.64m (15.22ft), Kilometerpoint: 0.000, Lanes on structure: 11, Lanes under structure: 6, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 30.8m (101.0ft)
Find on map >> Show street view
Structure Number: 53 1241J, Location: 07-LA-405-R21.22-LA (Lat: 33.930692, Lng: -118.369233), Route carried "under" structure: Bypass Interstate 405, Year Built: 1994, Structure Length: 0. m, Average Daily Traffic: 3,000 (year 2015), Truck Traffic: 1%, Features Intersected: IMPERIAL HWY & S405 ON
Minimum Vertical Clearance: 5.05m (16.57ft), Kilometerpoint: 21.260, Lanes on structure: 1, Lanes under structure: 8, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 43.0m (141.1ft)
Structure Number: 53 1241J, Location: 07-LA-405-R21.22-LA (Lat: 33.930692, Lng: -118.369233), Route carried "under" structure: Bypass Interstate 405, Year Built: 1994, Structure Length: 0. m, Average Daily Traffic: 3,000 (year 2015), Truck Traffic: 1%, Features Intersected: IMPERIAL HWY & S405 ON
Minimum Vertical Clearance: 5.05m (16.57ft), Kilometerpoint: 21.260, Lanes on structure: 1, Lanes under structure: 8, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 43.0m (141.1ft)
Find on map >> Show street view
Structure Number: 53 1241J, Location: 07-LA-405-R21.22-LA (Lat: 33.930692, Lng: -118.369233), Route carried "under" structure: City street L100, Year Built: 1994, Structure Length: 0. m, Average Daily Traffic: 22,500 (year 2015), Truck Traffic: 1%, Features Intersected: IMPERIAL HWY & S405 ON, Facility Carried by Structure: S405-LA CIENEGA OF
Minimum Vertical Clearance: 4.57m (14.99ft), Kilometerpoint: 0.000, Lanes on structure: 1, Lanes under structure: 8, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 43.0m (141.1ft)
Structure Number: 53 1241J, Location: 07-LA-405-R21.22-LA (Lat: 33.930692, Lng: -118.369233), Route carried "under" structure: City street L100, Year Built: 1994, Structure Length: 0. m, Average Daily Traffic: 22,500 (year 2015), Truck Traffic: 1%, Features Intersected: IMPERIAL HWY & S405 ON, Facility Carried by Structure: S405-LA CIENEGA OF
Minimum Vertical Clearance: 4.57m (14.99ft), Kilometerpoint: 0.000, Lanes on structure: 1, Lanes under structure: 8, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 43.0m (141.1ft)
Find on map >> Show street view
Structure Number: 53 1241S, Location: 07-LA-405-R21.22-LA (Lat: 33.930708, Lng: -118.367989), Route carried "under" structure: City street L100, Year Built: 1963, Structure Length: 0. m, Average Daily Traffic: 22,000 (year 2011), Truck Traffic: 1%, Features Intersected: IMPERIAL HIGHWAY, Facility Carried by Structure: N405-CENTURY BL OF
Minimum Vertical Clearance: 4.55m (14.93ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 6, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 30.8m (101.0ft)
Structure Number: 53 1241S, Location: 07-LA-405-R21.22-LA (Lat: 33.930708, Lng: -118.367989), Route carried "under" structure: City street L100, Year Built: 1963, Structure Length: 0. m, Average Daily Traffic: 22,000 (year 2011), Truck Traffic: 1%, Features Intersected: IMPERIAL HIGHWAY, Facility Carried by Structure: N405-CENTURY BL OF
Minimum Vertical Clearance: 4.55m (14.93ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 6, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 30.8m (101.0ft)
Find on map >> Show street view
Structure Number: 53 1251, Location: 07-LA-405-24.27-LA (Lat: 33.971622, Lng: -118.378019), Route carried "under" structure: Interstate 405, Year Built: 1963, Structure Length: 0. m, Average Daily Traffic: 266,000 (year 2011), Truck Traffic: 4%, Features Intersected: ROUTE 405, Facility Carried by Structure: LA TIJERA BLVD
Minimum Vertical Clearance: 5.00m (16.40ft), Kilometerpoint: 24.270, Lanes on structure: 6, Lanes under structure: 8, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 21.9m (71.9ft)
Structure Number: 53 1251, Location: 07-LA-405-24.27-LA (Lat: 33.971622, Lng: -118.378019), Route carried "under" structure: Interstate 405, Year Built: 1963, Structure Length: 0. m, Average Daily Traffic: 266,000 (year 2011), Truck Traffic: 4%, Features Intersected: ROUTE 405, Facility Carried by Structure: LA TIJERA BLVD
Minimum Vertical Clearance: 5.00m (16.40ft), Kilometerpoint: 24.270, Lanes on structure: 6, Lanes under structure: 8, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 21.9m (71.9ft)
Find on map >> Show street view
Structure Number: 53 1264, Location: 07-LA-101-19.50-LA (Lat: 34.171394, Lng: -118.505169), Route carried "under" structure: US 101, Year Built: 1958, Structure Length: 0. m, Average Daily Traffic: 296,000 (year 2018), Truck Traffic: 10%, Features Intersected: U.S. HIGHWAY 101, Facility Carried by Structure: PEDESTRIAN WALKWAY
Minimum Vertical Clearance: 4.57m (14.99ft), Kilometerpoint: 19.500, Lanes under structure: 10, Material/Design: Prestressed concrete continuous, Design/Construction: Slab, Length of Maximum Span: 25.6m (84.0ft)
Structure Number: 53 1264, Location: 07-LA-101-19.50-LA (Lat: 34.171394, Lng: -118.505169), Route carried "under" structure: US 101, Year Built: 1958, Structure Length: 0. m, Average Daily Traffic: 296,000 (year 2018), Truck Traffic: 10%, Features Intersected: U.S. HIGHWAY 101, Facility Carried by Structure: PEDESTRIAN WALKWAY
Minimum Vertical Clearance: 4.57m (14.99ft), Kilometerpoint: 19.500, Lanes under structure: 10, Material/Design: Prestressed concrete continuous, Design/Construction: Slab, Length of Maximum Span: 25.6m (84.0ft)
Find on map >> Show street view
Structure Number: 53 1272, Location: 07-LA-134-0.35-LA (Lat: 34.152764, Lng: -118.370650), Route carried "under" structure: City street , Year Built: 1962, Structure Length: 0. m, Average Daily Traffic: 18,900 (year 2012), Truck Traffic: 2%, Features Intersected: VINELAND AVENUE, Facility Carried by Structure: STATE ROUTE 134
Minimum Vertical Clearance: 4.55m (14.93ft), Kilometerpoint: 0.000, Lanes on structure: 11, Lanes under structure: 7, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 18.7m (61.4ft)
Structure Number: 53 1272, Location: 07-LA-134-0.35-LA (Lat: 34.152764, Lng: -118.370650), Route carried "under" structure: City street , Year Built: 1962, Structure Length: 0. m, Average Daily Traffic: 18,900 (year 2012), Truck Traffic: 2%, Features Intersected: VINELAND AVENUE, Facility Carried by Structure: STATE ROUTE 134
Minimum Vertical Clearance: 4.55m (14.93ft), Kilometerpoint: 0.000, Lanes on structure: 11, Lanes under structure: 7, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 18.7m (61.4ft)
Find on map >> Show street view
Structure Number: 53 1273, Location: 07-LA-134-0.51-LA (Lat: 34.152922, Lng: -118.367714), Route carried "under" structure: City street , Year Built: 1962, Structure Length: 0. m, Average Daily Traffic: 25,900 (year 2012), Truck Traffic: 2%, Features Intersected: LANKERSHIM BLVD, Facility Carried by Structure: STATE ROUTE 134
Minimum Vertical Clearance: 4.57m (14.99ft), Kilometerpoint: 0.000, Lanes on structure: 11, Lanes under structure: 4, Material/Design: Concrete, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 33.8m (110.9ft)
Structure Number: 53 1273, Location: 07-LA-134-0.51-LA (Lat: 34.152922, Lng: -118.367714), Route carried "under" structure: City street , Year Built: 1962, Structure Length: 0. m, Average Daily Traffic: 25,900 (year 2012), Truck Traffic: 2%, Features Intersected: LANKERSHIM BLVD, Facility Carried by Structure: STATE ROUTE 134
Minimum Vertical Clearance: 4.57m (14.99ft), Kilometerpoint: 0.000, Lanes on structure: 11, Lanes under structure: 4, Material/Design: Concrete, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 33.8m (110.9ft)
Find on map >> Show street view
Structure Number: 53 1274, Location: 07-LA-134-0.86-LA (Lat: 34.153039, Lng: -118.361758), Route carried "under" structure: City street , Year Built: 1962, Structure Length: 0. m, Average Daily Traffic: 16,100 (year 2012), Truck Traffic: 2%, Features Intersected: CAHUENGA BLVD, Facility Carried by Structure: STATE ROUTE 134
Minimum Vertical Clearance: 4.83m (15.85ft), Kilometerpoint: 0.000, Lanes on structure: 10, Lanes under structure: 5, Material/Design: Concrete, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 28.3m (92.8ft)
Structure Number: 53 1274, Location: 07-LA-134-0.86-LA (Lat: 34.153039, Lng: -118.361758), Route carried "under" structure: City street , Year Built: 1962, Structure Length: 0. m, Average Daily Traffic: 16,100 (year 2012), Truck Traffic: 2%, Features Intersected: CAHUENGA BLVD, Facility Carried by Structure: STATE ROUTE 134
Minimum Vertical Clearance: 4.83m (15.85ft), Kilometerpoint: 0.000, Lanes on structure: 10, Lanes under structure: 5, Material/Design: Concrete, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 28.3m (92.8ft)
Find on map >> Show street view
Structure Number: 53 1275, Location: 07-LA-134-1.11-LA (Lat: 34.152839, Lng: -118.357331), Route carried "under" structure: City street , Year Built: 1962, Structure Length: 0. m, Average Daily Traffic: 1,400 (year 2012), Truck Traffic: 2%, Features Intersected: LEDGE AVE, Facility Carried by Structure: STATE ROUTE 134
Minimum Vertical Clearance: 4.75m (15.58ft), Kilometerpoint: 0.000, Lanes on structure: 10, Lanes under structure: 2, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 18.9m (62.0ft)
Structure Number: 53 1275, Location: 07-LA-134-1.11-LA (Lat: 34.152839, Lng: -118.357331), Route carried "under" structure: City street , Year Built: 1962, Structure Length: 0. m, Average Daily Traffic: 1,400 (year 2012), Truck Traffic: 2%, Features Intersected: LEDGE AVE, Facility Carried by Structure: STATE ROUTE 134
Minimum Vertical Clearance: 4.75m (15.58ft), Kilometerpoint: 0.000, Lanes on structure: 10, Lanes under structure: 2, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 18.9m (62.0ft)
Find on map >> Show street view
Structure Number: 53 1276, Location: 07-LA-134-1.36-LA (Lat: 34.152900, Lng: -118.353000), Route carried "under" structure: City street , Year Built: 1962, Structure Length: 0. m, Average Daily Traffic: 4,900 (year 2012), Truck Traffic: 2%, Features Intersected: FORMAN AVE, Facility Carried by Structure: STATE ROUTE 134
Minimum Vertical Clearance: 4.72m (15.49ft), Kilometerpoint: 0.000, Lanes on structure: 10, Lanes under structure: 2, Material/Design: Prestressed concrete, Design/Construction: Tee Beam, Length of Maximum Span: 26.5m (86.9ft)
Structure Number: 53 1276, Location: 07-LA-134-1.36-LA (Lat: 34.152900, Lng: -118.353000), Route carried "under" structure: City street , Year Built: 1962, Structure Length: 0. m, Average Daily Traffic: 4,900 (year 2012), Truck Traffic: 2%, Features Intersected: FORMAN AVE, Facility Carried by Structure: STATE ROUTE 134
Minimum Vertical Clearance: 4.72m (15.49ft), Kilometerpoint: 0.000, Lanes on structure: 10, Lanes under structure: 2, Material/Design: Prestressed concrete, Design/Construction: Tee Beam, Length of Maximum Span: 26.5m (86.9ft)
Find on map >> Show street view
Structure Number: 53 1286, Location: 07-LA-134-3.81-LA (Lat: 34.154736, Lng: -118.311022), Route carried "under" structure: City street , Year Built: 1962, Structure Length: 0. m, Average Daily Traffic: 10,500 (year 2012), Truck Traffic: 2%, Features Intersected: FOREST LAWN DRIVE, Facility Carried by Structure: STATE ROUTE 134
Minimum Vertical Clearance: 4.54m (14.90ft), Kilometerpoint: 0.000, Lanes on structure: 10, Lanes under structure: 2, Material/Design: Concrete, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 18.6m (61.0ft)
Structure Number: 53 1286, Location: 07-LA-134-3.81-LA (Lat: 34.154736, Lng: -118.311022), Route carried "under" structure: City street , Year Built: 1962, Structure Length: 0. m, Average Daily Traffic: 10,500 (year 2012), Truck Traffic: 2%, Features Intersected: FOREST LAWN DRIVE, Facility Carried by Structure: STATE ROUTE 134
Minimum Vertical Clearance: 4.54m (14.90ft), Kilometerpoint: 0.000, Lanes on structure: 10, Lanes under structure: 2, Material/Design: Concrete, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 18.6m (61.0ft)
Find on map >> Show street view
Structure Number: 53 1287, Location: 07-LA-134-4.81-LA (Lat: 34.155536, Lng: -118.293997), Route carried "under" structure: State highway 134, Year Built: 1962, Structure Length: 0. m, Average Daily Traffic: 23,400 (year 2017), Truck Traffic: 4%, Features Intersected: STATE ROUTE 134, Facility Carried by Structure: RIVERSIDE DRIVE
Minimum Vertical Clearance: 4.57m (14.99ft), Kilometerpoint: 4.810, Lanes on structure: 4, Lanes under structure: 10, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 21.0m (68.9ft)
Structure Number: 53 1287, Location: 07-LA-134-4.81-LA (Lat: 34.155536, Lng: -118.293997), Route carried "under" structure: State highway 134, Year Built: 1962, Structure Length: 0. m, Average Daily Traffic: 23,400 (year 2017), Truck Traffic: 4%, Features Intersected: STATE ROUTE 134, Facility Carried by Structure: RIVERSIDE DRIVE
Minimum Vertical Clearance: 4.57m (14.99ft), Kilometerpoint: 4.810, Lanes on structure: 4, Lanes under structure: 10, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 21.0m (68.9ft)
Find on map >> Show street view
Structure Number: 53 1289, Location: 07-LA-101-19.99-LA (Lat: 34.170997, Lng: -118.514317), Route carried "under" structure: US 101, Year Built: 1959, Structure Length: 0. m, Average Daily Traffic: 296,000 (year 2012), Truck Traffic: 10%, Features Intersected: U.S. HIGHWAY 101, Facility Carried by Structure: PEDESTRIAN WALKWAY
Minimum Vertical Clearance: 4.47m (14.67ft), Kilometerpoint: 19.990, Lanes under structure: 10, Material/Design: Prestressed concrete continuous, Design/Construction: Slab, Length of Maximum Span: 21.3m (69.9ft)
Structure Number: 53 1289, Location: 07-LA-101-19.99-LA (Lat: 34.170997, Lng: -118.514317), Route carried "under" structure: US 101, Year Built: 1959, Structure Length: 0. m, Average Daily Traffic: 296,000 (year 2012), Truck Traffic: 10%, Features Intersected: U.S. HIGHWAY 101, Facility Carried by Structure: PEDESTRIAN WALKWAY
Minimum Vertical Clearance: 4.47m (14.67ft), Kilometerpoint: 19.990, Lanes under structure: 10, Material/Design: Prestressed concrete continuous, Design/Construction: Slab, Length of Maximum Span: 21.3m (69.9ft)
Find on map >> Show street view
Structure Number: 53 1291, Location: 07-LA-405-40.29-LA (Lat: 34.172000, Lng: -118.467914), Route carried "under" structure: Interstate 405, Year Built: 1963, Structure Length: 0. m, Average Daily Traffic: 220,000 (year 2019), Truck Traffic: 4%, Features Intersected: I 405, Facility Carried by Structure: BURBANK BLVD
Minimum Vertical Clearance: 4.67m (15.32ft), Kilometerpoint: 40.290, Lanes on structure: 8, Lanes under structure: 10, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 21.6m (70.9ft)
Structure Number: 53 1291, Location: 07-LA-405-40.29-LA (Lat: 34.172000, Lng: -118.467914), Route carried "under" structure: Interstate 405, Year Built: 1963, Structure Length: 0. m, Average Daily Traffic: 220,000 (year 2019), Truck Traffic: 4%, Features Intersected: I 405, Facility Carried by Structure: BURBANK BLVD
Minimum Vertical Clearance: 4.67m (15.32ft), Kilometerpoint: 40.290, Lanes on structure: 8, Lanes under structure: 10, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 21.6m (70.9ft)
Find on map >> Show street view
Structure Number: 53 1292, Location: 07-LA-110-14.18-LA (Lat: 33.933825, Lng: -118.281000), Route carried "under" structure: Interstate 110, Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 300,000 (year 2020), Features Intersected: I 110, Facility Carried by Structure: 111TH PLACE
Minimum Vertical Clearance: 5.00m (16.40ft), Kilometerpoint: 14.180, Lanes on structure: 2, Lanes under structure: 14, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 68.3m (224.1ft)
Structure Number: 53 1292, Location: 07-LA-110-14.18-LA (Lat: 33.933825, Lng: -118.281000), Route carried "under" structure: Interstate 110, Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 300,000 (year 2020), Features Intersected: I 110, Facility Carried by Structure: 111TH PLACE
Minimum Vertical Clearance: 5.00m (16.40ft), Kilometerpoint: 14.180, Lanes on structure: 2, Lanes under structure: 14, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 68.3m (224.1ft)
Find on map >> Show street view
Structure Number: 53 1301, Location: 07-LA-010-14.23-LA (Lat: 34.036733, Lng: -118.284378), Route carried "under" structure: City street L299, Year Built: 1959, Structure Length: 0. m, Average Daily Traffic: 1,000 (year 2018), Truck Traffic: 1%, Features Intersected: RTE 110 & 29 STREETS, Facility Carried by Structure: RTE 10 & RAMPS
Minimum Vertical Clearance: 5.43m (17.81ft), Kilometerpoint: 0.000, Lanes on structure: 8, Lanes under structure: 2, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 58.5m (191.9ft)
Structure Number: 53 1301, Location: 07-LA-010-14.23-LA (Lat: 34.036733, Lng: -118.284378), Route carried "under" structure: City street L299, Year Built: 1959, Structure Length: 0. m, Average Daily Traffic: 1,000 (year 2018), Truck Traffic: 1%, Features Intersected: RTE 110 & 29 STREETS, Facility Carried by Structure: RTE 10 & RAMPS
Minimum Vertical Clearance: 5.43m (17.81ft), Kilometerpoint: 0.000, Lanes on structure: 8, Lanes under structure: 2, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 58.5m (191.9ft)
Find on map >> Show street view
Structure Number: 53 1301, Location: 07-LA-010-14.23-LA (Lat: 34.036733, Lng: -118.284378), Route carried "under" structure: City street L151, Year Built: 1959, Structure Length: 0. m, Average Daily Traffic: 1,000 (year 2018), Truck Traffic: 1%, Features Intersected: RTE 110 & 29 STREETS, Facility Carried by Structure: RTE 10 & RAMPS
Minimum Vertical Clearance: 5.13m (16.83ft), Kilometerpoint: 0.000, Lanes on structure: 8, Lanes under structure: 2, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 58.5m (191.9ft)
Structure Number: 53 1301, Location: 07-LA-010-14.23-LA (Lat: 34.036733, Lng: -118.284378), Route carried "under" structure: City street L151, Year Built: 1959, Structure Length: 0. m, Average Daily Traffic: 1,000 (year 2018), Truck Traffic: 1%, Features Intersected: RTE 110 & 29 STREETS, Facility Carried by Structure: RTE 10 & RAMPS
Minimum Vertical Clearance: 5.13m (16.83ft), Kilometerpoint: 0.000, Lanes on structure: 8, Lanes under structure: 2, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 58.5m (191.9ft)
Find on map >> Show street view
Structure Number: 53 1301, Location: 07-LA-010-14.23-LA (Lat: 34.036733, Lng: -118.284378), Route carried "under" structure: City street L149, Year Built: 1959, Structure Length: 0. m, Average Daily Traffic: 1,000 (year 2018), Truck Traffic: 1%, Features Intersected: RTE 110 & 29 STREETS, Facility Carried by Structure: RTE 10 & RAMPS
Minimum Vertical Clearance: 5.10m (16.73ft), Kilometerpoint: 0.000, Lanes on structure: 8, Lanes under structure: 6, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 58.5m (191.9ft)
Structure Number: 53 1301, Location: 07-LA-010-14.23-LA (Lat: 34.036733, Lng: -118.284378), Route carried "under" structure: City street L149, Year Built: 1959, Structure Length: 0. m, Average Daily Traffic: 1,000 (year 2018), Truck Traffic: 1%, Features Intersected: RTE 110 & 29 STREETS, Facility Carried by Structure: RTE 10 & RAMPS
Minimum Vertical Clearance: 5.10m (16.73ft), Kilometerpoint: 0.000, Lanes on structure: 8, Lanes under structure: 6, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 58.5m (191.9ft)
Find on map >> Show street view
Structure Number: 53 1301, Location: 07-LA-010-14.23-LA (Lat: 34.036733, Lng: -118.284378), Route carried "under" structure: City street Q588, Year Built: 1959, Structure Length: 0. m, Average Daily Traffic: 1,000 (year 2018), Truck Traffic: 1%, Features Intersected: RTE 110 & 29 STREETS, Facility Carried by Structure: RTE 10 & RAMPS
Minimum Vertical Clearance: 4.67m (15.32ft), Kilometerpoint: 0.000, Lanes on structure: 8, Lanes under structure: 2, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 58.5m (191.9ft)
Structure Number: 53 1301, Location: 07-LA-010-14.23-LA (Lat: 34.036733, Lng: -118.284378), Route carried "under" structure: City street Q588, Year Built: 1959, Structure Length: 0. m, Average Daily Traffic: 1,000 (year 2018), Truck Traffic: 1%, Features Intersected: RTE 110 & 29 STREETS, Facility Carried by Structure: RTE 10 & RAMPS
Minimum Vertical Clearance: 4.67m (15.32ft), Kilometerpoint: 0.000, Lanes on structure: 8, Lanes under structure: 2, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 58.5m (191.9ft)
Find on map >> Show street view
Structure Number: 53 1301, Location: 07-LA-010-14.23-LA (Lat: 34.036733, Lng: -118.284378), Route carried "under" structure: City street L314, Year Built: 1959, Structure Length: 0. m, Average Daily Traffic: 1,000 (year 2018), Truck Traffic: 1%, Features Intersected: RTE 110 & 29 STREETS, Facility Carried by Structure: RTE 10 & RAMPS
Minimum Vertical Clearance: 4.47m (14.67ft), Kilometerpoint: 0.000, Lanes on structure: 8, Lanes under structure: 4, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 58.5m (191.9ft)
Structure Number: 53 1301, Location: 07-LA-010-14.23-LA (Lat: 34.036733, Lng: -118.284378), Route carried "under" structure: City street L314, Year Built: 1959, Structure Length: 0. m, Average Daily Traffic: 1,000 (year 2018), Truck Traffic: 1%, Features Intersected: RTE 110 & 29 STREETS, Facility Carried by Structure: RTE 10 & RAMPS
Minimum Vertical Clearance: 4.47m (14.67ft), Kilometerpoint: 0.000, Lanes on structure: 8, Lanes under structure: 4, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 58.5m (191.9ft)
Find on map >> Show street view
Structure Number: 53 1301, Location: 07-LA-010-14.23-LA (Lat: 34.036733, Lng: -118.284378), Route carried "under" structure: City street L315, Year Built: 1959, Structure Length: 0. m, Average Daily Traffic: 1,000 (year 2011), Truck Traffic: 1%, Features Intersected: RTE 110 & 29 STREETS, Facility Carried by Structure: RTE 10 & RAMPS
Minimum Vertical Clearance: 4.74m (15.55ft), Kilometerpoint: 0.000, Lanes on structure: 8, Lanes under structure: 4, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 58.5m (191.9ft)
Structure Number: 53 1301, Location: 07-LA-010-14.23-LA (Lat: 34.036733, Lng: -118.284378), Route carried "under" structure: City street L315, Year Built: 1959, Structure Length: 0. m, Average Daily Traffic: 1,000 (year 2011), Truck Traffic: 1%, Features Intersected: RTE 110 & 29 STREETS, Facility Carried by Structure: RTE 10 & RAMPS
Minimum Vertical Clearance: 4.74m (15.55ft), Kilometerpoint: 0.000, Lanes on structure: 8, Lanes under structure: 4, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 58.5m (191.9ft)
Find on map >> Show street view
Structure Number: 53 1301, Location: 07-LA-010-14.23-LA (Lat: 34.036733, Lng: -118.284378), Route carried "under" structure: City street L316, Year Built: 1959, Structure Length: 0. m, Average Daily Traffic: 1,000 (year 2011), Truck Traffic: 1%, Features Intersected: RTE 110 & 29 STREETS, Facility Carried by Structure: RTE 10 & RAMPS
Minimum Vertical Clearance: 5.25m (17.22ft), Kilometerpoint: 0.000, Lanes on structure: 8, Lanes under structure: 5, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 58.5m (191.9ft)
Structure Number: 53 1301, Location: 07-LA-010-14.23-LA (Lat: 34.036733, Lng: -118.284378), Route carried "under" structure: City street L316, Year Built: 1959, Structure Length: 0. m, Average Daily Traffic: 1,000 (year 2011), Truck Traffic: 1%, Features Intersected: RTE 110 & 29 STREETS, Facility Carried by Structure: RTE 10 & RAMPS
Minimum Vertical Clearance: 5.25m (17.22ft), Kilometerpoint: 0.000, Lanes on structure: 8, Lanes under structure: 5, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 58.5m (191.9ft)
Find on map >> Show street view
Structure Number: 53 1301, Location: 07-LA-010-14.23-LA (Lat: 34.036733, Lng: -118.284378), Route carried "under" structure: City street L318, Year Built: 1959, Structure Length: 0. m, Average Daily Traffic: 1,000 (year 2011), Truck Traffic: 1%, Features Intersected: RTE 110 & 29 STREETS, Facility Carried by Structure: RTE 10 & RAMPS
Minimum Vertical Clearance: 4.57m (14.99ft), Kilometerpoint: 0.000, Lanes on structure: 8, Lanes under structure: 3, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 58.5m (191.9ft)
Structure Number: 53 1301, Location: 07-LA-010-14.23-LA (Lat: 34.036733, Lng: -118.284378), Route carried "under" structure: City street L318, Year Built: 1959, Structure Length: 0. m, Average Daily Traffic: 1,000 (year 2011), Truck Traffic: 1%, Features Intersected: RTE 110 & 29 STREETS, Facility Carried by Structure: RTE 10 & RAMPS
Minimum Vertical Clearance: 4.57m (14.99ft), Kilometerpoint: 0.000, Lanes on structure: 8, Lanes under structure: 3, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 58.5m (191.9ft)
Find on map >> Show street view
Structure Number: 53 1301, Location: 07-LA-010-14.23-LA (Lat: 34.036733, Lng: -118.284378), Route carried "under" structure: City street L331, Year Built: 1959, Structure Length: 0. m, Average Daily Traffic: 1,000 (year 2011), Truck Traffic: 1%, Features Intersected: RTE 110 & 29 STREETS, Facility Carried by Structure: RTE 10 & RAMPS
Minimum Vertical Clearance: 4.84m (15.88ft), Kilometerpoint: 0.000, Lanes on structure: 8, Lanes under structure: 4, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 58.5m (191.9ft)
Structure Number: 53 1301, Location: 07-LA-010-14.23-LA (Lat: 34.036733, Lng: -118.284378), Route carried "under" structure: City street L331, Year Built: 1959, Structure Length: 0. m, Average Daily Traffic: 1,000 (year 2011), Truck Traffic: 1%, Features Intersected: RTE 110 & 29 STREETS, Facility Carried by Structure: RTE 10 & RAMPS
Minimum Vertical Clearance: 4.84m (15.88ft), Kilometerpoint: 0.000, Lanes on structure: 8, Lanes under structure: 4, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 58.5m (191.9ft)
Find on map >> Show street view
Structure Number: 53 1301, Location: 07-LA-010-14.23-LA (Lat: 34.036733, Lng: -118.284378), Route carried "under" structure: City street L336, Year Built: 1959, Structure Length: 0. m, Average Daily Traffic: 10,000 (year 2016), Truck Traffic: 1%, Features Intersected: RTE 110 & 29 STREETS, Facility Carried by Structure: RTE 10 & RAMPS
Minimum Vertical Clearance: 4.59m (15.06ft), Kilometerpoint: 0.000, Lanes on structure: 8, Lanes under structure: 4, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 58.5m (191.9ft)
Structure Number: 53 1301, Location: 07-LA-010-14.23-LA (Lat: 34.036733, Lng: -118.284378), Route carried "under" structure: City street L336, Year Built: 1959, Structure Length: 0. m, Average Daily Traffic: 10,000 (year 2016), Truck Traffic: 1%, Features Intersected: RTE 110 & 29 STREETS, Facility Carried by Structure: RTE 10 & RAMPS
Minimum Vertical Clearance: 4.59m (15.06ft), Kilometerpoint: 0.000, Lanes on structure: 8, Lanes under structure: 4, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 58.5m (191.9ft)
Find on map >> Show street view
Structure Number: 53 1301, Location: 07-LA-010-14.23-LA (Lat: 34.036733, Lng: -118.284378), Route carried "under" structure: City street L100, Year Built: 1959, Structure Length: 0. m, Average Daily Traffic: 1,000 (year 2016), Truck Traffic: 1%, Features Intersected: RTE 110 & 29 STREETS, Facility Carried by Structure: RTE 10 & RAMPS
Minimum Vertical Clearance: 5.33m (17.49ft), Kilometerpoint: 0.000, Lanes on structure: 8, Lanes under structure: 6, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 58.5m (191.9ft)
Structure Number: 53 1301, Location: 07-LA-010-14.23-LA (Lat: 34.036733, Lng: -118.284378), Route carried "under" structure: City street L100, Year Built: 1959, Structure Length: 0. m, Average Daily Traffic: 1,000 (year 2016), Truck Traffic: 1%, Features Intersected: RTE 110 & 29 STREETS, Facility Carried by Structure: RTE 10 & RAMPS
Minimum Vertical Clearance: 5.33m (17.49ft), Kilometerpoint: 0.000, Lanes on structure: 8, Lanes under structure: 6, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 58.5m (191.9ft)
Find on map >> Show street view
Structure Number: 53 1301, Location: 07-LA-010-14.23-LA (Lat: 34.036733, Lng: -118.284378), Route carried "under" structure: City street L089, Year Built: 1959, Structure Length: 0. m, Average Daily Traffic: 1,000 (year 2016), Truck Traffic: 1%, Features Intersected: RTE 110 & 29 STREETS, Facility Carried by Structure: RTE 10 & RAMPS
Minimum Vertical Clearance: 5.20m (17.06ft), Kilometerpoint: 0.000, Lanes on structure: 8, Lanes under structure: 4, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 58.5m (191.9ft)
Structure Number: 53 1301, Location: 07-LA-010-14.23-LA (Lat: 34.036733, Lng: -118.284378), Route carried "under" structure: City street L089, Year Built: 1959, Structure Length: 0. m, Average Daily Traffic: 1,000 (year 2016), Truck Traffic: 1%, Features Intersected: RTE 110 & 29 STREETS, Facility Carried by Structure: RTE 10 & RAMPS
Minimum Vertical Clearance: 5.20m (17.06ft), Kilometerpoint: 0.000, Lanes on structure: 8, Lanes under structure: 4, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 58.5m (191.9ft)
Find on map >> Show street view
Structure Number: 53 1301, Location: 07-LA-010-14.23-LA (Lat: 34.036733, Lng: -118.284378), Route carried "under" structure: City street L049, Year Built: 1959, Structure Length: 0. m, Average Daily Traffic: 1,000 (year 2016), Truck Traffic: 2%, Features Intersected: RTE 110 & 29 STREETS, Facility Carried by Structure: RTE 10 & RAMPS
Minimum Vertical Clearance: 4.64m (15.22ft), Kilometerpoint: 0.000, Lanes on structure: 8, Lanes under structure: 4, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 58.5m (191.9ft)
Structure Number: 53 1301, Location: 07-LA-010-14.23-LA (Lat: 34.036733, Lng: -118.284378), Route carried "under" structure: City street L049, Year Built: 1959, Structure Length: 0. m, Average Daily Traffic: 1,000 (year 2016), Truck Traffic: 2%, Features Intersected: RTE 110 & 29 STREETS, Facility Carried by Structure: RTE 10 & RAMPS
Minimum Vertical Clearance: 4.64m (15.22ft), Kilometerpoint: 0.000, Lanes on structure: 8, Lanes under structure: 4, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 58.5m (191.9ft)
Find on map >> Show street view
Structure Number: 53 1301, Location: 07-LA-010-14.23-LA (Lat: 34.036733, Lng: -118.284378), Route carried "under" structure: City street L047, Year Built: 1959, Structure Length: 0. m, Average Daily Traffic: 1,000 (year 2018), Truck Traffic: 2%, Features Intersected: RTE 110 & 29 STREETS, Facility Carried by Structure: RTE 10 & RAMPS
Minimum Vertical Clearance: 7.62m (25.00ft), Kilometerpoint: 0.000, Lanes on structure: 8, Lanes under structure: 4, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 58.5m (191.9ft)
Structure Number: 53 1301, Location: 07-LA-010-14.23-LA (Lat: 34.036733, Lng: -118.284378), Route carried "under" structure: City street L047, Year Built: 1959, Structure Length: 0. m, Average Daily Traffic: 1,000 (year 2018), Truck Traffic: 2%, Features Intersected: RTE 110 & 29 STREETS, Facility Carried by Structure: RTE 10 & RAMPS
Minimum Vertical Clearance: 7.62m (25.00ft), Kilometerpoint: 0.000, Lanes on structure: 8, Lanes under structure: 4, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 58.5m (191.9ft)
Find on map >> Show street view
Structure Number: 53 1301, Location: 07-LA-010-14.23-LA (Lat: 34.036733, Lng: -118.284378), Route carried "under" structure: City street L043, Year Built: 1959, Structure Length: 0. m, Average Daily Traffic: 1,000 (year 2016), Truck Traffic: 2%, Features Intersected: RTE 110 & 29 STREETS, Facility Carried by Structure: RTE 10 & RAMPS
Minimum Vertical Clearance: 4.59m (15.06ft), Kilometerpoint: 0.000, Lanes on structure: 8, Lanes under structure: 6, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 58.5m (191.9ft)
Structure Number: 53 1301, Location: 07-LA-010-14.23-LA (Lat: 34.036733, Lng: -118.284378), Route carried "under" structure: City street L043, Year Built: 1959, Structure Length: 0. m, Average Daily Traffic: 1,000 (year 2016), Truck Traffic: 2%, Features Intersected: RTE 110 & 29 STREETS, Facility Carried by Structure: RTE 10 & RAMPS
Minimum Vertical Clearance: 4.59m (15.06ft), Kilometerpoint: 0.000, Lanes on structure: 8, Lanes under structure: 6, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 58.5m (191.9ft)
Find on map >> Show street view
Structure Number: 53 1301, Location: 07-LA-010-14.23-LA (Lat: 34.036733, Lng: -118.284378), Route carried "under" structure: City street L042, Year Built: 1959, Structure Length: 0. m, Average Daily Traffic: 1,000 (year 2018), Truck Traffic: 2%, Features Intersected: RTE 110 & 29 STREETS, Facility Carried by Structure: RTE 10 & RAMPS
Minimum Vertical Clearance: 5.18m (16.99ft), Kilometerpoint: 0.000, Lanes on structure: 8, Lanes under structure: 6, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 58.5m (191.9ft)
Structure Number: 53 1301, Location: 07-LA-010-14.23-LA (Lat: 34.036733, Lng: -118.284378), Route carried "under" structure: City street L042, Year Built: 1959, Structure Length: 0. m, Average Daily Traffic: 1,000 (year 2018), Truck Traffic: 2%, Features Intersected: RTE 110 & 29 STREETS, Facility Carried by Structure: RTE 10 & RAMPS
Minimum Vertical Clearance: 5.18m (16.99ft), Kilometerpoint: 0.000, Lanes on structure: 8, Lanes under structure: 6, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 58.5m (191.9ft)
Find on map >> Show street view
Structure Number: 53 1301, Location: 07-LA-010-14.23-LA (Lat: 34.036733, Lng: -118.284378), Route carried "under" structure: City street L298, Year Built: 1959, Structure Length: 0. m, Average Daily Traffic: 1,000 (year 2011), Truck Traffic: 1%, Features Intersected: RTE 110 & 29 STREETS, Facility Carried by Structure: RTE 10 & RAMPS
Minimum Vertical Clearance: 4.77m (15.65ft), Kilometerpoint: 0.000, Lanes on structure: 8, Lanes under structure: 6, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 58.5m (191.9ft)
Structure Number: 53 1301, Location: 07-LA-010-14.23-LA (Lat: 34.036733, Lng: -118.284378), Route carried "under" structure: City street L298, Year Built: 1959, Structure Length: 0. m, Average Daily Traffic: 1,000 (year 2011), Truck Traffic: 1%, Features Intersected: RTE 110 & 29 STREETS, Facility Carried by Structure: RTE 10 & RAMPS
Minimum Vertical Clearance: 4.77m (15.65ft), Kilometerpoint: 0.000, Lanes on structure: 8, Lanes under structure: 6, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 58.5m (191.9ft)
Find on map >> Show street view
Structure Number: 53 1301, Location: 07-LA-010-14.23-LA (Lat: 34.036733, Lng: -118.284378), Route carried "under" structure: City street L183, Year Built: 1959, Structure Length: 0. m, Average Daily Traffic: 1,000 (year 2018), Truck Traffic: 1%, Features Intersected: RTE 110 & 29 STREETS, Facility Carried by Structure: RTE 10 & RAMPS
Minimum Vertical Clearance: 6.50m (21.33ft), Kilometerpoint: 0.000, Lanes on structure: 8, Lanes under structure: 5, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 58.5m (191.9ft)
Structure Number: 53 1301, Location: 07-LA-010-14.23-LA (Lat: 34.036733, Lng: -118.284378), Route carried "under" structure: City street L183, Year Built: 1959, Structure Length: 0. m, Average Daily Traffic: 1,000 (year 2018), Truck Traffic: 1%, Features Intersected: RTE 110 & 29 STREETS, Facility Carried by Structure: RTE 10 & RAMPS
Minimum Vertical Clearance: 6.50m (21.33ft), Kilometerpoint: 0.000, Lanes on structure: 8, Lanes under structure: 5, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 58.5m (191.9ft)
Find on map >> Show street view
Structure Number: 53 1301, Location: 07-LA-010-14.23-LA (Lat: 34.036733, Lng: -118.284378), Route carried "under" structure: City street L155, Year Built: 1959, Structure Length: 0. m, Average Daily Traffic: 1,000 (year 2011), Truck Traffic: 1%, Features Intersected: RTE 110 & 29 STREETS, Facility Carried by Structure: RTE 10 & RAMPS
Minimum Vertical Clearance: 7.82m (25.66ft), Kilometerpoint: 0.000, Lanes on structure: 8, Lanes under structure: 8, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 58.5m (191.9ft)
Structure Number: 53 1301, Location: 07-LA-010-14.23-LA (Lat: 34.036733, Lng: -118.284378), Route carried "under" structure: City street L155, Year Built: 1959, Structure Length: 0. m, Average Daily Traffic: 1,000 (year 2011), Truck Traffic: 1%, Features Intersected: RTE 110 & 29 STREETS, Facility Carried by Structure: RTE 10 & RAMPS
Minimum Vertical Clearance: 7.82m (25.66ft), Kilometerpoint: 0.000, Lanes on structure: 8, Lanes under structure: 8, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 58.5m (191.9ft)
Find on map >> Show street view
Structure Number: 53 1301, Location: 07-LA-010-14.23-LA (Lat: 34.036733, Lng: -118.284378), Route carried "under" structure: City street L332, Year Built: 1959, Structure Length: 0. m, Average Daily Traffic: 1,000 (year 2011), Truck Traffic: 1%, Features Intersected: RTE 110 & 29 STREETS, Facility Carried by Structure: RTE 10 & RAMPS
Minimum Vertical Clearance: 4.95m (16.24ft), Kilometerpoint: 0.000, Lanes on structure: 8, Lanes under structure: 4, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 58.5m (191.9ft)
Structure Number: 53 1301, Location: 07-LA-010-14.23-LA (Lat: 34.036733, Lng: -118.284378), Route carried "under" structure: City street L332, Year Built: 1959, Structure Length: 0. m, Average Daily Traffic: 1,000 (year 2011), Truck Traffic: 1%, Features Intersected: RTE 110 & 29 STREETS, Facility Carried by Structure: RTE 10 & RAMPS
Minimum Vertical Clearance: 4.95m (16.24ft), Kilometerpoint: 0.000, Lanes on structure: 8, Lanes under structure: 4, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 58.5m (191.9ft)
Find on map >> Show street view
Structure Number: 53 1301, Location: 07-LA-010-14.23-LA (Lat: 34.036733, Lng: -118.284378), Route carried "under" structure: City street L334, Year Built: 1959, Structure Length: 0. m, Average Daily Traffic: 1,000 (year 2011), Truck Traffic: 1%, Features Intersected: RTE 110 & 29 STREETS, Facility Carried by Structure: RTE 10 & RAMPS
Minimum Vertical Clearance: 7.62m (25.00ft), Kilometerpoint: 0.000, Lanes on structure: 8, Lanes under structure: 2, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 58.5m (191.9ft)
Structure Number: 53 1301, Location: 07-LA-010-14.23-LA (Lat: 34.036733, Lng: -118.284378), Route carried "under" structure: City street L334, Year Built: 1959, Structure Length: 0. m, Average Daily Traffic: 1,000 (year 2011), Truck Traffic: 1%, Features Intersected: RTE 110 & 29 STREETS, Facility Carried by Structure: RTE 10 & RAMPS
Minimum Vertical Clearance: 7.62m (25.00ft), Kilometerpoint: 0.000, Lanes on structure: 8, Lanes under structure: 2, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 58.5m (191.9ft)
Find on map >> Show street view
Structure Number: 53 1301, Location: 07-LA-010-14.23-LA (Lat: 34.036733, Lng: -118.284378), Route carried "under" structure: Interstate 110, Year Built: 1959, Structure Length: 0. m, Average Daily Traffic: 280,000 (year 2018), Truck Traffic: 6%, Features Intersected: RTE 110 & 29 STREETS, Facility Carried by Structure: RTE 10 & RAMPS
Minimum Vertical Clearance: 4.67m (15.32ft), Kilometerpoint: 21.440, Lanes on structure: 8, Lanes under structure: 8, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 58.5m (191.9ft)
Structure Number: 53 1301, Location: 07-LA-010-14.23-LA (Lat: 34.036733, Lng: -118.284378), Route carried "under" structure: Interstate 110, Year Built: 1959, Structure Length: 0. m, Average Daily Traffic: 280,000 (year 2018), Truck Traffic: 6%, Features Intersected: RTE 110 & 29 STREETS, Facility Carried by Structure: RTE 10 & RAMPS
Minimum Vertical Clearance: 4.67m (15.32ft), Kilometerpoint: 21.440, Lanes on structure: 8, Lanes under structure: 8, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 58.5m (191.9ft)
Find on map >> Show street view
Structure Number: 53 1301, Location: 07-LA-010-14.23-LA (Lat: 34.036733, Lng: -118.284378), Route carried "under" structure: City street L139, Year Built: 1959, Structure Length: 0. m, Average Daily Traffic: 1,000 (year 2018), Truck Traffic: 1%, Features Intersected: RTE 110 & 29 STREETS, Facility Carried by Structure: RTE 10 & RAMPS
Minimum Vertical Clearance: 4.57m (14.99ft), Kilometerpoint: 0.000, Lanes on structure: 8, Lanes under structure: 4, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 58.5m (191.9ft)
Structure Number: 53 1301, Location: 07-LA-010-14.23-LA (Lat: 34.036733, Lng: -118.284378), Route carried "under" structure: City street L139, Year Built: 1959, Structure Length: 0. m, Average Daily Traffic: 1,000 (year 2018), Truck Traffic: 1%, Features Intersected: RTE 110 & 29 STREETS, Facility Carried by Structure: RTE 10 & RAMPS
Minimum Vertical Clearance: 4.57m (14.99ft), Kilometerpoint: 0.000, Lanes on structure: 8, Lanes under structure: 4, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 58.5m (191.9ft)