Bridge Statistics for Los Angeles, California (CA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs
- National Bridge Inventory (NBI) Statistics
- 2,325Number of bridges
- 39,718ft / 12,106mTotal length
- $98,718,000Total costs
- 180,570,830Total average daily traffic
- 9,950,919Total average daily truck traffic
- National Bridge Inventory (NBI) Registered Bridges for Los Angeles
- No street view available for this location
- New bridges - historical statistics
- 121900-1909
- 41910-1919
- 431920-1929
- 721930-1939
- 1701940-1949
- 5201950-1959
- 6961960-1969
- 3091970-1979
- 1881980-1989
- 2231990-1999
- 512000-2009
- 372010-2019
- Reconstructed bridges - Historical Statistics
- 11920-1929
- 31930-1939
- 51940-1949
- 181950-1959
- 501960-1969
- 341970-1979
- 461980-1989
- 421990-1999
- 702000-2009
- 132010-2019
- Bridge Condition - Deck
- 81.7%Good
- 1.1%Satisfactory
- 15.5%Fair
- 1.7%Poor
- Bridge Condition - Superstructure
- 0.5%Very good
- 89.2%Good
- 1.1%Satisfactory
- 9.2%Fair
- Bridge Condition - Substructure
- 94.1%Good
- 2.3%Satisfactory
- 3.4%Fair
- 0.2%Poor
- Bridge Condition - Channel
- 16.2%Excellent
- 77.2%Very good
- 2.7%Good
- 2.2%Satisfactory
- 1.7%Fair
- 0.5%Poor
- 0.2%Serious
- Bridge Condition - Culverts
- 76.5%Good
- 23.5%Satisfactory
Find on map >> Show street view
Structure Number: 53 1449, Location: 07-LA-405-41.36-LA (Lat: 34.186519, Lng: -118.473875), Route carried "under" structure: City street L545, Year Built: 1963, Structure Length: 0. m, Average Daily Traffic: 25,000 (year 2019), Truck Traffic: 10%, Features Intersected: VICTORY BLVD, Facility Carried by Structure: INTERSTATE 405
Minimum Vertical Clearance: 4.72m (15.49ft), Kilometerpoint: 0.000, Lanes on structure: 11, Lanes under structure: 8, Material/Design: Concrete, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 31.4m (103.0ft)
Structure Number: 53 1449, Location: 07-LA-405-41.36-LA (Lat: 34.186519, Lng: -118.473875), Route carried "under" structure: City street L545, Year Built: 1963, Structure Length: 0. m, Average Daily Traffic: 25,000 (year 2019), Truck Traffic: 10%, Features Intersected: VICTORY BLVD, Facility Carried by Structure: INTERSTATE 405
Minimum Vertical Clearance: 4.72m (15.49ft), Kilometerpoint: 0.000, Lanes on structure: 11, Lanes under structure: 8, Material/Design: Concrete, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 31.4m (103.0ft)
Find on map >> Show street view
Structure Number: 53 1452F, Location: 07-LA-134-0.03-LA (Lat: 34.153994, Lng: -118.376100), Route carried "under" structure: City street , Year Built: 1962, Structure Length: 0. m, Average Daily Traffic: 14,000 (year 2012), Truck Traffic: 2%, Features Intersected: RIVERSIDE DR, Facility Carried by Structure: W134-N170 CONNECTR
Minimum Vertical Clearance: 4.59m (15.06ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 33.3m (109.3ft)
Structure Number: 53 1452F, Location: 07-LA-134-0.03-LA (Lat: 34.153994, Lng: -118.376100), Route carried "under" structure: City street , Year Built: 1962, Structure Length: 0. m, Average Daily Traffic: 14,000 (year 2012), Truck Traffic: 2%, Features Intersected: RIVERSIDE DR, Facility Carried by Structure: W134-N170 CONNECTR
Minimum Vertical Clearance: 4.59m (15.06ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 33.3m (109.3ft)
Find on map >> Show street view
Structure Number: 53 1457F, Location: 07-LA-110-26.12-LA (Lat: 34.085258, Lng: -118.218711), Route carried "under" structure: State highway 110, Year Built: 1962, Structure Length: 0. m, Average Daily Traffic: 182,000 (year 2012), Truck Traffic: 2%, Features Intersected: ST RTE 110 & ARROYO SECO
Minimum Vertical Clearance: 4.60m (15.09ft), Kilometerpoint: 26.120, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Prestressed concrete, Design/Construction: Tee Beam, Length of Maximum Span: 37.5m (123.0ft)
Structure Number: 53 1457F, Location: 07-LA-110-26.12-LA (Lat: 34.085258, Lng: -118.218711), Route carried "under" structure: State highway 110, Year Built: 1962, Structure Length: 0. m, Average Daily Traffic: 182,000 (year 2012), Truck Traffic: 2%, Features Intersected: ST RTE 110 & ARROYO SECO
Minimum Vertical Clearance: 4.60m (15.09ft), Kilometerpoint: 26.120, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Prestressed concrete, Design/Construction: Tee Beam, Length of Maximum Span: 37.5m (123.0ft)
Find on map >> Show street view
Structure Number: 53 146, Location: 07-LA-005-20.94-LA (Lat: 34.085544, Lng: -118.231281), Route carried "under" structure: Bypass Interstate 5, Year Built: 1961, Structure Length: 0. m, Average Daily Traffic: 4,600 (year 2015), Truck Traffic: 10%, Features Intersected: DUVALL ST-S5 & S110 ONRP
Minimum Vertical Clearance: 4.95m (16.24ft), Kilometerpoint: 20.940, Lanes on structure: 8, Lanes under structure: 1, Material/Design: Concrete, Design/Construction: Slab, Length of Maximum Span: 11.0m (36.1ft)
Structure Number: 53 146, Location: 07-LA-005-20.94-LA (Lat: 34.085544, Lng: -118.231281), Route carried "under" structure: Bypass Interstate 5, Year Built: 1961, Structure Length: 0. m, Average Daily Traffic: 4,600 (year 2015), Truck Traffic: 10%, Features Intersected: DUVALL ST-S5 & S110 ONRP
Minimum Vertical Clearance: 4.95m (16.24ft), Kilometerpoint: 20.940, Lanes on structure: 8, Lanes under structure: 1, Material/Design: Concrete, Design/Construction: Slab, Length of Maximum Span: 11.0m (36.1ft)
Find on map >> Show street view
Structure Number: 53 1460S, Location: 07-LA-005-20.94-LA (Lat: 34.085675, Lng: -118.231133), Route carried "under" structure: Bypass Interstate 5, Year Built: 1961, Structure Length: 0. m, Average Daily Traffic: 2,500 (year 2021), Truck Traffic: 10%, Features Intersected: DUVALL ST-S5 & S110 RAMP
Minimum Vertical Clearance: 6.17m (20.24ft), Kilometerpoint: 20.940, Lanes on structure: 3, Lanes under structure: 2, Material/Design: Concrete, Design/Construction: Slab, Length of Maximum Span: 11.6m (38.1ft)
Structure Number: 53 1460S, Location: 07-LA-005-20.94-LA (Lat: 34.085675, Lng: -118.231133), Route carried "under" structure: Bypass Interstate 5, Year Built: 1961, Structure Length: 0. m, Average Daily Traffic: 2,500 (year 2021), Truck Traffic: 10%, Features Intersected: DUVALL ST-S5 & S110 RAMP
Minimum Vertical Clearance: 6.17m (20.24ft), Kilometerpoint: 20.940, Lanes on structure: 3, Lanes under structure: 2, Material/Design: Concrete, Design/Construction: Slab, Length of Maximum Span: 11.6m (38.1ft)
Find on map >> Show street view
Structure Number: 53 1461, Location: 07-LA-005-20.99-LA (Lat: 34.086006, Lng: -118.231994), Route carried "under" structure: Bypass Interstate 5, Year Built: 1961, Structure Length: 0. m, Average Daily Traffic: 2,450 (year 2015), Truck Traffic: 10%, Features Intersected: S5-ELMGROVE ST OFF RAMP
Minimum Vertical Clearance: 5.00m (16.40ft), Kilometerpoint: 20.990, Lanes on structure: 8, Lanes under structure: 2, Material/Design: Prestressed concrete, Design/Construction: Slab, Length of Maximum Span: 11.9m (39.0ft)
Structure Number: 53 1461, Location: 07-LA-005-20.99-LA (Lat: 34.086006, Lng: -118.231994), Route carried "under" structure: Bypass Interstate 5, Year Built: 1961, Structure Length: 0. m, Average Daily Traffic: 2,450 (year 2015), Truck Traffic: 10%, Features Intersected: S5-ELMGROVE ST OFF RAMP
Minimum Vertical Clearance: 5.00m (16.40ft), Kilometerpoint: 20.990, Lanes on structure: 8, Lanes under structure: 2, Material/Design: Prestressed concrete, Design/Construction: Slab, Length of Maximum Span: 11.9m (39.0ft)
Find on map >> Show street view
Structure Number: 53 1461S, Location: 07-LA-005-20.99-LA (Lat: 34.086108, Lng: -118.231889), Route carried "under" structure: Bypass Interstate 5, Year Built: 1961, Structure Length: 0. m, Average Daily Traffic: 2,450 (year 2012), Truck Traffic: 10%, Features Intersected: S5-ELMGROVE ST OFF-RAMP
Minimum Vertical Clearance: 6.17m (20.24ft), Kilometerpoint: 20.990, Lanes on structure: 3, Lanes under structure: 2, Material/Design: Concrete, Design/Construction: Slab, Length of Maximum Span: 12.5m (41.0ft)
Structure Number: 53 1461S, Location: 07-LA-005-20.99-LA (Lat: 34.086108, Lng: -118.231889), Route carried "under" structure: Bypass Interstate 5, Year Built: 1961, Structure Length: 0. m, Average Daily Traffic: 2,450 (year 2012), Truck Traffic: 10%, Features Intersected: S5-ELMGROVE ST OFF-RAMP
Minimum Vertical Clearance: 6.17m (20.24ft), Kilometerpoint: 20.990, Lanes on structure: 3, Lanes under structure: 2, Material/Design: Concrete, Design/Construction: Slab, Length of Maximum Span: 12.5m (41.0ft)
Find on map >> Show street view
Structure Number: 53 1462R, Location: 07-LA-060-0.45-LA (Lat: 34.028914, Lng: -118.217322), Route carried "under" structure: Interstate 5, Year Built: 1960, Structure Length: 0. m, Average Daily Traffic: 60,000 (year 2019), Truck Traffic: 7%, Features Intersected: INTERSTATE 5 SB, Facility Carried by Structure: ST RTE 60 EB
Minimum Vertical Clearance: 4.55m (14.93ft), Kilometerpoint: 16.490, Lanes on structure: 5, Lanes under structure: 2, Material/Design: Concrete, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 34.4m (112.9ft)
Structure Number: 53 1462R, Location: 07-LA-060-0.45-LA (Lat: 34.028914, Lng: -118.217322), Route carried "under" structure: Interstate 5, Year Built: 1960, Structure Length: 0. m, Average Daily Traffic: 60,000 (year 2019), Truck Traffic: 7%, Features Intersected: INTERSTATE 5 SB, Facility Carried by Structure: ST RTE 60 EB
Minimum Vertical Clearance: 4.55m (14.93ft), Kilometerpoint: 16.490, Lanes on structure: 5, Lanes under structure: 2, Material/Design: Concrete, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 34.4m (112.9ft)
Find on map >> Show street view
Structure Number: 53 1467, Location: 07-LA-005-33.98-LA (Lat: 34.223150, Lng: -118.371736), Route carried "under" structure: Interstate 5, Year Built: 1961, Structure Length: 0. m, Average Daily Traffic: 183,000 (year 2009), Truck Traffic: 9%, Features Intersected: INTERSTATE 5, Facility Carried by Structure: OLINDA STREET POC
Minimum Vertical Clearance: 4.59m (15.06ft), Kilometerpoint: 33.980, Lanes under structure: 8, Material/Design: Concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 21.9m (71.9ft)
Structure Number: 53 1467, Location: 07-LA-005-33.98-LA (Lat: 34.223150, Lng: -118.371736), Route carried "under" structure: Interstate 5, Year Built: 1961, Structure Length: 0. m, Average Daily Traffic: 183,000 (year 2009), Truck Traffic: 9%, Features Intersected: INTERSTATE 5, Facility Carried by Structure: OLINDA STREET POC
Minimum Vertical Clearance: 4.59m (15.06ft), Kilometerpoint: 33.980, Lanes under structure: 8, Material/Design: Concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 21.9m (71.9ft)
Find on map >> Show street view
Structure Number: 53 1471, Location: 07-LA-047-0.86 (Lat: 33.749453, Lng: -118.281228), Route carried "under" structure: County highway , Year Built: 1963, Structure Length: 0. m, Average Daily Traffic: 22,500 (year 1998), Truck Traffic: 2%, Features Intersected: SAN PEDRO TERMINAL ISL, Facility Carried by Structure: STATE ROUTE 47
Minimum Vertical Clearance: 7.06m (23.16ft), Kilometerpoint: 0.000, Lanes on structure: 4, Lanes under structure: 6, Toll: Toll bridge, Material/Design: Steel, Design/Construction: Suspension, Length of Maximum Span: 457.2m (1,500.0ft)
Structure Number: 53 1471, Location: 07-LA-047-0.86 (Lat: 33.749453, Lng: -118.281228), Route carried "under" structure: County highway , Year Built: 1963, Structure Length: 0. m, Average Daily Traffic: 22,500 (year 1998), Truck Traffic: 2%, Features Intersected: SAN PEDRO TERMINAL ISL, Facility Carried by Structure: STATE ROUTE 47
Minimum Vertical Clearance: 7.06m (23.16ft), Kilometerpoint: 0.000, Lanes on structure: 4, Lanes under structure: 6, Toll: Toll bridge, Material/Design: Steel, Design/Construction: Suspension, Length of Maximum Span: 457.2m (1,500.0ft)
Find on map >> Show street view
Structure Number: 53 1471, Location: 07-LA-047-0.86 (Lat: 33.749453, Lng: -118.281228), Route carried "under" structure: County highway , Year Built: 1963, Structure Length: 0. m, Average Daily Traffic: 2,000 (year 1998), Truck Traffic: 5%, Features Intersected: SAN PEDRO TERMINAL ISL, Facility Carried by Structure: STATE ROUTE 47
Minimum Vertical Clearance: 14.86m (48.75ft), Kilometerpoint: 0.000, Lanes on structure: 4, Lanes under structure: 5, Toll: Toll bridge, Material/Design: Steel, Design/Construction: Suspension, Length of Maximum Span: 457.2m (1,500.0ft)
Structure Number: 53 1471, Location: 07-LA-047-0.86 (Lat: 33.749453, Lng: -118.281228), Route carried "under" structure: County highway , Year Built: 1963, Structure Length: 0. m, Average Daily Traffic: 2,000 (year 1998), Truck Traffic: 5%, Features Intersected: SAN PEDRO TERMINAL ISL, Facility Carried by Structure: STATE ROUTE 47
Minimum Vertical Clearance: 14.86m (48.75ft), Kilometerpoint: 0.000, Lanes on structure: 4, Lanes under structure: 5, Toll: Toll bridge, Material/Design: Steel, Design/Construction: Suspension, Length of Maximum Span: 457.2m (1,500.0ft)
Find on map >> Show street view
Structure Number: 53 1471, Location: 07-LA-047-0.86 (Lat: 33.749453, Lng: -118.281228), Route carried "under" structure: County highway , Year Built: 1963, Structure Length: 0. m, Average Daily Traffic: 5,000 (year 2003), Truck Traffic: 40%, Features Intersected: SAN PEDRO TERMINAL ISL, Facility Carried by Structure: STATE ROUTE 47
Minimum Vertical Clearance: 7.62m (25.00ft), Kilometerpoint: 0.000, Lanes on structure: 4, Lanes under structure: 2, Material/Design: Steel, Design/Construction: Suspension, Length of Maximum Span: 457.2m (1,500.0ft)
Structure Number: 53 1471, Location: 07-LA-047-0.86 (Lat: 33.749453, Lng: -118.281228), Route carried "under" structure: County highway , Year Built: 1963, Structure Length: 0. m, Average Daily Traffic: 5,000 (year 2003), Truck Traffic: 40%, Features Intersected: SAN PEDRO TERMINAL ISL, Facility Carried by Structure: STATE ROUTE 47
Minimum Vertical Clearance: 7.62m (25.00ft), Kilometerpoint: 0.000, Lanes on structure: 4, Lanes under structure: 2, Material/Design: Steel, Design/Construction: Suspension, Length of Maximum Span: 457.2m (1,500.0ft)
Find on map >> Show street view
Structure Number: 53 1471, Location: 07-LA-047-0.86 (Lat: 33.749453, Lng: -118.281228), Route carried "under" structure: County highway , Year Built: 1963, Structure Length: 0. m, Average Daily Traffic: 10,000 (year 1998), Truck Traffic: 15%, Features Intersected: SAN PEDRO TERMINAL ISL, Facility Carried by Structure: STATE ROUTE 47
Minimum Vertical Clearance: 7.62m (25.00ft), Kilometerpoint: 0.000, Lanes on structure: 4, Lanes under structure: 4, Toll: Toll bridge, Material/Design: Steel, Design/Construction: Suspension, Length of Maximum Span: 457.2m (1,500.0ft)
Structure Number: 53 1471, Location: 07-LA-047-0.86 (Lat: 33.749453, Lng: -118.281228), Route carried "under" structure: County highway , Year Built: 1963, Structure Length: 0. m, Average Daily Traffic: 10,000 (year 1998), Truck Traffic: 15%, Features Intersected: SAN PEDRO TERMINAL ISL, Facility Carried by Structure: STATE ROUTE 47
Minimum Vertical Clearance: 7.62m (25.00ft), Kilometerpoint: 0.000, Lanes on structure: 4, Lanes under structure: 4, Toll: Toll bridge, Material/Design: Steel, Design/Construction: Suspension, Length of Maximum Span: 457.2m (1,500.0ft)
Find on map >> Show street view
Structure Number: 53 1472, Location: 07-LA-005-35.63-LA (Lat: 34.230397, Lng: -118.397903), Route carried "under" structure: Interstate 5, Year Built: 1963, Structure Length: 0. m, Average Daily Traffic: 187,358 (year 2011), Truck Traffic: 20%, Features Intersected: INTERSTATE 5, Facility Carried by Structure: WICKS STREET POC
Minimum Vertical Clearance: 5.63m (18.47ft), Kilometerpoint: 35.630, Lanes under structure: 9, Material/Design: Concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 24.8m (81.4ft)
Structure Number: 53 1472, Location: 07-LA-005-35.63-LA (Lat: 34.230397, Lng: -118.397903), Route carried "under" structure: Interstate 5, Year Built: 1963, Structure Length: 0. m, Average Daily Traffic: 187,358 (year 2011), Truck Traffic: 20%, Features Intersected: INTERSTATE 5, Facility Carried by Structure: WICKS STREET POC
Minimum Vertical Clearance: 5.63m (18.47ft), Kilometerpoint: 35.630, Lanes under structure: 9, Material/Design: Concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 24.8m (81.4ft)
Find on map >> Show street view
Structure Number: 53 1474, Location: 07-LA-002-14.21-LA (Lat: 34.091261, Lng: -118.258644), Route carried "under" structure: City street L311, Year Built: 1962, Structure Length: 0. m, Average Daily Traffic: 6,000 (year 2011), Truck Traffic: 2%, Features Intersected: GLENDALE BLVD, Facility Carried by Structure: SR 2
Minimum Vertical Clearance: 4.80m (15.75ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 5, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 18.0m (59.1ft)
Structure Number: 53 1474, Location: 07-LA-002-14.21-LA (Lat: 34.091261, Lng: -118.258644), Route carried "under" structure: City street L311, Year Built: 1962, Structure Length: 0. m, Average Daily Traffic: 6,000 (year 2011), Truck Traffic: 2%, Features Intersected: GLENDALE BLVD, Facility Carried by Structure: SR 2
Minimum Vertical Clearance: 4.80m (15.75ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 5, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 18.0m (59.1ft)
Find on map >> Show street view
Structure Number: 53 1485F, Location: 07-LA-010-R9.22-LA (Lat: 34.036311, Lng: -118.371122), Route carried "under" structure: Ramp Interstate 10, Year Built: 1964, Structure Length: 0. m, Average Daily Traffic: 4,115 (year 2004), Truck Traffic: 2%, Features Intersected: FAIRFAX-W10, E10-FAIRFAX
Minimum Vertical Clearance: 4.52m (14.83ft), Kilometerpoint: 9.220, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 21.9m (71.9ft)
Structure Number: 53 1485F, Location: 07-LA-010-R9.22-LA (Lat: 34.036311, Lng: -118.371122), Route carried "under" structure: Ramp Interstate 10, Year Built: 1964, Structure Length: 0. m, Average Daily Traffic: 4,115 (year 2004), Truck Traffic: 2%, Features Intersected: FAIRFAX-W10, E10-FAIRFAX
Minimum Vertical Clearance: 4.52m (14.83ft), Kilometerpoint: 9.220, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 21.9m (71.9ft)
Find on map >> Show street view
Structure Number: 53 1485F, Location: 07-LA-010-R9.22-LA (Lat: 34.036311, Lng: -118.371122), Route carried "under" structure: Ramp Interstate 10, Year Built: 1964, Structure Length: 0. m, Average Daily Traffic: 4,100 (year 2004), Truck Traffic: 1%, Features Intersected: FAIRFAX-W10, E10-FAIRFAX
Minimum Vertical Clearance: 4.90m (16.08ft), Kilometerpoint: 9.220, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 21.9m (71.9ft)
Structure Number: 53 1485F, Location: 07-LA-010-R9.22-LA (Lat: 34.036311, Lng: -118.371122), Route carried "under" structure: Ramp Interstate 10, Year Built: 1964, Structure Length: 0. m, Average Daily Traffic: 4,100 (year 2004), Truck Traffic: 1%, Features Intersected: FAIRFAX-W10, E10-FAIRFAX
Minimum Vertical Clearance: 4.90m (16.08ft), Kilometerpoint: 9.220, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 21.9m (71.9ft)
Find on map >> Show street view
Structure Number: 53 1493S, Location: 07-LA-134-0.01-LA (Lat: 34.153108, Lng: -118.376883), Route carried "under" structure: State highway 170, Year Built: 1959, Structure Length: 0. m, Average Daily Traffic: 190,000 (year 2017), Truck Traffic: 4%, Features Intersected: US 101 NB & SR 170, Facility Carried by Structure: E134-RIVERSIDE OFF
Minimum Vertical Clearance: 6.19m (20.31ft), Kilometerpoint: 14.500, Lanes on structure: 2, Lanes under structure: 7, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 40.4m (132.5ft)
Structure Number: 53 1493S, Location: 07-LA-134-0.01-LA (Lat: 34.153108, Lng: -118.376883), Route carried "under" structure: State highway 170, Year Built: 1959, Structure Length: 0. m, Average Daily Traffic: 190,000 (year 2017), Truck Traffic: 4%, Features Intersected: US 101 NB & SR 170, Facility Carried by Structure: E134-RIVERSIDE OFF
Minimum Vertical Clearance: 6.19m (20.31ft), Kilometerpoint: 14.500, Lanes on structure: 2, Lanes under structure: 7, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 40.4m (132.5ft)
Find on map >> Show street view
Structure Number: 53 1493S, Location: 07-LA-134-0.01-LA (Lat: 34.153108, Lng: -118.376883), Route carried "under" structure: US 101, Year Built: 1959, Structure Length: 0. m, Average Daily Traffic: 190,000 (year 2017), Truck Traffic: 5%, Features Intersected: US 101 NB & SR 170, Facility Carried by Structure: E134-RIVERSIDE OFF
Minimum Vertical Clearance: 4.50m (14.76ft), Kilometerpoint: 11.600, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 40.4m (132.5ft)
Structure Number: 53 1493S, Location: 07-LA-134-0.01-LA (Lat: 34.153108, Lng: -118.376883), Route carried "under" structure: US 101, Year Built: 1959, Structure Length: 0. m, Average Daily Traffic: 190,000 (year 2017), Truck Traffic: 5%, Features Intersected: US 101 NB & SR 170, Facility Carried by Structure: E134-RIVERSIDE OFF
Minimum Vertical Clearance: 4.50m (14.76ft), Kilometerpoint: 11.600, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 40.4m (132.5ft)
Find on map >> Show street view
Structure Number: 53 15, Location: 07-LA-405-46.24-LA (Lat: 34.257131, Lng: -118.471828), Route carried "under" structure: City street L579, Year Built: 1963, Structure Length: 0. m, Average Daily Traffic: 23,828 (year 2011), Truck Traffic: 1%, Features Intersected: DEVONSHIRE STREET, Facility Carried by Structure: INTERSTATE 405
Minimum Vertical Clearance: 4.62m (15.16ft), Kilometerpoint: 0.000, Lanes on structure: 14, Lanes under structure: 6, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 15.5m (50.9ft)
Structure Number: 53 15, Location: 07-LA-405-46.24-LA (Lat: 34.257131, Lng: -118.471828), Route carried "under" structure: City street L579, Year Built: 1963, Structure Length: 0. m, Average Daily Traffic: 23,828 (year 2011), Truck Traffic: 1%, Features Intersected: DEVONSHIRE STREET, Facility Carried by Structure: INTERSTATE 405
Minimum Vertical Clearance: 4.62m (15.16ft), Kilometerpoint: 0.000, Lanes on structure: 14, Lanes under structure: 6, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 15.5m (50.9ft)
Find on map >> Show street view
Structure Number: 53 1501, Location: 07-LA-405-46.74-LA (Lat: 34.264383, Lng: -118.471911), Route carried "under" structure: City street L598, Year Built: 1963, Structure Length: 0. m, Average Daily Traffic: 9,075 (year 2019), Truck Traffic: 1%, Features Intersected: CHATSWORTH STREET, Facility Carried by Structure: INTERSTATE 405
Minimum Vertical Clearance: 4.42m (14.50ft), Kilometerpoint: 0.000, Lanes on structure: 12, Lanes under structure: 4, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 27.4m (89.9ft)
Structure Number: 53 1501, Location: 07-LA-405-46.74-LA (Lat: 34.264383, Lng: -118.471911), Route carried "under" structure: City street L598, Year Built: 1963, Structure Length: 0. m, Average Daily Traffic: 9,075 (year 2019), Truck Traffic: 1%, Features Intersected: CHATSWORTH STREET, Facility Carried by Structure: INTERSTATE 405
Minimum Vertical Clearance: 4.42m (14.50ft), Kilometerpoint: 0.000, Lanes on structure: 12, Lanes under structure: 4, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 27.4m (89.9ft)
Find on map >> Show street view
Structure Number: 53 1524, Location: 07-LA-110-7.20-LA (Lat: 33.834233, Lng: -118.287767), Route carried "under" structure: Interstate 110, Year Built: 1962, Structure Length: 0. m, Average Daily Traffic: 199,500 (year 2015), Truck Traffic: 9%, Features Intersected: INTERSTATE 110, Facility Carried by Structure: PEDESTRIAN WALKWAY
Minimum Vertical Clearance: 5.61m (18.41ft), Kilometerpoint: 7.200, Lanes under structure: 10, Material/Design: Concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 26.5m (86.9ft)
Structure Number: 53 1524, Location: 07-LA-110-7.20-LA (Lat: 33.834233, Lng: -118.287767), Route carried "under" structure: Interstate 110, Year Built: 1962, Structure Length: 0. m, Average Daily Traffic: 199,500 (year 2015), Truck Traffic: 9%, Features Intersected: INTERSTATE 110, Facility Carried by Structure: PEDESTRIAN WALKWAY
Minimum Vertical Clearance: 5.61m (18.41ft), Kilometerpoint: 7.200, Lanes under structure: 10, Material/Design: Concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 26.5m (86.9ft)
Find on map >> Show street view
Structure Number: 53 1548, Location: 07-LA-005-41.55-LA (Lat: 34.289403, Lng: -118.467103), Route carried "under" structure: Interstate 405, Year Built: 1974, Structure Length: 0. m, Average Daily Traffic: 144,864 (year 2011), Truck Traffic: 4%, Features Intersected: ROUTE 405, Facility Carried by Structure: SB I-5 (TRUCK)
Minimum Vertical Clearance: 5.28m (17.32ft), Kilometerpoint: 48.510, Lanes on structure: 2, Lanes under structure: 7, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 54.0m (177.2ft)
Structure Number: 53 1548, Location: 07-LA-005-41.55-LA (Lat: 34.289403, Lng: -118.467103), Route carried "under" structure: Interstate 405, Year Built: 1974, Structure Length: 0. m, Average Daily Traffic: 144,864 (year 2011), Truck Traffic: 4%, Features Intersected: ROUTE 405, Facility Carried by Structure: SB I-5 (TRUCK)
Minimum Vertical Clearance: 5.28m (17.32ft), Kilometerpoint: 48.510, Lanes on structure: 2, Lanes under structure: 7, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 54.0m (177.2ft)
Find on map >> Show street view
Structure Number: 53 1552, Location: 07-LA-010-R6.74-LA (Lat: 34.030597, Lng: -118.411411), Route carried "under" structure: City street , Year Built: 1964, Structure Length: 0. m, Average Daily Traffic: 18,100 (year 2012), Truck Traffic: 2%, Features Intersected: MOTOR AVE, Facility Carried by Structure: INTERSTATE 10
Minimum Vertical Clearance: 6.65m (21.82ft), Kilometerpoint: 0.000, Lanes on structure: 9, Lanes under structure: 3, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 26.5m (86.9ft)
Structure Number: 53 1552, Location: 07-LA-010-R6.74-LA (Lat: 34.030597, Lng: -118.411411), Route carried "under" structure: City street , Year Built: 1964, Structure Length: 0. m, Average Daily Traffic: 18,100 (year 2012), Truck Traffic: 2%, Features Intersected: MOTOR AVE, Facility Carried by Structure: INTERSTATE 10
Minimum Vertical Clearance: 6.65m (21.82ft), Kilometerpoint: 0.000, Lanes on structure: 9, Lanes under structure: 3, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 26.5m (86.9ft)
Find on map >> Show street view
Structure Number: 53 1553S, Location: 07-LA-010-R7.08-LA (Lat: 34.030222, Lng: -118.405556), Route carried "under" structure: Interstate 10, Year Built: 1964, Structure Length: 0. m, Average Daily Traffic: 254,000 (year 2009), Truck Traffic: 4%, Features Intersected: INTERSTATE 10
Minimum Vertical Clearance: 4.55m (14.93ft), Kilometerpoint: 7.080, Lanes on structure: 2, Lanes under structure: 9, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 31.4m (103.0ft)
Structure Number: 53 1553S, Location: 07-LA-010-R7.08-LA (Lat: 34.030222, Lng: -118.405556), Route carried "under" structure: Interstate 10, Year Built: 1964, Structure Length: 0. m, Average Daily Traffic: 254,000 (year 2009), Truck Traffic: 4%, Features Intersected: INTERSTATE 10
Minimum Vertical Clearance: 4.55m (14.93ft), Kilometerpoint: 7.080, Lanes on structure: 2, Lanes under structure: 9, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 31.4m (103.0ft)
Find on map >> Show street view
Structure Number: 53 1554, Location: 07-LA-010-R7.21-LA (Lat: 34.029428, Lng: -118.403661), Route carried "under" structure: City street , Year Built: 1964, Structure Length: 0. m, Average Daily Traffic: 29,281 (year 2007), Truck Traffic: 2%, Features Intersected: NATIONAL BLVD, Facility Carried by Structure: INTERSTATE 10
Minimum Vertical Clearance: 4.57m (14.99ft), Kilometerpoint: 0.000, Lanes on structure: 10, Lanes under structure: 5, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 28.2m (92.5ft)
Structure Number: 53 1554, Location: 07-LA-010-R7.21-LA (Lat: 34.029428, Lng: -118.403661), Route carried "under" structure: City street , Year Built: 1964, Structure Length: 0. m, Average Daily Traffic: 29,281 (year 2007), Truck Traffic: 2%, Features Intersected: NATIONAL BLVD, Facility Carried by Structure: INTERSTATE 10
Minimum Vertical Clearance: 4.57m (14.99ft), Kilometerpoint: 0.000, Lanes on structure: 10, Lanes under structure: 5, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 28.2m (92.5ft)
Find on map >> Show street view
Structure Number: 53 1556, Location: 07-LA-010-R7.83-LA (Lat: 34.029733, Lng: -118.392592), Route carried "under" structure: Ramp Interstate 10, Year Built: 1964, Structure Length: 0. m, Average Daily Traffic: 16,001 (year 2012), Truck Traffic: 5%, Features Intersected: ROBERTSON BL-W10 ON RAMP
Minimum Vertical Clearance: 5.18m (16.99ft), Kilometerpoint: 7.830, Lanes on structure: 9, Lanes under structure: 2, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 23.8m (78.1ft)
Structure Number: 53 1556, Location: 07-LA-010-R7.83-LA (Lat: 34.029733, Lng: -118.392592), Route carried "under" structure: Ramp Interstate 10, Year Built: 1964, Structure Length: 0. m, Average Daily Traffic: 16,001 (year 2012), Truck Traffic: 5%, Features Intersected: ROBERTSON BL-W10 ON RAMP
Minimum Vertical Clearance: 5.18m (16.99ft), Kilometerpoint: 7.830, Lanes on structure: 9, Lanes under structure: 2, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 23.8m (78.1ft)
Find on map >> Show street view
Structure Number: 53 1557, Location: 07-LA-010-R7.92-LA (Lat: 34.030217, Lng: -118.391644), Route carried "under" structure: City street , Year Built: 1964, Structure Length: 0. m, Average Daily Traffic: 22,400 (year 2012), Truck Traffic: 2%, Features Intersected: ROBERTSON BL NATIONAL BL, Facility Carried by Structure: INTERSTATE 10
Minimum Vertical Clearance: 4.93m (16.17ft), Kilometerpoint: 0.000, Lanes on structure: 10, Lanes under structure: 5, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 34.6m (113.5ft)
Structure Number: 53 1557, Location: 07-LA-010-R7.92-LA (Lat: 34.030217, Lng: -118.391644), Route carried "under" structure: City street , Year Built: 1964, Structure Length: 0. m, Average Daily Traffic: 22,400 (year 2012), Truck Traffic: 2%, Features Intersected: ROBERTSON BL NATIONAL BL, Facility Carried by Structure: INTERSTATE 10
Minimum Vertical Clearance: 4.93m (16.17ft), Kilometerpoint: 0.000, Lanes on structure: 10, Lanes under structure: 5, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 34.6m (113.5ft)
Find on map >> Show street view
Structure Number: 53 1557, Location: 07-LA-010-R7.92-LA (Lat: 34.030217, Lng: -118.391644), Route carried "under" structure: City street , Year Built: 1964, Structure Length: 0. m, Average Daily Traffic: 20,700 (year 2012), Truck Traffic: 2%, Features Intersected: ROBERTSON BL NATIONAL BL, Facility Carried by Structure: INTERSTATE 10
Minimum Vertical Clearance: 4.62m (15.16ft), Kilometerpoint: 0.000, Lanes on structure: 10, Lanes under structure: 4, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 34.6m (113.5ft)
Structure Number: 53 1557, Location: 07-LA-010-R7.92-LA (Lat: 34.030217, Lng: -118.391644), Route carried "under" structure: City street , Year Built: 1964, Structure Length: 0. m, Average Daily Traffic: 20,700 (year 2012), Truck Traffic: 2%, Features Intersected: ROBERTSON BL NATIONAL BL, Facility Carried by Structure: INTERSTATE 10
Minimum Vertical Clearance: 4.62m (15.16ft), Kilometerpoint: 0.000, Lanes on structure: 10, Lanes under structure: 4, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 34.6m (113.5ft)
Find on map >> Show street view
Structure Number: 53 1558, Location: 07-LA-010-R8.30-LA (Lat: 34.033669, Lng: -118.385792), Route carried "under" structure: City street , Year Built: 1964, Structure Length: 0. m, Average Daily Traffic: 5,240 (year 2009), Truck Traffic: 2%, Features Intersected: CATTARAUGUS AVE, Facility Carried by Structure: INTERSTATE 10
Minimum Vertical Clearance: 4.62m (15.16ft), Kilometerpoint: 0.000, Lanes on structure: 10, Lanes under structure: 2, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 23.5m (77.1ft)
Structure Number: 53 1558, Location: 07-LA-010-R8.30-LA (Lat: 34.033669, Lng: -118.385792), Route carried "under" structure: City street , Year Built: 1964, Structure Length: 0. m, Average Daily Traffic: 5,240 (year 2009), Truck Traffic: 2%, Features Intersected: CATTARAUGUS AVE, Facility Carried by Structure: INTERSTATE 10
Minimum Vertical Clearance: 4.62m (15.16ft), Kilometerpoint: 0.000, Lanes on structure: 10, Lanes under structure: 2, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 23.5m (77.1ft)
Find on map >> Show street view
Structure Number: 53 1563, Location: 07-LA-010-R13.80-LA (Lat: 34.036656, Lng: -118.291886), Route carried "under" structure: City street , Year Built: 1962, Structure Length: 0. m, Average Daily Traffic: 44,004 (year 2004), Truck Traffic: 2%, Features Intersected: VERMONT AVENUE, Facility Carried by Structure: INTERSTATE 10
Minimum Vertical Clearance: 5.03m (16.50ft), Kilometerpoint: 0.000, Lanes on structure: 14, Lanes under structure: 7, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 30.9m (101.4ft)
Structure Number: 53 1563, Location: 07-LA-010-R13.80-LA (Lat: 34.036656, Lng: -118.291886), Route carried "under" structure: City street , Year Built: 1962, Structure Length: 0. m, Average Daily Traffic: 44,004 (year 2004), Truck Traffic: 2%, Features Intersected: VERMONT AVENUE, Facility Carried by Structure: INTERSTATE 10
Minimum Vertical Clearance: 5.03m (16.50ft), Kilometerpoint: 0.000, Lanes on structure: 14, Lanes under structure: 7, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 30.9m (101.4ft)
Find on map >> Show street view
Structure Number: 53 1565, Location: 07-LA-010-R13.30-LA (Lat: 34.036758, Lng: -118.300594), Route carried "under" structure: City street , Year Built: 1962, Structure Length: 0. m, Average Daily Traffic: 33,600 (year 2004), Truck Traffic: 2%, Features Intersected: NORMANDIE AVE, Facility Carried by Structure: INTERSTATE 10
Minimum Vertical Clearance: 4.50m (14.76ft), Kilometerpoint: 0.000, Lanes on structure: 12, Lanes under structure: 6, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 30.9m (101.4ft)
Structure Number: 53 1565, Location: 07-LA-010-R13.30-LA (Lat: 34.036758, Lng: -118.300594), Route carried "under" structure: City street , Year Built: 1962, Structure Length: 0. m, Average Daily Traffic: 33,600 (year 2004), Truck Traffic: 2%, Features Intersected: NORMANDIE AVE, Facility Carried by Structure: INTERSTATE 10
Minimum Vertical Clearance: 4.50m (14.76ft), Kilometerpoint: 0.000, Lanes on structure: 12, Lanes under structure: 6, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 30.9m (101.4ft)
Find on map >> Show street view
Structure Number: 53 1566, Location: 07-LA-010-R12.82-LA (Lat: 34.036689, Lng: -118.308867), Route carried "under" structure: Ramp Interstate 10, Year Built: 1962, Structure Length: 0. m, Average Daily Traffic: 2,000 (year 2004), Truck Traffic: 2%, Features Intersected: INTERSTATE 10 AND RAMPS, Facility Carried by Structure: WESTERN AVE
Minimum Vertical Clearance: 4.98m (16.34ft), Kilometerpoint: 12.820, Lanes on structure: 7, Lanes under structure: 2, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 27.4m (89.9ft)
Structure Number: 53 1566, Location: 07-LA-010-R12.82-LA (Lat: 34.036689, Lng: -118.308867), Route carried "under" structure: Ramp Interstate 10, Year Built: 1962, Structure Length: 0. m, Average Daily Traffic: 2,000 (year 2004), Truck Traffic: 2%, Features Intersected: INTERSTATE 10 AND RAMPS, Facility Carried by Structure: WESTERN AVE
Minimum Vertical Clearance: 4.98m (16.34ft), Kilometerpoint: 12.820, Lanes on structure: 7, Lanes under structure: 2, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 27.4m (89.9ft)
Find on map >> Show street view
Structure Number: 53 1566, Location: 07-LA-010-R12.82-LA (Lat: 34.036689, Lng: -118.308867), Route carried "under" structure: Ramp Interstate 10, Year Built: 1962, Structure Length: 0. m, Average Daily Traffic: 2,000 (year 2004), Truck Traffic: 2%, Features Intersected: INTERSTATE 10 AND RAMPS, Facility Carried by Structure: WESTERN AVE
Minimum Vertical Clearance: 5.21m (17.09ft), Kilometerpoint: 12.820, Lanes on structure: 7, Lanes under structure: 2, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 27.4m (89.9ft)
Structure Number: 53 1566, Location: 07-LA-010-R12.82-LA (Lat: 34.036689, Lng: -118.308867), Route carried "under" structure: Ramp Interstate 10, Year Built: 1962, Structure Length: 0. m, Average Daily Traffic: 2,000 (year 2004), Truck Traffic: 2%, Features Intersected: INTERSTATE 10 AND RAMPS, Facility Carried by Structure: WESTERN AVE
Minimum Vertical Clearance: 5.21m (17.09ft), Kilometerpoint: 12.820, Lanes on structure: 7, Lanes under structure: 2, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 27.4m (89.9ft)
Find on map >> Show street view
Structure Number: 53 1566, Location: 07-LA-010-R12.82-LA (Lat: 34.036689, Lng: -118.308867), Route carried "under" structure: Interstate 10, Year Built: 1962, Structure Length: 0. m, Average Daily Traffic: 287,000 (year 2009), Truck Traffic: 4%, Features Intersected: INTERSTATE 10 AND RAMPS, Facility Carried by Structure: WESTERN AVE
Minimum Vertical Clearance: 4.72m (15.49ft), Kilometerpoint: 12.820, Lanes on structure: 7, Lanes under structure: 9, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 27.4m (89.9ft)
Structure Number: 53 1566, Location: 07-LA-010-R12.82-LA (Lat: 34.036689, Lng: -118.308867), Route carried "under" structure: Interstate 10, Year Built: 1962, Structure Length: 0. m, Average Daily Traffic: 287,000 (year 2009), Truck Traffic: 4%, Features Intersected: INTERSTATE 10 AND RAMPS, Facility Carried by Structure: WESTERN AVE
Minimum Vertical Clearance: 4.72m (15.49ft), Kilometerpoint: 12.820, Lanes on structure: 7, Lanes under structure: 9, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 27.4m (89.9ft)
Find on map >> Show street view
Structure Number: 53 1567, Location: 07-LA-010-R12.57-LA (Lat: 34.036589, Lng: -118.313281), Route carried "under" structure: Interstate 10, Year Built: 1962, Structure Length: 0. m, Average Daily Traffic: 287,000 (year 2009), Truck Traffic: 4%, Features Intersected: INTERSTATE 10 AND RAMPS, Facility Carried by Structure: GRAMERCY PLACE
Minimum Vertical Clearance: 4.83m (15.85ft), Kilometerpoint: 12.570, Lanes on structure: 2, Lanes under structure: 8, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 22.1m (72.5ft)
Structure Number: 53 1567, Location: 07-LA-010-R12.57-LA (Lat: 34.036589, Lng: -118.313281), Route carried "under" structure: Interstate 10, Year Built: 1962, Structure Length: 0. m, Average Daily Traffic: 287,000 (year 2009), Truck Traffic: 4%, Features Intersected: INTERSTATE 10 AND RAMPS, Facility Carried by Structure: GRAMERCY PLACE
Minimum Vertical Clearance: 4.83m (15.85ft), Kilometerpoint: 12.570, Lanes on structure: 2, Lanes under structure: 8, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 22.1m (72.5ft)
Find on map >> Show street view
Structure Number: 53 1567, Location: 07-LA-010-R12.57-LA (Lat: 34.036589, Lng: -118.313281), Route carried "under" structure: Ramp Interstate 10, Year Built: 1962, Structure Length: 0. m, Average Daily Traffic: 2,000 (year 2004), Truck Traffic: 2%, Features Intersected: INTERSTATE 10 AND RAMPS, Facility Carried by Structure: GRAMERCY PLACE
Minimum Vertical Clearance: 5.23m (17.16ft), Kilometerpoint: 12.570, Lanes on structure: 2, Lanes under structure: 3, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 22.1m (72.5ft)
Structure Number: 53 1567, Location: 07-LA-010-R12.57-LA (Lat: 34.036589, Lng: -118.313281), Route carried "under" structure: Ramp Interstate 10, Year Built: 1962, Structure Length: 0. m, Average Daily Traffic: 2,000 (year 2004), Truck Traffic: 2%, Features Intersected: INTERSTATE 10 AND RAMPS, Facility Carried by Structure: GRAMERCY PLACE
Minimum Vertical Clearance: 5.23m (17.16ft), Kilometerpoint: 12.570, Lanes on structure: 2, Lanes under structure: 3, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 22.1m (72.5ft)
Find on map >> Show street view
Structure Number: 53 1567, Location: 07-LA-010-R12.57-LA (Lat: 34.036589, Lng: -118.313281), Route carried "under" structure: Ramp Interstate 10, Year Built: 1962, Structure Length: 0. m, Average Daily Traffic: 2,000 (year 2004), Truck Traffic: 2%, Features Intersected: INTERSTATE 10 AND RAMPS, Facility Carried by Structure: GRAMERCY PLACE
Minimum Vertical Clearance: 5.13m (16.83ft), Kilometerpoint: 12.570, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 22.1m (72.5ft)
Structure Number: 53 1567, Location: 07-LA-010-R12.57-LA (Lat: 34.036589, Lng: -118.313281), Route carried "under" structure: Ramp Interstate 10, Year Built: 1962, Structure Length: 0. m, Average Daily Traffic: 2,000 (year 2004), Truck Traffic: 2%, Features Intersected: INTERSTATE 10 AND RAMPS, Facility Carried by Structure: GRAMERCY PLACE
Minimum Vertical Clearance: 5.13m (16.83ft), Kilometerpoint: 12.570, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 22.1m (72.5ft)
Find on map >> Show street view
Structure Number: 53 1568, Location: 07-LA-010-R12.32-LA (Lat: 34.036994, Lng: -118.317833), Route carried "under" structure: Interstate 10, Year Built: 1962, Structure Length: 0. m, Average Daily Traffic: 287,000 (year 2009), Truck Traffic: 4%, Features Intersected: INTERSTATE 10, Facility Carried by Structure: ARLINGTON AVE
Minimum Vertical Clearance: 5.69m (18.67ft), Kilometerpoint: 12.320, Lanes on structure: 6, Lanes under structure: 11, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 23.5m (77.1ft)
Structure Number: 53 1568, Location: 07-LA-010-R12.32-LA (Lat: 34.036994, Lng: -118.317833), Route carried "under" structure: Interstate 10, Year Built: 1962, Structure Length: 0. m, Average Daily Traffic: 287,000 (year 2009), Truck Traffic: 4%, Features Intersected: INTERSTATE 10, Facility Carried by Structure: ARLINGTON AVE
Minimum Vertical Clearance: 5.69m (18.67ft), Kilometerpoint: 12.320, Lanes on structure: 6, Lanes under structure: 11, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 23.5m (77.1ft)
Find on map >> Show street view
Structure Number: 53 1569, Location: 07-LA-010-R11.97-LA (Lat: 34.035475, Lng: -118.323572), Route carried "under" structure: Interstate 10, Year Built: 1962, Structure Length: 0. m, Average Daily Traffic: 287,000 (year 2009), Truck Traffic: 4%, Features Intersected: INTERSTATE 10, Facility Carried by Structure: SIXTH AVE
Minimum Vertical Clearance: 4.88m (16.01ft), Kilometerpoint: 11.970, Lanes on structure: 2, Lanes under structure: 12, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 25.3m (83.0ft)
Structure Number: 53 1569, Location: 07-LA-010-R11.97-LA (Lat: 34.035475, Lng: -118.323572), Route carried "under" structure: Interstate 10, Year Built: 1962, Structure Length: 0. m, Average Daily Traffic: 287,000 (year 2009), Truck Traffic: 4%, Features Intersected: INTERSTATE 10, Facility Carried by Structure: SIXTH AVE
Minimum Vertical Clearance: 4.88m (16.01ft), Kilometerpoint: 11.970, Lanes on structure: 2, Lanes under structure: 12, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 25.3m (83.0ft)
Find on map >> Show street view
Structure Number: 53 157, Location: 07-LA-010-R11.70-LA (Lat: 34.034978, Lng: -118.328358), Route carried "under" structure: Interstate 10, Year Built: 1962, Structure Length: 0. m, Average Daily Traffic: 287,000 (year 2009), Truck Traffic: 4%, Features Intersected: INTERSTATE 10, Facility Carried by Structure: TENTH AVE
Minimum Vertical Clearance: 7.92m (25.98ft), Kilometerpoint: 11.700, Lanes on structure: 2, Lanes under structure: 12, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 25.1m (82.3ft)
Structure Number: 53 157, Location: 07-LA-010-R11.70-LA (Lat: 34.034978, Lng: -118.328358), Route carried "under" structure: Interstate 10, Year Built: 1962, Structure Length: 0. m, Average Daily Traffic: 287,000 (year 2009), Truck Traffic: 4%, Features Intersected: INTERSTATE 10, Facility Carried by Structure: TENTH AVE
Minimum Vertical Clearance: 7.92m (25.98ft), Kilometerpoint: 11.700, Lanes on structure: 2, Lanes under structure: 12, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 25.1m (82.3ft)
Find on map >> Show street view
Structure Number: 53 1571, Location: 07-LA-010-R11.39-LA (Lat: 34.035386, Lng: -118.333744), Route carried "under" structure: Interstate 10, Year Built: 1962, Structure Length: 0. m, Average Daily Traffic: 273,000 (year 2009), Features Intersected: INTERSTATE 10, Facility Carried by Structure: CRENSHAW BLVD
Minimum Vertical Clearance: 4.67m (15.32ft), Kilometerpoint: 11.390, Lanes on structure: 8, Lanes under structure: 10, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 25.0m (82.0ft)
Structure Number: 53 1571, Location: 07-LA-010-R11.39-LA (Lat: 34.035386, Lng: -118.333744), Route carried "under" structure: Interstate 10, Year Built: 1962, Structure Length: 0. m, Average Daily Traffic: 273,000 (year 2009), Features Intersected: INTERSTATE 10, Facility Carried by Structure: CRENSHAW BLVD
Minimum Vertical Clearance: 4.67m (15.32ft), Kilometerpoint: 11.390, Lanes on structure: 8, Lanes under structure: 10, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 25.0m (82.0ft)
Find on map >> Show street view
Structure Number: 53 1572, Location: 07-LA-010-R11.03-LA (Lat: 34.034442, Lng: -118.340150), Route carried "under" structure: Interstate 10, Year Built: 1962, Structure Length: 0. m, Average Daily Traffic: 273,000 (year 2009), Truck Traffic: 4%, Features Intersected: INTERSTATE 10, Facility Carried by Structure: WEST BLVD
Minimum Vertical Clearance: 4.52m (14.83ft), Kilometerpoint: 11.030, Lanes on structure: 2, Lanes under structure: 10, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 31.1m (102.0ft)
Structure Number: 53 1572, Location: 07-LA-010-R11.03-LA (Lat: 34.034442, Lng: -118.340150), Route carried "under" structure: Interstate 10, Year Built: 1962, Structure Length: 0. m, Average Daily Traffic: 273,000 (year 2009), Truck Traffic: 4%, Features Intersected: INTERSTATE 10, Facility Carried by Structure: WEST BLVD
Minimum Vertical Clearance: 4.52m (14.83ft), Kilometerpoint: 11.030, Lanes on structure: 2, Lanes under structure: 10, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 31.1m (102.0ft)
Find on map >> Show street view
Structure Number: 53 1579, Location: 07-LA-010-R9.12-LA (Lat: 34.035850, Lng: -118.373206), Route carried "under" structure: Ramp Interstate 10, Year Built: 1964, Structure Length: 0. m, Average Daily Traffic: 10,700 (year 2009), Truck Traffic: 1%, Features Intersected: BALLONA CRK, FAIRFAX OFF
Minimum Vertical Clearance: 4.75m (15.58ft), Kilometerpoint: 9.120, Lanes on structure: 8, Lanes under structure: 2, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 31.7m (104.0ft)
Structure Number: 53 1579, Location: 07-LA-010-R9.12-LA (Lat: 34.035850, Lng: -118.373206), Route carried "under" structure: Ramp Interstate 10, Year Built: 1964, Structure Length: 0. m, Average Daily Traffic: 10,700 (year 2009), Truck Traffic: 1%, Features Intersected: BALLONA CRK, FAIRFAX OFF
Minimum Vertical Clearance: 4.75m (15.58ft), Kilometerpoint: 9.120, Lanes on structure: 8, Lanes under structure: 2, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 31.7m (104.0ft)
Find on map >> Show street view
Structure Number: 53 1582, Location: 07-LA-010-R9.74-LA (Lat: 34.033714, Lng: -118.362533), Route carried "under" structure: City street , Year Built: 1964, Structure Length: 0. m, Average Daily Traffic: 15,300 (year 2004), Truck Traffic: 2%, Features Intersected: HAUSER BLVD, Facility Carried by Structure: INTERSTATE 10
Minimum Vertical Clearance: 4.88m (16.01ft), Kilometerpoint: 0.000, Lanes on structure: 10, Lanes under structure: 2, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 26.7m (87.6ft)
Structure Number: 53 1582, Location: 07-LA-010-R9.74-LA (Lat: 34.033714, Lng: -118.362533), Route carried "under" structure: City street , Year Built: 1964, Structure Length: 0. m, Average Daily Traffic: 15,300 (year 2004), Truck Traffic: 2%, Features Intersected: HAUSER BLVD, Facility Carried by Structure: INTERSTATE 10
Minimum Vertical Clearance: 4.88m (16.01ft), Kilometerpoint: 0.000, Lanes on structure: 10, Lanes under structure: 2, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 26.7m (87.6ft)
Find on map >> Show street view
Structure Number: 53 1584, Location: 07-LA-010-R10.12-LA (Lat: 34.033817, Lng: -118.355961), Route carried "under" structure: City street , Year Built: 1964, Structure Length: 0. m, Average Daily Traffic: 20,000 (year 2004), Truck Traffic: 2%, Features Intersected: REDONDO BLVD, Facility Carried by Structure: INTERSTATE 10
Minimum Vertical Clearance: 4.75m (15.58ft), Kilometerpoint: 0.000, Lanes on structure: 10, Lanes under structure: 2, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 20.4m (66.9ft)
Structure Number: 53 1584, Location: 07-LA-010-R10.12-LA (Lat: 34.033817, Lng: -118.355961), Route carried "under" structure: City street , Year Built: 1964, Structure Length: 0. m, Average Daily Traffic: 20,000 (year 2004), Truck Traffic: 2%, Features Intersected: REDONDO BLVD, Facility Carried by Structure: INTERSTATE 10
Minimum Vertical Clearance: 4.75m (15.58ft), Kilometerpoint: 0.000, Lanes on structure: 10, Lanes under structure: 2, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 20.4m (66.9ft)
Find on map >> Show street view
Structure Number: 53 1586, Location: 07-LA-010-R10.43-LA (Lat: 34.033972, Lng: -118.350567), Route carried "under" structure: City street , Year Built: 1964, Structure Length: 0. m, Average Daily Traffic: 48,300 (year 2004), Truck Traffic: 2%, Features Intersected: LA BREA AVE, Facility Carried by Structure: INTERSTATE 10
Minimum Vertical Clearance: 5.38m (17.65ft), Kilometerpoint: 0.000, Lanes on structure: 12, Lanes under structure: 8, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 20.7m (67.9ft)
Structure Number: 53 1586, Location: 07-LA-010-R10.43-LA (Lat: 34.033972, Lng: -118.350567), Route carried "under" structure: City street , Year Built: 1964, Structure Length: 0. m, Average Daily Traffic: 48,300 (year 2004), Truck Traffic: 2%, Features Intersected: LA BREA AVE, Facility Carried by Structure: INTERSTATE 10
Minimum Vertical Clearance: 5.38m (17.65ft), Kilometerpoint: 0.000, Lanes on structure: 12, Lanes under structure: 8, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 20.7m (67.9ft)
Find on map >> Show street view
Structure Number: 53 1588, Location: 07-LA-010-R11.17-LA (Lat: 34.035278, Lng: -118.337500), Route carried "under" structure: Interstate 10, Year Built: 1964, Structure Length: 0. m, Average Daily Traffic: 273,000 (year 2009), Features Intersected: INTERSTATE 10, Facility Carried by Structure: PEDESTRIAN WALKWAY
Minimum Vertical Clearance: 5.49m (18.01ft), Kilometerpoint: 11.170, Lanes under structure: 12, Material/Design: Concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 27.4m (89.9ft)
Structure Number: 53 1588, Location: 07-LA-010-R11.17-LA (Lat: 34.035278, Lng: -118.337500), Route carried "under" structure: Interstate 10, Year Built: 1964, Structure Length: 0. m, Average Daily Traffic: 273,000 (year 2009), Features Intersected: INTERSTATE 10, Facility Carried by Structure: PEDESTRIAN WALKWAY
Minimum Vertical Clearance: 5.49m (18.01ft), Kilometerpoint: 11.170, Lanes under structure: 12, Material/Design: Concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 27.4m (89.9ft)
Find on map >> Show street view
Structure Number: 53 1589, Location: 07-LA-010-R11.84-LA (Lat: 34.035789, Lng: -118.326069), Route carried "under" structure: Interstate 10, Year Built: 1964, Structure Length: 0. m, Average Daily Traffic: 287,000 (year 2009), Truck Traffic: 4%, Features Intersected: INTERSTATE 10, Facility Carried by Structure: PEDESTRIAN WALKWAY
Minimum Vertical Clearance: 6.93m (22.74ft), Kilometerpoint: 11.840, Lanes under structure: 12, Material/Design: Concrete, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 25.3m (83.0ft)
Structure Number: 53 1589, Location: 07-LA-010-R11.84-LA (Lat: 34.035789, Lng: -118.326069), Route carried "under" structure: Interstate 10, Year Built: 1964, Structure Length: 0. m, Average Daily Traffic: 287,000 (year 2009), Truck Traffic: 4%, Features Intersected: INTERSTATE 10, Facility Carried by Structure: PEDESTRIAN WALKWAY
Minimum Vertical Clearance: 6.93m (22.74ft), Kilometerpoint: 11.840, Lanes under structure: 12, Material/Design: Concrete, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 25.3m (83.0ft)
Find on map >> Show street view
Structure Number: 53 159, Location: 07-LA-010-R12.10-LA (Lat: 34.036506, Lng: -118.321422), Route carried "under" structure: Interstate 10, Year Built: 1964, Structure Length: 0. m, Average Daily Traffic: 287,000 (year 2009), Truck Traffic: 4%, Features Intersected: INTERSTATE 10, Facility Carried by Structure: PEDESTRIAN WALKWAY
Minimum Vertical Clearance: 7.01m (23.00ft), Kilometerpoint: 12.100, Lanes under structure: 12, Material/Design: Concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 25.3m (83.0ft)
Structure Number: 53 159, Location: 07-LA-010-R12.10-LA (Lat: 34.036506, Lng: -118.321422), Route carried "under" structure: Interstate 10, Year Built: 1964, Structure Length: 0. m, Average Daily Traffic: 287,000 (year 2009), Truck Traffic: 4%, Features Intersected: INTERSTATE 10, Facility Carried by Structure: PEDESTRIAN WALKWAY
Minimum Vertical Clearance: 7.01m (23.00ft), Kilometerpoint: 12.100, Lanes under structure: 12, Material/Design: Concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 25.3m (83.0ft)
Find on map >> Show street view
Structure Number: 53 1604, Location: 07-LA-010-R4.51-LA (Lat: 34.027981, Lng: -118.449369), Route carried "under" structure: City street , Year Built: 1963, Structure Length: 0. m, Average Daily Traffic: 46,740 (year 2010), Truck Traffic: 1%, Features Intersected: BUNDY DRIVE, Facility Carried by Structure: INTERSTATE 10
Minimum Vertical Clearance: 4.57m (14.99ft), Kilometerpoint: 0.000, Lanes on structure: 10, Lanes under structure: 5, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 27.6m (90.6ft)
Structure Number: 53 1604, Location: 07-LA-010-R4.51-LA (Lat: 34.027981, Lng: -118.449369), Route carried "under" structure: City street , Year Built: 1963, Structure Length: 0. m, Average Daily Traffic: 46,740 (year 2010), Truck Traffic: 1%, Features Intersected: BUNDY DRIVE, Facility Carried by Structure: INTERSTATE 10
Minimum Vertical Clearance: 4.57m (14.99ft), Kilometerpoint: 0.000, Lanes on structure: 10, Lanes under structure: 5, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 27.6m (90.6ft)
Find on map >> Show street view
Structure Number: 53 1605, Location: 07-LA-010-R4.82-LA (Lat: 34.029400, Lng: -118.444264), Route carried "under" structure: City street , Year Built: 1963, Structure Length: 0. m, Average Daily Traffic: 20,290 (year 2010), Truck Traffic: 2%, Features Intersected: BARRINGTON AVE, Facility Carried by Structure: INTERSTATE 10
Minimum Vertical Clearance: 4.66m (15.29ft), Kilometerpoint: 0.000, Lanes on structure: 10, Lanes under structure: 4, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 27.9m (91.5ft)
Structure Number: 53 1605, Location: 07-LA-010-R4.82-LA (Lat: 34.029400, Lng: -118.444264), Route carried "under" structure: City street , Year Built: 1963, Structure Length: 0. m, Average Daily Traffic: 20,290 (year 2010), Truck Traffic: 2%, Features Intersected: BARRINGTON AVE, Facility Carried by Structure: INTERSTATE 10
Minimum Vertical Clearance: 4.66m (15.29ft), Kilometerpoint: 0.000, Lanes on structure: 10, Lanes under structure: 4, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 27.9m (91.5ft)
Find on map >> Show street view
Structure Number: 53 1615, Location: 07-LA-010-R6.31-LA (Lat: 34.031500, Lng: -118.419167), Route carried "under" structure: Interstate 10, Year Built: 1963, Structure Length: 0. m, Average Daily Traffic: 258,000 (year 2010), Truck Traffic: 4%, Features Intersected: ROUTE 10, Facility Carried by Structure: NATIONAL BLVD
Minimum Vertical Clearance: 4.52m (14.83ft), Kilometerpoint: 6.310, Lanes on structure: 4, Lanes under structure: 10, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 45.7m (149.9ft)
Structure Number: 53 1615, Location: 07-LA-010-R6.31-LA (Lat: 34.031500, Lng: -118.419167), Route carried "under" structure: Interstate 10, Year Built: 1963, Structure Length: 0. m, Average Daily Traffic: 258,000 (year 2010), Truck Traffic: 4%, Features Intersected: ROUTE 10, Facility Carried by Structure: NATIONAL BLVD
Minimum Vertical Clearance: 4.52m (14.83ft), Kilometerpoint: 6.310, Lanes on structure: 4, Lanes under structure: 10, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 45.7m (149.9ft)
Find on map >> Show street view
Structure Number: 53 1616, Location: 07-LA-010-R6.40-LA (Lat: 34.031456, Lng: -118.416633), Route carried "under" structure: Ramp Interstate 10, Year Built: 1964, Structure Length: 0. m, Average Daily Traffic: 2,700 (year 2009), Truck Traffic: 2%, Features Intersected: INTERSTATE 10, RAMPS, Facility Carried by Structure: OVERLAND AVE
Minimum Vertical Clearance: 4.62m (15.16ft), Kilometerpoint: 6.400, Lanes on structure: 8, Lanes under structure: 1, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 31.4m (103.0ft)
Structure Number: 53 1616, Location: 07-LA-010-R6.40-LA (Lat: 34.031456, Lng: -118.416633), Route carried "under" structure: Ramp Interstate 10, Year Built: 1964, Structure Length: 0. m, Average Daily Traffic: 2,700 (year 2009), Truck Traffic: 2%, Features Intersected: INTERSTATE 10, RAMPS, Facility Carried by Structure: OVERLAND AVE
Minimum Vertical Clearance: 4.62m (15.16ft), Kilometerpoint: 6.400, Lanes on structure: 8, Lanes under structure: 1, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 31.4m (103.0ft)
Find on map >> Show street view
Structure Number: 53 1616, Location: 07-LA-010-R6.40-LA (Lat: 34.031456, Lng: -118.416633), Route carried "under" structure: Interstate 10, Year Built: 1964, Structure Length: 0. m, Average Daily Traffic: 258,000 (year 2009), Truck Traffic: 4%, Features Intersected: INTERSTATE 10, RAMPS, Facility Carried by Structure: OVERLAND AVE
Minimum Vertical Clearance: 4.57m (14.99ft), Kilometerpoint: 6.400, Lanes on structure: 8, Lanes under structure: 9, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 31.4m (103.0ft)
Structure Number: 53 1616, Location: 07-LA-010-R6.40-LA (Lat: 34.031456, Lng: -118.416633), Route carried "under" structure: Interstate 10, Year Built: 1964, Structure Length: 0. m, Average Daily Traffic: 258,000 (year 2009), Truck Traffic: 4%, Features Intersected: INTERSTATE 10, RAMPS, Facility Carried by Structure: OVERLAND AVE
Minimum Vertical Clearance: 4.57m (14.99ft), Kilometerpoint: 6.400, Lanes on structure: 8, Lanes under structure: 9, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 31.4m (103.0ft)
Find on map >> Show street view
Structure Number: 53 1623, Location: 07-LA-010-R5.56-LA (Lat: 34.031389, Lng: -118.431517), Route carried "under" structure: City street , Year Built: 1963, Structure Length: 0. m, Average Daily Traffic: 32,000 (year 2010), Truck Traffic: 2%, Features Intersected: SEPULVEDA BLVD, Facility Carried by Structure: INTERSTATE 10
Minimum Vertical Clearance: 6.65m (21.82ft), Kilometerpoint: 0.000, Lanes on structure: 8, Lanes under structure: 4, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 34.4m (112.9ft)
Structure Number: 53 1623, Location: 07-LA-010-R5.56-LA (Lat: 34.031389, Lng: -118.431517), Route carried "under" structure: City street , Year Built: 1963, Structure Length: 0. m, Average Daily Traffic: 32,000 (year 2010), Truck Traffic: 2%, Features Intersected: SEPULVEDA BLVD, Facility Carried by Structure: INTERSTATE 10
Minimum Vertical Clearance: 6.65m (21.82ft), Kilometerpoint: 0.000, Lanes on structure: 8, Lanes under structure: 4, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 34.4m (112.9ft)
Find on map >> Show street view
Structure Number: 53 1627G, Location: 07-LA-010-R5.28-LA (Lat: 34.030250, Lng: -118.437919), Route carried "under" structure: Ramp Interstate 405, Year Built: 1963, Structure Length: 0. m, Average Daily Traffic: 52,000 (year 2010), Truck Traffic: 2%, Features Intersected: 10, 405, STS, METRO RR
Minimum Vertical Clearance: 5.49m (18.01ft), Kilometerpoint: 29.600, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 55.0m (180.4ft)
Structure Number: 53 1627G, Location: 07-LA-010-R5.28-LA (Lat: 34.030250, Lng: -118.437919), Route carried "under" structure: Ramp Interstate 405, Year Built: 1963, Structure Length: 0. m, Average Daily Traffic: 52,000 (year 2010), Truck Traffic: 2%, Features Intersected: 10, 405, STS, METRO RR
Minimum Vertical Clearance: 5.49m (18.01ft), Kilometerpoint: 29.600, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 55.0m (180.4ft)
Find on map >> Show street view
Structure Number: 53 1627G, Location: 07-LA-010-R5.28-LA (Lat: 34.030250, Lng: -118.437919), Route carried "under" structure: City street , Year Built: 1963, Structure Length: 0. m, Average Daily Traffic: 1,800 (year 2010), Truck Traffic: 2%, Features Intersected: 10, 405, STS, METRO RR, Facility Carried by Structure: E10-N405 CONN
Minimum Vertical Clearance: 9.17m (30.09ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 55.0m (180.4ft)
Structure Number: 53 1627G, Location: 07-LA-010-R5.28-LA (Lat: 34.030250, Lng: -118.437919), Route carried "under" structure: City street , Year Built: 1963, Structure Length: 0. m, Average Daily Traffic: 1,800 (year 2010), Truck Traffic: 2%, Features Intersected: 10, 405, STS, METRO RR, Facility Carried by Structure: E10-N405 CONN
Minimum Vertical Clearance: 9.17m (30.09ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 55.0m (180.4ft)
Find on map >> Show street view
Structure Number: 53 1627G, Location: 07-LA-010-R5.28-LA (Lat: 34.030250, Lng: -118.437919), Route carried "under" structure: Ramp Interstate 405, Year Built: 1963, Structure Length: 0. m, Average Daily Traffic: 5,300 (year 2010), Truck Traffic: 2%, Features Intersected: 10, 405, STS, METRO RR
Minimum Vertical Clearance: 5.54m (18.18ft), Kilometerpoint: 29.630, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 55.0m (180.4ft)
Structure Number: 53 1627G, Location: 07-LA-010-R5.28-LA (Lat: 34.030250, Lng: -118.437919), Route carried "under" structure: Ramp Interstate 405, Year Built: 1963, Structure Length: 0. m, Average Daily Traffic: 5,300 (year 2010), Truck Traffic: 2%, Features Intersected: 10, 405, STS, METRO RR
Minimum Vertical Clearance: 5.54m (18.18ft), Kilometerpoint: 29.630, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 55.0m (180.4ft)
Find on map >> Show street view
Structure Number: 53 1627G, Location: 07-LA-010-R5.28-LA (Lat: 34.030250, Lng: -118.437919), Route carried "under" structure: Interstate 405, Year Built: 1963, Structure Length: 0. m, Average Daily Traffic: 268,000 (year 2010), Truck Traffic: 5%, Features Intersected: 10, 405, STS, METRO RR
Minimum Vertical Clearance: 5.46m (17.91ft), Kilometerpoint: 29.710, Lanes on structure: 2, Lanes under structure: 11, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 55.0m (180.4ft)
Structure Number: 53 1627G, Location: 07-LA-010-R5.28-LA (Lat: 34.030250, Lng: -118.437919), Route carried "under" structure: Interstate 405, Year Built: 1963, Structure Length: 0. m, Average Daily Traffic: 268,000 (year 2010), Truck Traffic: 5%, Features Intersected: 10, 405, STS, METRO RR
Minimum Vertical Clearance: 5.46m (17.91ft), Kilometerpoint: 29.710, Lanes on structure: 2, Lanes under structure: 11, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 55.0m (180.4ft)
Find on map >> Show street view
Structure Number: 53 1627G, Location: 07-LA-010-R5.28-LA (Lat: 34.030250, Lng: -118.437919), Route carried "under" structure: City street , Year Built: 1963, Structure Length: 0. m, Average Daily Traffic: 43,550 (year 2010), Truck Traffic: 1%, Features Intersected: 10, 405, STS, METRO RR, Facility Carried by Structure: E10-N405 CONN
Minimum Vertical Clearance: 7.13m (23.39ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 7, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 55.0m (180.4ft)
Structure Number: 53 1627G, Location: 07-LA-010-R5.28-LA (Lat: 34.030250, Lng: -118.437919), Route carried "under" structure: City street , Year Built: 1963, Structure Length: 0. m, Average Daily Traffic: 43,550 (year 2010), Truck Traffic: 1%, Features Intersected: 10, 405, STS, METRO RR, Facility Carried by Structure: E10-N405 CONN
Minimum Vertical Clearance: 7.13m (23.39ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 7, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 55.0m (180.4ft)
Find on map >> Show street view
Structure Number: 53 1627G, Location: 07-LA-010-R5.28-LA (Lat: 34.030250, Lng: -118.437919), Route carried "under" structure: Interstate 10, Year Built: 1963, Structure Length: 0. m, Average Daily Traffic: 237,000 (year 2010), Truck Traffic: 2%, Features Intersected: 10, 405, STS, METRO RR
Minimum Vertical Clearance: 5.76m (18.90ft), Kilometerpoint: 5.280, Lanes on structure: 2, Lanes under structure: 7, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 55.0m (180.4ft)
Structure Number: 53 1627G, Location: 07-LA-010-R5.28-LA (Lat: 34.030250, Lng: -118.437919), Route carried "under" structure: Interstate 10, Year Built: 1963, Structure Length: 0. m, Average Daily Traffic: 237,000 (year 2010), Truck Traffic: 2%, Features Intersected: 10, 405, STS, METRO RR
Minimum Vertical Clearance: 5.76m (18.90ft), Kilometerpoint: 5.280, Lanes on structure: 2, Lanes under structure: 7, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 55.0m (180.4ft)
Find on map >> Show street view
Structure Number: 53 1627G, Location: 07-LA-010-R5.28-LA (Lat: 34.030250, Lng: -118.437919), Route carried "under" structure: City street , Year Built: 1963, Structure Length: 0. m, Average Daily Traffic: 24,160 (year 2010), Truck Traffic: 2%, Features Intersected: 10, 405, STS, METRO RR, Facility Carried by Structure: E10-N405 CONN
Minimum Vertical Clearance: 9.75m (31.99ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 55.0m (180.4ft)
Structure Number: 53 1627G, Location: 07-LA-010-R5.28-LA (Lat: 34.030250, Lng: -118.437919), Route carried "under" structure: City street , Year Built: 1963, Structure Length: 0. m, Average Daily Traffic: 24,160 (year 2010), Truck Traffic: 2%, Features Intersected: 10, 405, STS, METRO RR, Facility Carried by Structure: E10-N405 CONN
Minimum Vertical Clearance: 9.75m (31.99ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 55.0m (180.4ft)
Find on map >> Show street view
Structure Number: 53 1628, Location: 07-LA-010-R5.43-LA (Lat: 34.031078, Lng: -118.433808), Route carried "under" structure: Interstate 405, Year Built: 1963, Structure Length: 0. m, Average Daily Traffic: 268,000 (year 2010), Truck Traffic: 5%, Features Intersected: INTERSTATE 405, Facility Carried by Structure: INTERSTATE 10
Minimum Vertical Clearance: 4.88m (16.01ft), Kilometerpoint: 29.540, Lanes on structure: 6, Lanes under structure: 10, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 26.1m (85.6ft)
Structure Number: 53 1628, Location: 07-LA-010-R5.43-LA (Lat: 34.031078, Lng: -118.433808), Route carried "under" structure: Interstate 405, Year Built: 1963, Structure Length: 0. m, Average Daily Traffic: 268,000 (year 2010), Truck Traffic: 5%, Features Intersected: INTERSTATE 405, Facility Carried by Structure: INTERSTATE 10
Minimum Vertical Clearance: 4.88m (16.01ft), Kilometerpoint: 29.540, Lanes on structure: 6, Lanes under structure: 10, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 26.1m (85.6ft)
Find on map >> Show street view
Structure Number: 53 1629F, Location: 07-LA-405-29.62-LA (Lat: 34.031708, Lng: -118.434708), Route carried "under" structure: Interstate 10, Year Built: 1963, Structure Length: 0. m, Average Daily Traffic: 233,000 (year 2011), Truck Traffic: 10%, Features Intersected: W10-S405, I 10,SEPULVEDA
Minimum Vertical Clearance: 4.69m (15.39ft), Kilometerpoint: 29.620, Lanes on structure: 2, Lanes under structure: 3, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 45.7m (149.9ft)
Structure Number: 53 1629F, Location: 07-LA-405-29.62-LA (Lat: 34.031708, Lng: -118.434708), Route carried "under" structure: Interstate 10, Year Built: 1963, Structure Length: 0. m, Average Daily Traffic: 233,000 (year 2011), Truck Traffic: 10%, Features Intersected: W10-S405, I 10,SEPULVEDA
Minimum Vertical Clearance: 4.69m (15.39ft), Kilometerpoint: 29.620, Lanes on structure: 2, Lanes under structure: 3, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 45.7m (149.9ft)
Find on map >> Show street view
Structure Number: 53 1629F, Location: 07-LA-405-29.62-LA (Lat: 34.031708, Lng: -118.434708), Route carried "under" structure: Interstate 10, Year Built: 1963, Structure Length: 0. m, Average Daily Traffic: 259,000 (year 2011), Truck Traffic: 10%, Features Intersected: W10-S405, I 10,SEPULVEDA
Minimum Vertical Clearance: 4.64m (15.22ft), Kilometerpoint: 5.450, Lanes on structure: 2, Lanes under structure: 3, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 45.7m (149.9ft)
Structure Number: 53 1629F, Location: 07-LA-405-29.62-LA (Lat: 34.031708, Lng: -118.434708), Route carried "under" structure: Interstate 10, Year Built: 1963, Structure Length: 0. m, Average Daily Traffic: 259,000 (year 2011), Truck Traffic: 10%, Features Intersected: W10-S405, I 10,SEPULVEDA
Minimum Vertical Clearance: 4.64m (15.22ft), Kilometerpoint: 5.450, Lanes on structure: 2, Lanes under structure: 3, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 45.7m (149.9ft)
Find on map >> Show street view
Structure Number: 53 1630G, Location: 07-LA-405-29.43-LA (Lat: 34.031314, Lng: -118.435908), Route carried "under" structure: Interstate 10, Year Built: 1963, Structure Length: 0. m, Average Daily Traffic: 259,000 (year 2011), Truck Traffic: 4%, Features Intersected: I 405 & I 10,SAWTELLE
Minimum Vertical Clearance: 4.87m (15.98ft), Kilometerpoint: 5.440, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 45.7m (149.9ft)
Structure Number: 53 1630G, Location: 07-LA-405-29.43-LA (Lat: 34.031314, Lng: -118.435908), Route carried "under" structure: Interstate 10, Year Built: 1963, Structure Length: 0. m, Average Daily Traffic: 259,000 (year 2011), Truck Traffic: 4%, Features Intersected: I 405 & I 10,SAWTELLE
Minimum Vertical Clearance: 4.87m (15.98ft), Kilometerpoint: 5.440, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 45.7m (149.9ft)
Find on map >> Show street view
Structure Number: 53 1630G, Location: 07-LA-405-29.43-LA (Lat: 34.031314, Lng: -118.435908), Route carried "under" structure: Interstate 405, Year Built: 1963, Structure Length: 0. m, Average Daily Traffic: 296,000 (year 2011), Truck Traffic: 10%, Features Intersected: I 405 & I 10,SAWTELLE
Minimum Vertical Clearance: 12.85m (42.16ft), Kilometerpoint: 29.430, Lanes on structure: 2, Lanes under structure: 6, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 45.7m (149.9ft)
Structure Number: 53 1630G, Location: 07-LA-405-29.43-LA (Lat: 34.031314, Lng: -118.435908), Route carried "under" structure: Interstate 405, Year Built: 1963, Structure Length: 0. m, Average Daily Traffic: 296,000 (year 2011), Truck Traffic: 10%, Features Intersected: I 405 & I 10,SAWTELLE
Minimum Vertical Clearance: 12.85m (42.16ft), Kilometerpoint: 29.430, Lanes on structure: 2, Lanes under structure: 6, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 45.7m (149.9ft)
Find on map >> Show street view
Structure Number: 53 1630G, Location: 07-LA-405-29.43-LA (Lat: 34.031314, Lng: -118.435908), Route carried "under" structure: Interstate 10, Year Built: 1963, Structure Length: 0. m, Average Daily Traffic: 259,000 (year 2011), Truck Traffic: 8%, Features Intersected: I 405 & I 10,SAWTELLE
Minimum Vertical Clearance: 4.62m (15.16ft), Kilometerpoint: 5.440, Lanes on structure: 2, Lanes under structure: 6, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 45.7m (149.9ft)
Structure Number: 53 1630G, Location: 07-LA-405-29.43-LA (Lat: 34.031314, Lng: -118.435908), Route carried "under" structure: Interstate 10, Year Built: 1963, Structure Length: 0. m, Average Daily Traffic: 259,000 (year 2011), Truck Traffic: 8%, Features Intersected: I 405 & I 10,SAWTELLE
Minimum Vertical Clearance: 4.62m (15.16ft), Kilometerpoint: 5.440, Lanes on structure: 2, Lanes under structure: 6, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 45.7m (149.9ft)
Find on map >> Show street view
Structure Number: 53 1630G, Location: 07-LA-405-29.43-LA (Lat: 34.031314, Lng: -118.435908), Route carried "under" structure: City street L127, Year Built: 1963, Structure Length: 0. m, Average Daily Traffic: 22,800 (year 2011), Truck Traffic: 2%, Features Intersected: I 405 & I 10,SAWTELLE, Facility Carried by Structure: N405-W10 CONNECTOR
Minimum Vertical Clearance: 9.91m (32.51ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 45.7m (149.9ft)
Structure Number: 53 1630G, Location: 07-LA-405-29.43-LA (Lat: 34.031314, Lng: -118.435908), Route carried "under" structure: City street L127, Year Built: 1963, Structure Length: 0. m, Average Daily Traffic: 22,800 (year 2011), Truck Traffic: 2%, Features Intersected: I 405 & I 10,SAWTELLE, Facility Carried by Structure: N405-W10 CONNECTOR
Minimum Vertical Clearance: 9.91m (32.51ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 45.7m (149.9ft)
Find on map >> Show street view
Structure Number: 53 1634, Location: 07-LA-010-R5.99-LA (Lat: 34.031581, Lng: -118.424347), Route carried "under" structure: City street , Year Built: 1964, Structure Length: 0. m, Average Daily Traffic: 2,300 (year 2010), Truck Traffic: 2%, Features Intersected: COVENTRY PLACE, Facility Carried by Structure: INTERSTATE 10
Minimum Vertical Clearance: 6.96m (22.83ft), Kilometerpoint: 0.000, Lanes on structure: 10, Lanes under structure: 2, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 20.4m (66.9ft)
Structure Number: 53 1634, Location: 07-LA-010-R5.99-LA (Lat: 34.031581, Lng: -118.424347), Route carried "under" structure: City street , Year Built: 1964, Structure Length: 0. m, Average Daily Traffic: 2,300 (year 2010), Truck Traffic: 2%, Features Intersected: COVENTRY PLACE, Facility Carried by Structure: INTERSTATE 10
Minimum Vertical Clearance: 6.96m (22.83ft), Kilometerpoint: 0.000, Lanes on structure: 10, Lanes under structure: 2, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 20.4m (66.9ft)
Find on map >> Show street view
Structure Number: 53 1635S, Location: 07-LA-110-24.53R-LA (Lat: 34.069194, Lng: -118.237119), Route carried "under" structure: State highway 110, Year Built: 1962, Structure Length: 0. m, Average Daily Traffic: 210,000 (year 2012), Truck Traffic: 2%, Features Intersected: STATE ROUTE 110
Minimum Vertical Clearance: 4.90m (16.08ft), Kilometerpoint: 24.530, Lanes on structure: 2, Lanes under structure: 6, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 47.9m (157.2ft)
Structure Number: 53 1635S, Location: 07-LA-110-24.53R-LA (Lat: 34.069194, Lng: -118.237119), Route carried "under" structure: State highway 110, Year Built: 1962, Structure Length: 0. m, Average Daily Traffic: 210,000 (year 2012), Truck Traffic: 2%, Features Intersected: STATE ROUTE 110
Minimum Vertical Clearance: 4.90m (16.08ft), Kilometerpoint: 24.530, Lanes on structure: 2, Lanes under structure: 6, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 47.9m (157.2ft)
Find on map >> Show street view
Structure Number: 53 1637F, Location: 07-LA-010-R5.65-LA (Lat: 34.032225, Lng: -118.428000), Route carried "under" structure: City street , Year Built: 1964, Structure Length: 0. m, Average Daily Traffic: 4,100 (year 2010), Truck Traffic: 1%, Features Intersected: 10, 405, RAMPS, STS, Facility Carried by Structure: W10-S405 CONN
Minimum Vertical Clearance: 7.98m (26.18ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 58.5m (191.9ft)
Structure Number: 53 1637F, Location: 07-LA-010-R5.65-LA (Lat: 34.032225, Lng: -118.428000), Route carried "under" structure: City street , Year Built: 1964, Structure Length: 0. m, Average Daily Traffic: 4,100 (year 2010), Truck Traffic: 1%, Features Intersected: 10, 405, RAMPS, STS, Facility Carried by Structure: W10-S405 CONN
Minimum Vertical Clearance: 7.98m (26.18ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 58.5m (191.9ft)
Find on map >> Show street view
Structure Number: 53 1637F, Location: 07-LA-010-R5.65-LA (Lat: 34.032225, Lng: -118.428000), Route carried "under" structure: City street , Year Built: 1964, Structure Length: 0. m, Average Daily Traffic: 33,000 (year 2010), Truck Traffic: 2%, Features Intersected: 10, 405, RAMPS, STS, Facility Carried by Structure: W10-S405 CONN
Minimum Vertical Clearance: 7.60m (24.93ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 58.5m (191.9ft)
Structure Number: 53 1637F, Location: 07-LA-010-R5.65-LA (Lat: 34.032225, Lng: -118.428000), Route carried "under" structure: City street , Year Built: 1964, Structure Length: 0. m, Average Daily Traffic: 33,000 (year 2010), Truck Traffic: 2%, Features Intersected: 10, 405, RAMPS, STS, Facility Carried by Structure: W10-S405 CONN
Minimum Vertical Clearance: 7.60m (24.93ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 58.5m (191.9ft)
Find on map >> Show street view
Structure Number: 53 1637F, Location: 07-LA-010-R5.65-LA (Lat: 34.032225, Lng: -118.428000), Route carried "under" structure: City street , Year Built: 1964, Structure Length: 0. m, Average Daily Traffic: 43,550 (year 2010), Truck Traffic: 1%, Features Intersected: 10, 405, RAMPS, STS, Facility Carried by Structure: W10-S405 CONN
Minimum Vertical Clearance: 4.88m (16.01ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 58.5m (191.9ft)
Structure Number: 53 1637F, Location: 07-LA-010-R5.65-LA (Lat: 34.032225, Lng: -118.428000), Route carried "under" structure: City street , Year Built: 1964, Structure Length: 0. m, Average Daily Traffic: 43,550 (year 2010), Truck Traffic: 1%, Features Intersected: 10, 405, RAMPS, STS, Facility Carried by Structure: W10-S405 CONN
Minimum Vertical Clearance: 4.88m (16.01ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 58.5m (191.9ft)
Find on map >> Show street view
Structure Number: 53 1637F, Location: 07-LA-010-R5.65-LA (Lat: 34.032225, Lng: -118.428000), Route carried "under" structure: Interstate 405, Year Built: 1964, Structure Length: 0. m, Average Daily Traffic: 294,000 (year 2010), Truck Traffic: 5%, Features Intersected: 10, 405, RAMPS, STS
Minimum Vertical Clearance: 4.57m (14.99ft), Kilometerpoint: 5.650, Lanes on structure: 2, Lanes under structure: 8, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 58.5m (191.9ft)
Structure Number: 53 1637F, Location: 07-LA-010-R5.65-LA (Lat: 34.032225, Lng: -118.428000), Route carried "under" structure: Interstate 405, Year Built: 1964, Structure Length: 0. m, Average Daily Traffic: 294,000 (year 2010), Truck Traffic: 5%, Features Intersected: 10, 405, RAMPS, STS
Minimum Vertical Clearance: 4.57m (14.99ft), Kilometerpoint: 5.650, Lanes on structure: 2, Lanes under structure: 8, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 58.5m (191.9ft)
Find on map >> Show street view
Structure Number: 53 1637F, Location: 07-LA-010-R5.65-LA (Lat: 34.032225, Lng: -118.428000), Route carried "under" structure: Ramp Interstate 405, Year Built: 1964, Structure Length: 0. m, Average Daily Traffic: 52,000 (year 2010), Truck Traffic: 2%, Features Intersected: 10, 405, RAMPS, STS
Minimum Vertical Clearance: 5.02m (16.47ft), Kilometerpoint: 5.650, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 58.5m (191.9ft)
Structure Number: 53 1637F, Location: 07-LA-010-R5.65-LA (Lat: 34.032225, Lng: -118.428000), Route carried "under" structure: Ramp Interstate 405, Year Built: 1964, Structure Length: 0. m, Average Daily Traffic: 52,000 (year 2010), Truck Traffic: 2%, Features Intersected: 10, 405, RAMPS, STS
Minimum Vertical Clearance: 5.02m (16.47ft), Kilometerpoint: 5.650, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 58.5m (191.9ft)
Find on map >> Show street view
Structure Number: 53 1637F, Location: 07-LA-010-R5.65-LA (Lat: 34.032225, Lng: -118.428000), Route carried "under" structure: Interstate 405, Year Built: 1964, Structure Length: 0. m, Average Daily Traffic: 268,000 (year 2010), Truck Traffic: 5%, Features Intersected: 10, 405, RAMPS, STS
Minimum Vertical Clearance: 11.28m (37.01ft), Kilometerpoint: 29.540, Lanes on structure: 2, Lanes under structure: 10, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 58.5m (191.9ft)
Structure Number: 53 1637F, Location: 07-LA-010-R5.65-LA (Lat: 34.032225, Lng: -118.428000), Route carried "under" structure: Interstate 405, Year Built: 1964, Structure Length: 0. m, Average Daily Traffic: 268,000 (year 2010), Truck Traffic: 5%, Features Intersected: 10, 405, RAMPS, STS
Minimum Vertical Clearance: 11.28m (37.01ft), Kilometerpoint: 29.540, Lanes on structure: 2, Lanes under structure: 10, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 58.5m (191.9ft)
Find on map >> Show street view
Structure Number: 53 1637F, Location: 07-LA-010-R5.65-LA (Lat: 34.032225, Lng: -118.428000), Route carried "under" structure: Ramp Interstate 405, Year Built: 1964, Structure Length: 0. m, Average Daily Traffic: 5,200 (year 2010), Truck Traffic: 1%, Features Intersected: 10, 405, RAMPS, STS
Minimum Vertical Clearance: 5.18m (16.99ft), Kilometerpoint: 29.100, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 58.5m (191.9ft)
Structure Number: 53 1637F, Location: 07-LA-010-R5.65-LA (Lat: 34.032225, Lng: -118.428000), Route carried "under" structure: Ramp Interstate 405, Year Built: 1964, Structure Length: 0. m, Average Daily Traffic: 5,200 (year 2010), Truck Traffic: 1%, Features Intersected: 10, 405, RAMPS, STS
Minimum Vertical Clearance: 5.18m (16.99ft), Kilometerpoint: 29.100, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 58.5m (191.9ft)
Find on map >> Show street view
Structure Number: 53 1638G, Location: 07-LA-405-29.42-LA (Lat: 34.030394, Lng: -118.430733), Route carried "under" structure: City street L128, Year Built: 1963, Structure Length: 0. m, Average Daily Traffic: 28,978 (year 2019), Truck Traffic: 2%, Features Intersected: SEPULVEDA BLVD, Facility Carried by Structure: N405-E10 CONNECTOR
Minimum Vertical Clearance: 5.94m (19.49ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 32.9m (107.9ft)
Structure Number: 53 1638G, Location: 07-LA-405-29.42-LA (Lat: 34.030394, Lng: -118.430733), Route carried "under" structure: City street L128, Year Built: 1963, Structure Length: 0. m, Average Daily Traffic: 28,978 (year 2019), Truck Traffic: 2%, Features Intersected: SEPULVEDA BLVD, Facility Carried by Structure: N405-E10 CONNECTOR
Minimum Vertical Clearance: 5.94m (19.49ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 32.9m (107.9ft)
Find on map >> Show street view
Structure Number: 53 164, Location: 07-LA-010-R5.76-LA (Lat: 34.031444, Lng: -118.428033), Route carried "under" structure: County highway , Year Built: 1964, Structure Length: 0. m, Average Daily Traffic: 4,120 (year 2010), Truck Traffic: 2%, Features Intersected: MILITARY AVE, Facility Carried by Structure: INTERSTATE 10
Minimum Vertical Clearance: 4.70m (15.42ft), Kilometerpoint: 0.000, Lanes on structure: 10, Lanes under structure: 2, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 29.8m (97.8ft)
Structure Number: 53 164, Location: 07-LA-010-R5.76-LA (Lat: 34.031444, Lng: -118.428033), Route carried "under" structure: County highway , Year Built: 1964, Structure Length: 0. m, Average Daily Traffic: 4,120 (year 2010), Truck Traffic: 2%, Features Intersected: MILITARY AVE, Facility Carried by Structure: INTERSTATE 10
Minimum Vertical Clearance: 4.70m (15.42ft), Kilometerpoint: 0.000, Lanes on structure: 10, Lanes under structure: 2, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 29.8m (97.8ft)
Find on map >> Show street view
Structure Number: 53 1672, Location: 07-LA-170-R17.75-LA (Lat: 34.193756, Lng: -118.402208), Route carried "under" structure: City street L546, Year Built: 1968, Structure Length: 0. m, Average Daily Traffic: 5,000 (year 2018), Truck Traffic: 2%, Features Intersected: VANOWEN STREET, Facility Carried by Structure: ROUTE 170
Minimum Vertical Clearance: 4.62m (15.16ft), Kilometerpoint: 0.000, Lanes on structure: 10, Lanes under structure: 5, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 27.4m (89.9ft)
Structure Number: 53 1672, Location: 07-LA-170-R17.75-LA (Lat: 34.193756, Lng: -118.402208), Route carried "under" structure: City street L546, Year Built: 1968, Structure Length: 0. m, Average Daily Traffic: 5,000 (year 2018), Truck Traffic: 2%, Features Intersected: VANOWEN STREET, Facility Carried by Structure: ROUTE 170
Minimum Vertical Clearance: 4.62m (15.16ft), Kilometerpoint: 0.000, Lanes on structure: 10, Lanes under structure: 5, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 27.4m (89.9ft)
Find on map >> Show street view
Structure Number: 53 1674, Location: 07-LA-170-R18.40-LA (Lat: 34.203061, Lng: -118.405206), Route carried "under" structure: State highway 170, Year Built: 1968, Structure Length: 0. m, Average Daily Traffic: 184,000 (year 2009), Truck Traffic: 5%, Features Intersected: STATE ROUTE 170, Facility Carried by Structure: UPRR,AMTRAK,METRO
Minimum Vertical Clearance: 3.86m (12.66ft), Kilometerpoint: 18.400, Lanes under structure: 11, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 29.0m (95.1ft)
Structure Number: 53 1674, Location: 07-LA-170-R18.40-LA (Lat: 34.203061, Lng: -118.405206), Route carried "under" structure: State highway 170, Year Built: 1968, Structure Length: 0. m, Average Daily Traffic: 184,000 (year 2009), Truck Traffic: 5%, Features Intersected: STATE ROUTE 170, Facility Carried by Structure: UPRR,AMTRAK,METRO
Minimum Vertical Clearance: 3.86m (12.66ft), Kilometerpoint: 18.400, Lanes under structure: 11, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 29.0m (95.1ft)
Find on map >> Show street view
Structure Number: 53 1675, Location: 07-LA-170-R19.72-LA (Lat: 34.221453, Lng: -118.409772), Route carried "under" structure: City street L549, Year Built: 1968, Structure Length: 0. m, Average Daily Traffic: 5,000 (year 2017), Truck Traffic: 2%, Features Intersected: ROSCOE BLVD, Facility Carried by Structure: STATE ROUTE 170
Minimum Vertical Clearance: 4.67m (15.32ft), Kilometerpoint: 0.000, Lanes on structure: 11, Lanes under structure: 6, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 15.8m (51.8ft)
Structure Number: 53 1675, Location: 07-LA-170-R19.72-LA (Lat: 34.221453, Lng: -118.409772), Route carried "under" structure: City street L549, Year Built: 1968, Structure Length: 0. m, Average Daily Traffic: 5,000 (year 2017), Truck Traffic: 2%, Features Intersected: ROSCOE BLVD, Facility Carried by Structure: STATE ROUTE 170
Minimum Vertical Clearance: 4.67m (15.32ft), Kilometerpoint: 0.000, Lanes on structure: 11, Lanes under structure: 6, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 15.8m (51.8ft)
Find on map >> Show street view
Structure Number: 53 1676, Location: 07-LA-170-R19.30-LA (Lat: 34.215547, Lng: -118.408275), Route carried "under" structure: City street L576, Year Built: 1968, Structure Length: 0. m, Average Daily Traffic: 5,000 (year 2017), Truck Traffic: 1%, Features Intersected: STRATHERN STREET, Facility Carried by Structure: ROUTE 170
Minimum Vertical Clearance: 4.90m (16.08ft), Kilometerpoint: 0.000, Lanes on structure: 8, Lanes under structure: 3, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 27.1m (88.9ft)
Structure Number: 53 1676, Location: 07-LA-170-R19.30-LA (Lat: 34.215547, Lng: -118.408275), Route carried "under" structure: City street L576, Year Built: 1968, Structure Length: 0. m, Average Daily Traffic: 5,000 (year 2017), Truck Traffic: 1%, Features Intersected: STRATHERN STREET, Facility Carried by Structure: ROUTE 170
Minimum Vertical Clearance: 4.90m (16.08ft), Kilometerpoint: 0.000, Lanes on structure: 8, Lanes under structure: 3, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 27.1m (88.9ft)
Find on map >> Show street view
Structure Number: 53 1677, Location: 07-LA-170-R18.27-LA (Lat: 34.201072, Lng: -118.403992), Route carried "under" structure: State highway 170, Year Built: 1968, Structure Length: 0. m, Average Daily Traffic: 206,000 (year 2017), Truck Traffic: 5%, Features Intersected: ROUTE 170, Facility Carried by Structure: SHERMAN WAY OC
Minimum Vertical Clearance: 4.52m (14.83ft), Kilometerpoint: 18.270, Lanes on structure: 7, Lanes under structure: 12, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 28.7m (94.2ft)
Structure Number: 53 1677, Location: 07-LA-170-R18.27-LA (Lat: 34.201072, Lng: -118.403992), Route carried "under" structure: State highway 170, Year Built: 1968, Structure Length: 0. m, Average Daily Traffic: 206,000 (year 2017), Truck Traffic: 5%, Features Intersected: ROUTE 170, Facility Carried by Structure: SHERMAN WAY OC
Minimum Vertical Clearance: 4.52m (14.83ft), Kilometerpoint: 18.270, Lanes on structure: 7, Lanes under structure: 12, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 28.7m (94.2ft)
Find on map >> Show street view
Structure Number: 53 168, Location: 07-LA-101-28.29-LA (Lat: 34.153161, Lng: -118.651825), Route carried "under" structure: US 101, Year Built: 1965, Structure Length: 0. m, Average Daily Traffic: 196,000 (year 2018), Truck Traffic: 10%, Features Intersected: US 101, Facility Carried by Structure: PARKWAY CALABASAS
Minimum Vertical Clearance: 4.69m (15.39ft), Kilometerpoint: 28.290, Lanes on structure: 5, Lanes under structure: 8, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 25.6m (84.0ft)
Structure Number: 53 168, Location: 07-LA-101-28.29-LA (Lat: 34.153161, Lng: -118.651825), Route carried "under" structure: US 101, Year Built: 1965, Structure Length: 0. m, Average Daily Traffic: 196,000 (year 2018), Truck Traffic: 10%, Features Intersected: US 101, Facility Carried by Structure: PARKWAY CALABASAS
Minimum Vertical Clearance: 4.69m (15.39ft), Kilometerpoint: 28.290, Lanes on structure: 5, Lanes under structure: 8, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 25.6m (84.0ft)
Find on map >> Show street view
Structure Number: 53 1682S, Location: 07-LA-170-R18.16-LA (Lat: 34.199644, Lng: -118.402578), Route carried "under" structure: Ramp State highway 170, Year Built: 1968, Structure Length: 0. m, Average Daily Traffic: 3,000 (year 2017), Truck Traffic: 10%, Features Intersected: SHERMAN WY N170 ON-RAMP
Minimum Vertical Clearance: 4.62m (15.16ft), Kilometerpoint: 18.000, Lanes on structure: 1, Lanes under structure: 1, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 18.9m (62.0ft)
Structure Number: 53 1682S, Location: 07-LA-170-R18.16-LA (Lat: 34.199644, Lng: -118.402578), Route carried "under" structure: Ramp State highway 170, Year Built: 1968, Structure Length: 0. m, Average Daily Traffic: 3,000 (year 2017), Truck Traffic: 10%, Features Intersected: SHERMAN WY N170 ON-RAMP
Minimum Vertical Clearance: 4.62m (15.16ft), Kilometerpoint: 18.000, Lanes on structure: 1, Lanes under structure: 1, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 18.9m (62.0ft)
Find on map >> Show street view
Structure Number: 53 1684, Location: 07-LA-170-R15.99-LA (Lat: 34.171914, Lng: -118.388222), Route carried "under" structure: City street L570, Year Built: 1966, Structure Length: 0. m, Average Daily Traffic: 8,500 (year 2017), Truck Traffic: 6%, Features Intersected: BURBANK BLVD, Facility Carried by Structure: STATE ROUTE 170
Minimum Vertical Clearance: 4.72m (15.49ft), Kilometerpoint: 0.000, Lanes on structure: 10, Lanes under structure: 6, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 25.6m (84.0ft)
Structure Number: 53 1684, Location: 07-LA-170-R15.99-LA (Lat: 34.171914, Lng: -118.388222), Route carried "under" structure: City street L570, Year Built: 1966, Structure Length: 0. m, Average Daily Traffic: 8,500 (year 2017), Truck Traffic: 6%, Features Intersected: BURBANK BLVD, Facility Carried by Structure: STATE ROUTE 170
Minimum Vertical Clearance: 4.72m (15.49ft), Kilometerpoint: 0.000, Lanes on structure: 10, Lanes under structure: 6, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 25.6m (84.0ft)
Find on map >> Show street view
Structure Number: 53 1686, Location: 07-LA-170-R16.77-LA (Lat: 34.181336, Lng: -118.396233), Route carried "under" structure: City street L408, Year Built: 1966, Structure Length: 0. m, Average Daily Traffic: 14,000 (year 2017), Truck Traffic: 2%, Features Intersected: LAUREL CANYON BLVD, Facility Carried by Structure: STATE ROUTE 170
Minimum Vertical Clearance: 4.64m (15.22ft), Kilometerpoint: 0.000, Lanes on structure: 11, Lanes under structure: 4, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 25.9m (85.0ft)
Structure Number: 53 1686, Location: 07-LA-170-R16.77-LA (Lat: 34.181336, Lng: -118.396233), Route carried "under" structure: City street L408, Year Built: 1966, Structure Length: 0. m, Average Daily Traffic: 14,000 (year 2017), Truck Traffic: 2%, Features Intersected: LAUREL CANYON BLVD, Facility Carried by Structure: STATE ROUTE 170
Minimum Vertical Clearance: 4.64m (15.22ft), Kilometerpoint: 0.000, Lanes on structure: 11, Lanes under structure: 4, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 25.9m (85.0ft)
Find on map >> Show street view
Structure Number: 53 1687, Location: 07-LA-170-R17.25-LA (Lat: 34.186469, Lng: -118.401039), Route carried "under" structure: City street L545, Year Built: 1966, Structure Length: 0. m, Average Daily Traffic: 5,000 (year 2017), Truck Traffic: 2%, Features Intersected: VICTORY BLVD, Facility Carried by Structure: STATE ROUTE 170
Minimum Vertical Clearance: 4.69m (15.39ft), Kilometerpoint: 0.000, Lanes on structure: 12, Lanes under structure: 6, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 15.8m (51.8ft)
Structure Number: 53 1687, Location: 07-LA-170-R17.25-LA (Lat: 34.186469, Lng: -118.401039), Route carried "under" structure: City street L545, Year Built: 1966, Structure Length: 0. m, Average Daily Traffic: 5,000 (year 2017), Truck Traffic: 2%, Features Intersected: VICTORY BLVD, Facility Carried by Structure: STATE ROUTE 170
Minimum Vertical Clearance: 4.69m (15.39ft), Kilometerpoint: 0.000, Lanes on structure: 12, Lanes under structure: 6, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 15.8m (51.8ft)