Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Los Angeles, California (CA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 2,325Number of bridges
  • 39,718ft / 12,106mTotal length
  • $98,718,000Total costs
  • 180,570,830Total average daily traffic
  • 9,950,919Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Los Angeles
  • No street view available for this location

New bridges in Los Angeles, CA - historical statistics
  • New bridges - historical statistics
  • 121900-1909
  • 41910-1919
  • 431920-1929
  • 721930-1939
  • 1701940-1949
  • 5201950-1959
  • 6961960-1969
  • 3091970-1979
  • 1881980-1989
  • 2231990-1999
  • 512000-2009
  • 372010-2019
Reconstructed bridges in Los Angeles, CA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11920-1929
  • 31930-1939
  • 51940-1949
  • 181950-1959
  • 501960-1969
  • 341970-1979
  • 461980-1989
  • 421990-1999
  • 702000-2009
  • 132010-2019
Average Bridge Truck Traffic in Los Angeles, CA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 81.7%Good
  • 1.1%Satisfactory
  • 15.5%Fair
  • 1.7%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 0.5%Very good
  • 89.2%Good
  • 1.1%Satisfactory
  • 9.2%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 94.1%Good
  • 2.3%Satisfactory
  • 3.4%Fair
  • 0.2%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 16.2%Excellent
  • 77.2%Very good
  • 2.7%Good
  • 2.2%Satisfactory
  • 1.7%Fair
  • 0.5%Poor
  • 0.2%Serious
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 76.5%Good
  • 23.5%Satisfactory
Find on map >>   Show street view

Structure Number: 53 1687K,  Location: 07-LA-170-R17.25-LA (Lat: 34.186472,  Lng: -118.401689),  Route carried "under" structure: City street L545,  Year Built: 1966,  Structure Length: 0. m,  Average Daily Traffic: 5,000 (year 2017),  Truck Traffic: 2%,  Features Intersected: VICTORY BLVD,  Facility Carried by Structure: STATE ROUTE 170
Minimum Vertical Clearance: 4.62m (15.16ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 16.8m (55.1ft)

Find on map >>   Show street view

Structure Number: 53 1687S,  Location: 07-LA-170-R17.25-LA (Lat: 34.186472,  Lng: -118.400778),  Route carried "under" structure: City street L545,  Year Built: 1966,  Structure Length: 0. m,  Average Daily Traffic: 5,000 (year 2009),  Truck Traffic: 2%,  Features Intersected: VICTORY BLVD,  Facility Carried by Structure: STATE ROUTE 170
Minimum Vertical Clearance: 4.64m (15.22ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 16.8m (55.1ft)

Find on map >>   Show street view

Structure Number: 53 1691,  Location: 07-LA-170-R18.02-LA (Lat: 34.197358,  Lng: -118.403219),  Route carried "under" structure: State highway 170,  Year Built: 1968,  Structure Length: 0. m,  Average Daily Traffic: 184,000 (year 2009),  Truck Traffic: 5%,  Features Intersected: STATE ROUTE 170,  Facility Carried by Structure: HART STREET POC
Minimum Vertical Clearance: 5.18m (16.99ft),  Kilometerpoint: 18.020,  Lanes under structure: 11,  Material/Design: Prestressed concrete continuous,  Design/Construction: Slab,  Length of Maximum Span: 25.0m (82.0ft)

Find on map >>   Show street view

Structure Number: 53 1700S,  Location: 07-LA-170-R17.13-LA (Lat: 34.185453,  Lng: -118.400136),  Route carried "under" structure: Ramp State highway 170,  Year Built: 1966,  Structure Length: 0. m,  Average Daily Traffic: 1,500 (year 2017),  Truck Traffic: 5%,  Features Intersected: N170-VICTORY BL OFF-RAMP
Minimum Vertical Clearance: 4.74m (15.55ft),  Kilometerpoint: 17.000,  Lanes on structure: 1,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 18.3m (60.0ft)

Find on map >>   Show street view

Structure Number: 53 1701K,  Location: 07-LA-170-R17.33-LA (Lat: 34.188078,  Lng: -118.402433),  Route carried "under" structure: Ramp State highway 170,  Year Built: 1966,  Structure Length: 0. m,  Average Daily Traffic: 3,000 (year 2017),  Truck Traffic: 5%,  Features Intersected: S170-VICTORY BL OFF-RAMP
Minimum Vertical Clearance: 4.70m (15.42ft),  Kilometerpoint: 17.000,  Lanes on structure: 1,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 17.7m (58.1ft)

Find on map >>   Show street view

Structure Number: 53 1708,  Location: 07-LA-710-R27.11-LA (Lat: 34.069592,  Lng: -118.162572),  Route carried "under" structure: State highway 710,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 45,500 (year 2017),  Truck Traffic: 5%,  Features Intersected: INTERSTATE 710,  Facility Carried by Structure: HELLMAN AVE
Minimum Vertical Clearance: 5.00m (16.40ft),  Kilometerpoint: 27.110,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 23.5m (77.1ft)

Find on map >>   Show street view

Structure Number: 53 1712K,  Location: 07-LA-710-24.32-LA (Lat: 34.030617,  Lng: -118.171742),  Route carried "under" structure: Ramp State highway 60,  Year Built: 1967,  Structure Length: 0. m,  Average Daily Traffic: 55,501 (year 2010),  Truck Traffic: 30%,  Features Intersected: E&W60-S710 CONNECTOR RMP,  Facility Carried by Structure: S710-HUMPHREYS AV
Minimum Vertical Clearance: 4.47m (14.67ft),  Kilometerpoint: 3.200,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 25.0m (82.0ft)

Find on map >>   Show street view

Structure Number: 53 1714G,  Location: 07-LA-710-24.61-LA (Lat: 34.031997,  Lng: -118.169786),  Route carried "under" structure: Ramp Interstate 60,  Year Built: 1967,  Structure Length: 0. m,  Average Daily Traffic: 35,000 (year 2010),  Truck Traffic: 4%,  Features Intersected: I 710 & SR 60,CONS,STS
Minimum Vertical Clearance: 4.64m (15.22ft),  Kilometerpoint: 3.290,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 37.8m (124.0ft)

Find on map >>   Show street view

Structure Number: 53 1714G,  Location: 07-LA-710-24.61-LA (Lat: 34.031997,  Lng: -118.169786),  Route carried "under" structure: Ramp Interstate 60,  Year Built: 1967,  Structure Length: 0. m,  Average Daily Traffic: 25,000 (year 2010),  Truck Traffic: 4%,  Features Intersected: I 710 & SR 60,CONS,STS
Minimum Vertical Clearance: 5.08m (16.67ft),  Kilometerpoint: 3.290,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 37.8m (124.0ft)

Find on map >>   Show street view

Structure Number: 53 1714G,  Location: 07-LA-710-24.61-LA (Lat: 34.031997,  Lng: -118.169786),  Route carried "under" structure: Ramp Interstate 710,  Year Built: 1967,  Structure Length: 0. m,  Average Daily Traffic: 16,000 (year 2010),  Truck Traffic: 8%,  Features Intersected: I 710 & SR 60,CONS,STS
Minimum Vertical Clearance: 5.57m (18.27ft),  Kilometerpoint: 24.610,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 37.8m (124.0ft)

Find on map >>   Show street view

Structure Number: 53 1714G,  Location: 07-LA-710-24.61-LA (Lat: 34.031997,  Lng: -118.169786),  Route carried "under" structure: Interstate 710,  Year Built: 1967,  Structure Length: 0. m,  Average Daily Traffic: 192,000 (year 2017),  Truck Traffic: 5%,  Features Intersected: I 710 & SR 60,CONS,STS
Minimum Vertical Clearance: 10.30m (33.79ft),  Kilometerpoint: 24.640,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 37.8m (124.0ft)

Find on map >>   Show street view

Structure Number: 53 1714G,  Location: 07-LA-710-24.61-LA (Lat: 34.031997,  Lng: -118.169786),  Route carried "under" structure: County highway L700,  Year Built: 1967,  Structure Length: 0. m,  Average Daily Traffic: 12,000 (year 2009),  Truck Traffic: 2%,  Features Intersected: I 710 & SR 60,CONS,STS,  Facility Carried by Structure: N710-W60 CONNECTOR
Minimum Vertical Clearance: 7.62m (25.00ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 37.8m (124.0ft)

Find on map >>   Show street view

Structure Number: 53 1714G,  Location: 07-LA-710-24.61-LA (Lat: 34.031997,  Lng: -118.169786),  Route carried "under" structure: City street ,  Year Built: 1967,  Structure Length: 0. m,  Average Daily Traffic: 20,300 (year 2009),  Truck Traffic: 2%,  Features Intersected: I 710 & SR 60,CONS,STS,  Facility Carried by Structure: N710-W60 CONNECTOR
Minimum Vertical Clearance: 6.09m (19.98ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 37.8m (124.0ft)

Find on map >>   Show street view

Structure Number: 53 1714G,  Location: 07-LA-710-24.61-LA (Lat: 34.031997,  Lng: -118.169786),  Route carried "under" structure: County highway L713,  Year Built: 1967,  Structure Length: 0. m,  Average Daily Traffic: 28,000 (year 2009),  Truck Traffic: 3%,  Features Intersected: I 710 & SR 60,CONS,STS,  Facility Carried by Structure: N710-W60 CONNECTOR
Minimum Vertical Clearance: 12.19m (39.99ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 37.8m (124.0ft)

Find on map >>   Show street view

Structure Number: 53 1716F,  Location: 07-LA-710-24.64-LA (Lat: 34.036661,  Lng: -118.170853),  Route carried "under" structure: County highway L245,  Year Built: 1967,  Structure Length: 0. m,  Average Daily Traffic: 2,500 (year 2010),  Truck Traffic: 2%,  Features Intersected: I 710 & SR 60, 1ST ST,  Facility Carried by Structure: S710-E60 CONNECTOR
Minimum Vertical Clearance: 6.10m (20.01ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 35.1m (115.2ft)

Find on map >>   Show street view

Structure Number: 53 1716F,  Location: 07-LA-710-24.64-LA (Lat: 34.036661,  Lng: -118.170853),  Route carried "under" structure: County highway L713,  Year Built: 1967,  Structure Length: 0. m,  Average Daily Traffic: 25,000 (year 2010),  Truck Traffic: 2%,  Features Intersected: I 710 & SR 60, 1ST ST,  Facility Carried by Structure: S710-E60 CONNECTOR
Minimum Vertical Clearance: 7.62m (25.00ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 35.1m (115.2ft)

Find on map >>   Show street view

Structure Number: 53 1716F,  Location: 07-LA-710-24.64-LA (Lat: 34.036661,  Lng: -118.170853),  Route carried "under" structure: Ramp State highway 60,  Year Built: 1967,  Structure Length: 0. m,  Average Daily Traffic: 20,300 (year 2010),  Truck Traffic: 2%,  Features Intersected: I 710 & SR 60, 1ST ST
Minimum Vertical Clearance: 4.62m (15.16ft),  Kilometerpoint: 3.290,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 35.1m (115.2ft)

Find on map >>   Show street view

Structure Number: 53 1716F,  Location: 07-LA-710-24.64-LA (Lat: 34.036661,  Lng: -118.170853),  Route carried "under" structure: Ramp Interstate 60,  Year Built: 1967,  Structure Length: 0. m,  Average Daily Traffic: 19,800 (year 2010),  Truck Traffic: 2%,  Features Intersected: I 710 & SR 60, 1ST ST
Minimum Vertical Clearance: 4.47m (14.67ft),  Kilometerpoint: 3.290,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 35.1m (115.2ft)

Find on map >>   Show street view

Structure Number: 53 1727F,  Location: 07-LA-710-24.97-LA (Lat: 34.040367,  Lng: -118.170747),  Route carried "under" structure: County highway L342,  Year Built: 1967,  Structure Length: 0. m,  Average Daily Traffic: 16,400 (year 2010),  Truck Traffic: 10%,  Features Intersected: CESAR E CHAVEZ AVE,  Facility Carried by Structure: S710-W&E60 CONNECT
Minimum Vertical Clearance: 4.75m (15.58ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 26.5m (86.9ft)

Find on map >>   Show street view

Structure Number: 53 1763,  Location: 07-LA-170-R20.10-LA (Lat: 34.226719,  Lng: -118.410697),  Route carried "under" structure: City street L402,  Year Built: 1968,  Structure Length: 0. m,  Average Daily Traffic: 3,120 (year 2017),  Truck Traffic: 2%,  Features Intersected: ARLETA AVE & SHELDON ST,  Facility Carried by Structure: SR 170
Minimum Vertical Clearance: 4.60m (15.09ft),  Kilometerpoint: 0.000,  Lanes on structure: 8,  Lanes under structure: 5,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 37.5m (123.0ft)

Find on map >>   Show street view

Structure Number: 53 1763,  Location: 07-LA-170-R20.10-LA (Lat: 34.226719,  Lng: -118.410697),  Route carried "under" structure: City street L401,  Year Built: 1968,  Structure Length: 0. m,  Average Daily Traffic: 16,965 (year 2017),  Truck Traffic: 2%,  Features Intersected: ARLETA AVE & SHELDON ST,  Facility Carried by Structure: SR 170
Minimum Vertical Clearance: 4.60m (15.09ft),  Kilometerpoint: 0.000,  Lanes on structure: 8,  Lanes under structure: 5,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 37.5m (123.0ft)

Find on map >>   Show street view

Structure Number: 53 1782S,  Location: 07-LA-101-7.40-LA (Lat: 34.107444,  Lng: -118.329500),  Route carried "under" structure: City street L413,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 7,500 (year 2011),  Truck Traffic: 1%,  Features Intersected: HOLLY DR,  Facility Carried by Structure: NB 101 OFFRAMP
Minimum Vertical Clearance: 7.62m (25.00ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 2,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Length of Maximum Span: 19.3m (63.3ft)

Find on map >>   Show street view

Structure Number: 53 179,  Location: 07-LA-134-R5.67-LA (Lat: 34.152636,  Lng: -118.279978),  Route carried "under" structure: City street ,  Year Built: 1967,  Structure Length: 0. m,  Average Daily Traffic: 2,000 (year 2015),  Truck Traffic: 2%,  Features Intersected: LA RIV,UPRR,METRO,AMTRAK,  Facility Carried by Structure: STATE ROUTE 134
Minimum Vertical Clearance: 5.23m (17.16ft),  Kilometerpoint: 0.000,  Lanes on structure: 8,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 36.6m (120.1ft)

Find on map >>   Show street view

Structure Number: 53 179,  Location: 07-LA-134-R5.67-LA (Lat: 34.152636,  Lng: -118.279978),  Route carried "under" structure: City street ,  Year Built: 1967,  Structure Length: 0. m,  Average Daily Traffic: 900 (year 2015),  Truck Traffic: 2%,  Features Intersected: LA RIV,UPRR,METRO,AMTRAK,  Facility Carried by Structure: STATE ROUTE 134
Minimum Vertical Clearance: 7.62m (25.00ft),  Kilometerpoint: 0.000,  Lanes on structure: 8,  Lanes under structure: 6,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 36.6m (120.1ft)

Find on map >>   Show street view

Structure Number: 53 1790H,  Location: 07-LA-134-R5.67-LA (Lat: 34.151025,  Lng: -118.281914),  Route carried "under" structure: Ramp Interstate 5,  Year Built: 1967,  Structure Length: 0. m,  Average Daily Traffic: 36,500 (year 2017),  Truck Traffic: 2%,  Features Intersected: L A RIV,RTES 5&134,UP RR
Minimum Vertical Clearance: 4.90m (16.08ft),  Kilometerpoint: 26.600,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 37.8m (124.0ft)

Find on map >>   Show street view

Structure Number: 53 1790H,  Location: 07-LA-134-R5.67-LA (Lat: 34.151025,  Lng: -118.281914),  Route carried "under" structure: State highway 134,  Year Built: 1967,  Structure Length: 0. m,  Average Daily Traffic: 236,625 (year 2018),  Truck Traffic: 8%,  Features Intersected: L A RIV,RTES 5&134,UP RR
Minimum Vertical Clearance: 5.87m (19.26ft),  Kilometerpoint: 5.670,  Lanes on structure: 3,  Lanes under structure: 10,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 37.8m (124.0ft)

Find on map >>   Show street view

Structure Number: 53 1790H,  Location: 07-LA-134-R5.67-LA (Lat: 34.151025,  Lng: -118.281914),  Route carried "under" structure: Interstate 5,  Year Built: 1967,  Structure Length: 0. m,  Average Daily Traffic: 267,125 (year 2018),  Truck Traffic: 7%,  Features Intersected: L A RIV,RTES 5&134,UP RR
Minimum Vertical Clearance: 9.78m (32.09ft),  Kilometerpoint: 26.590,  Lanes on structure: 3,  Lanes under structure: 10,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 37.8m (124.0ft)

Find on map >>   Show street view

Structure Number: 53 1832,  Location: 07-LA-118-R1.78-LA (Lat: 34.277633,  Lng: -118.605164),  Route carried "under" structure: State highway 27,  Year Built: 1968,  Structure Length: 0. m,  Average Daily Traffic: 46,813 (year 2020),  Truck Traffic: 4%,  Features Intersected: SR 27(TOPANGA CANYON BL),  Facility Carried by Structure: STATE ROUTE 118
Minimum Vertical Clearance: 4.54m (14.90ft),  Kilometerpoint: 20.060,  Lanes on structure: 10,  Lanes under structure: 5,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 31.7m (104.0ft)

Find on map >>   Show street view

Structure Number: 53 1834L,  Location: 07-LA-001-26.91-LA (Lat: 33.944697,  Lng: -118.396531),  Route carried "under" structure: State highway 1,  Year Built: 1966,  Structure Length: 0. m,  Average Daily Traffic: 57,000 (year 2017),  Truck Traffic: 2%,  Features Intersected: ROUTE 1,  Facility Carried by Structure: CENTURY BLVD
Minimum Vertical Clearance: 4.59m (15.06ft),  Kilometerpoint: 26.910,  Lanes on structure: 3,  Lanes under structure: 6,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.9m (71.9ft)

Find on map >>   Show street view

Structure Number: 53 1834R,  Location: 07-LA-001-26.90-LA (Lat: 33.944333,  Lng: -118.396531),  Route carried "under" structure: State highway 1,  Year Built: 1966,  Structure Length: 0. m,  Average Daily Traffic: 28,900 (year 2017),  Truck Traffic: 2%,  Features Intersected: ROUTE 1,  Facility Carried by Structure: CENTURY BLVD
Minimum Vertical Clearance: 4.75m (15.58ft),  Kilometerpoint: 26.900,  Lanes on structure: 4,  Lanes under structure: 6,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.9m (71.9ft)

Find on map >>   Show street view

Structure Number: 53 1852F,  Location: 07-LA-405-25.91-LA (Lat: 33.987417,  Lng: -118.400133),  Route carried "under" structure: Ramp Interstate 405,  Year Built: 1967,  Structure Length: 0. m,  Average Daily Traffic: 10,000 (year 2015),  Truck Traffic: 1%,  Features Intersected: I405, JEFFERSON, RAMPS
Minimum Vertical Clearance: 7.62m (25.00ft),  Kilometerpoint: 25.910,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.5m (100.1ft)

Find on map >>   Show street view

Structure Number: 53 1852F,  Location: 07-LA-405-25.91-LA (Lat: 33.987417,  Lng: -118.400133),  Route carried "under" structure: Ramp Interstate 405,  Year Built: 1967,  Structure Length: 0. m,  Average Daily Traffic: 10,000 (year 2015),  Truck Traffic: 1%,  Features Intersected: I405, JEFFERSON, RAMPS
Minimum Vertical Clearance: 4.49m (14.73ft),  Kilometerpoint: 25.910,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.5m (100.1ft)

Find on map >>   Show street view

Structure Number: 53 1852F,  Location: 07-LA-405-25.91-LA (Lat: 33.987417,  Lng: -118.400133),  Route carried "under" structure: Interstate 405,  Year Built: 1967,  Structure Length: 0. m,  Average Daily Traffic: 284,000 (year 2019),  Truck Traffic: 4%,  Features Intersected: I405, JEFFERSON, RAMPS
Minimum Vertical Clearance: 4.69m (15.39ft),  Kilometerpoint: 25.910,  Lanes on structure: 2,  Lanes under structure: 8,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.5m (100.1ft)

Find on map >>   Show street view

Structure Number: 53 1852F,  Location: 07-LA-405-25.91-LA (Lat: 33.987417,  Lng: -118.400133),  Route carried "under" structure: Ramp Interstate 405,  Year Built: 1967,  Structure Length: 0. m,  Average Daily Traffic: 10,000 (year 2015),  Truck Traffic: 1%,  Features Intersected: I405, JEFFERSON, RAMPS
Minimum Vertical Clearance: 7.56m (24.80ft),  Kilometerpoint: 25.910,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.5m (100.1ft)

Find on map >>   Show street view

Structure Number: 53 1852F,  Location: 07-LA-405-25.91-LA (Lat: 33.987417,  Lng: -118.400133),  Route carried "under" structure: City street L104,  Year Built: 1967,  Structure Length: 0. m,  Average Daily Traffic: 10,000 (year 2015),  Truck Traffic: 1%,  Features Intersected: I405, JEFFERSON, RAMPS,  Facility Carried by Structure: S405-E90 CONN OC
Minimum Vertical Clearance: 7.56m (24.80ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.5m (100.1ft)

Find on map >>   Show street view

Structure Number: 53 1853G,  Location: 07-LA-090-2.58-LA (Lat: 33.987272,  Lng: -118.400506),  Route carried "under" structure: City street L104,  Year Built: 1967,  Structure Length: 0. m,  Average Daily Traffic: 154,000 (year 2011),  Truck Traffic: 2%,  Features Intersected: JEFFERSON BLVD,  Facility Carried by Structure: E90-S405 CONNECTOR
Minimum Vertical Clearance: 7.62m (25.00ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 7,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 39.3m (128.9ft)

Find on map >>   Show street view

Structure Number: 53 1856,  Location: 07-LA-010-19.98-LA (Lat: 34.056028,  Lng: -118.187150),  Route carried "under" structure: Interstate 10,  Year Built: 1966,  Structure Length: 0. m,  Average Daily Traffic: 6,200 (year 2005),  Truck Traffic: 5%,  Features Intersected: INTERSTATE 10,  Facility Carried by Structure: PEDESTRIAN WALKWAY
Minimum Vertical Clearance: 7.00m (22.97ft),  Kilometerpoint: 19.980,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 50.6m (166.0ft)

Find on map >>   Show street view

Structure Number: 53 1856,  Location: 07-LA-010-19.98-LA (Lat: 34.056028,  Lng: -118.187150),  Route carried "under" structure: Interstate 10,  Year Built: 1966,  Structure Length: 0. m,  Average Daily Traffic: 260,000 (year 2005),  Truck Traffic: 6%,  Features Intersected: INTERSTATE 10,  Facility Carried by Structure: PEDESTRIAN WALKWAY
Minimum Vertical Clearance: 6.05m (19.85ft),  Kilometerpoint: 19.980,  Lanes under structure: 12,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 50.6m (166.0ft)

Find on map >>   Show street view

Structure Number: 53 1896,  Location: 07-LA-210-R3.57-LA (Lat: 34.313914,  Lng: -118.435994),  Route carried "under" structure: Interstate 210,  Year Built: 1969,  Structure Length: 0. m,  Average Daily Traffic: 76,000 (year 2009),  Truck Traffic: 8%,  Features Intersected: INTERSTATE 210,  Facility Carried by Structure: PEDESTRIAN WALKWAY
Minimum Vertical Clearance: 5.81m (19.06ft),  Kilometerpoint: 3.570,  Lanes under structure: 7,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 23.8m (78.1ft)

Find on map >>   Show street view

Structure Number: 53 1897,  Location: 07-LA-210-R4.70-LA (Lat: 34.302131,  Lng: -118.422175),  Route carried "under" structure: Interstate 210,  Year Built: 1969,  Structure Length: 0. m,  Average Daily Traffic: 76,000 (year 2009),  Truck Traffic: 8%,  Features Intersected: INTERSTATE 210,  Facility Carried by Structure: PEDESTRIAN WALKWAY
Minimum Vertical Clearance: 5.56m (18.24ft),  Kilometerpoint: 4.700,  Lanes under structure: 7,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 25.0m (82.0ft)

Find on map >>   Show street view

Structure Number: 53 1915,  Location: 07-LA-002-R18.52-LA (Lat: 34.142539,  Lng: -118.227325),  Route carried "under" structure: City street L485,  Year Built: 1976,  Structure Length: 0. m,  Average Daily Traffic: 18,000 (year 2011),  Truck Traffic: 2%,  Features Intersected: COLORADO BLVD,  Facility Carried by Structure: SR 2
Minimum Vertical Clearance: 7.62m (25.00ft),  Kilometerpoint: 0.000,  Lanes on structure: 9,  Lanes under structure: 6,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 60.7m (199.1ft)

Find on map >>   Show street view

Structure Number: 53 1915G,  Location: 07-LA-002-R18.52-LA (Lat: 34.142558,  Lng: -118.227117),  Route carried "under" structure: City street L485,  Year Built: 1976,  Structure Length: 0. m,  Average Daily Traffic: 18,000 (year 2011),  Truck Traffic: 2%,  Features Intersected: COLORADO BLVD,  Facility Carried by Structure: E2-E134 CONNECTOR
Minimum Vertical Clearance: 7.62m (25.00ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 58.5m (191.9ft)

Find on map >>   Show street view

Structure Number: 53 1916,  Location: 07-LA-002-R18.65-LA (Lat: 34.144156,  Lng: -118.226797),  Route carried "under" structure: City street L490,  Year Built: 1976,  Structure Length: 0. m,  Average Daily Traffic: 21,420 (year 2013),  Truck Traffic: 2%,  Features Intersected: BROADWAY UC,  Facility Carried by Structure: ROUTE 2
Minimum Vertical Clearance: 7.62m (25.00ft),  Kilometerpoint: 0.000,  Lanes on structure: 9,  Lanes under structure: 5,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 60.0m (196.9ft)

Find on map >>   Show street view

Structure Number: 53 1917F,  Location: 07-LA-134-R9.04-LA (Lat: 34.142525,  Lng: -118.227936),  Route carried "under" structure: Ramp State highway 134,  Year Built: 1976,  Structure Length: 0. m,  Average Daily Traffic: 11,800 (year 2010),  Truck Traffic: 3%,  Features Intersected: RTE 2,BROADWAY,COLORADO
Minimum Vertical Clearance: 4.75m (15.58ft),  Kilometerpoint: 8.970,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 54.9m (180.1ft)

Find on map >>   Show street view

Structure Number: 53 1917F,  Location: 07-LA-134-R9.04-LA (Lat: 34.142525,  Lng: -118.227936),  Route carried "under" structure: State highway 2,  Year Built: 1976,  Structure Length: 0. m,  Average Daily Traffic: 213,000 (year 2020),  Truck Traffic: 2%,  Features Intersected: RTE 2,BROADWAY,COLORADO
Minimum Vertical Clearance: 4.87m (15.98ft),  Kilometerpoint: 18.720,  Lanes on structure: 2,  Lanes under structure: 10,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 54.9m (180.1ft)

Find on map >>   Show street view

Structure Number: 53 1917F,  Location: 07-LA-134-R9.04-LA (Lat: 34.142525,  Lng: -118.227936),  Route carried "under" structure: Ramp State highway 2,  Year Built: 1976,  Structure Length: 0. m,  Average Daily Traffic: 13,800 (year 2010),  Truck Traffic: 3%,  Features Intersected: RTE 2,BROADWAY,COLORADO
Minimum Vertical Clearance: 4.85m (15.91ft),  Kilometerpoint: 18.740,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 54.9m (180.1ft)

Find on map >>   Show street view

Structure Number: 53 1919,  Location: 07-LA-134-R8.96-LA (Lat: 34.146672,  Lng: -118.226778),  Route carried "under" structure: Ramp State highway 2,  Year Built: 1971,  Structure Length: 0. m,  Average Daily Traffic: 13,800 (year 2017),  Truck Traffic: 3%,  Features Intersected: STATE ROUTE 2 & RAMP,  Facility Carried by Structure: STATE ROUTE 134
Minimum Vertical Clearance: 6.25m (20.51ft),  Kilometerpoint: 18.810,  Lanes on structure: 9,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 34.6m (113.5ft)

Find on map >>   Show street view

Structure Number: 53 1919,  Location: 07-LA-134-R8.96-LA (Lat: 34.146672,  Lng: -118.226778),  Route carried "under" structure: State highway 2,  Year Built: 1971,  Structure Length: 0. m,  Average Daily Traffic: 148,125 (year 2017),  Truck Traffic: 3%,  Features Intersected: STATE ROUTE 2 & RAMP,  Facility Carried by Structure: STATE ROUTE 134
Minimum Vertical Clearance: 5.11m (16.77ft),  Kilometerpoint: 18.810,  Lanes on structure: 9,  Lanes under structure: 9,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 34.6m (113.5ft)

Find on map >>   Show street view

Structure Number: 53 1919S,  Location: 07-LA-134-R8.97-LA (Lat: 34.146469,  Lng: -118.226756),  Route carried "under" structure: State highway 2,  Year Built: 1971,  Structure Length: 0. m,  Average Daily Traffic: 166,000 (year 2020),  Truck Traffic: 2%,  Features Intersected: STATE ROUTE 2 & RAMP
Minimum Vertical Clearance: 4.62m (15.16ft),  Kilometerpoint: 18.800,  Lanes on structure: 2,  Lanes under structure: 9,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 30.2m (99.1ft)

Find on map >>   Show street view

Structure Number: 53 1919S,  Location: 07-LA-134-R8.97-LA (Lat: 34.146469,  Lng: -118.226756),  Route carried "under" structure: Ramp State highway 2,  Year Built: 1971,  Structure Length: 0. m,  Average Daily Traffic: 18,285 (year 2017),  Truck Traffic: 3%,  Features Intersected: STATE ROUTE 2 & RAMP
Minimum Vertical Clearance: 7.62m (25.00ft),  Kilometerpoint: 18.800,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 30.2m (99.1ft)

Find on map >>   Show street view

Structure Number: 53 1920G,  Location: 07-LA-002-R18.82-LA (Lat: 34.147239,  Lng: -118.226581),  Route carried "under" structure: State highway 2,  Year Built: 1971,  Structure Length: 0. m,  Average Daily Traffic: 8,841 (year 2014),  Truck Traffic: 5%,  Features Intersected: ROUTE 2 & CONNECTOR RAMP
Minimum Vertical Clearance: 5.59m (18.34ft),  Kilometerpoint: 18.820,  Lanes on structure: 2,  Lanes under structure: 11,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 35.4m (116.1ft)

Find on map >>   Show street view

Structure Number: 53 1921F,  Location: 07-LA-002-R18.81-LA (Lat: 34.147531,  Lng: -118.226792),  Route carried "under" structure: Ramp State highway 2,  Year Built: 1971,  Structure Length: 0. m,  Average Daily Traffic: 24,660 (year 2014),  Truck Traffic: 5%,  Features Intersected: ROUTES 134 & 2, & CONNS
Minimum Vertical Clearance: 6.04m (19.82ft),  Kilometerpoint: 18.810,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 54.9m (180.1ft)

Find on map >>   Show street view

Structure Number: 53 1921F,  Location: 07-LA-002-R18.81-LA (Lat: 34.147531,  Lng: -118.226792),  Route carried "under" structure: State highway 2,  Year Built: 1971,  Structure Length: 0. m,  Average Daily Traffic: 143,000 (year 2021),  Truck Traffic: 5%,  Features Intersected: ROUTES 134 & 2, & CONNS
Minimum Vertical Clearance: 5.25m (17.22ft),  Kilometerpoint: 18.810,  Lanes on structure: 2,  Lanes under structure: 9,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 54.9m (180.1ft)

Find on map >>   Show street view

Structure Number: 53 1921F,  Location: 07-LA-002-R18.81-LA (Lat: 34.147531,  Lng: -118.226792),  Route carried "under" structure: Ramp State highway 134,  Year Built: 1971,  Structure Length: 0. m,  Average Daily Traffic: 4,621 (year 2014),  Truck Traffic: 3%,  Features Intersected: ROUTES 134 & 2, & CONNS
Minimum Vertical Clearance: 7.62m (25.00ft),  Kilometerpoint: 8.980,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 54.9m (180.1ft)

Find on map >>   Show street view

Structure Number: 53 1921F,  Location: 07-LA-002-R18.81-LA (Lat: 34.147531,  Lng: -118.226792),  Route carried "under" structure: State highway 134,  Year Built: 1971,  Structure Length: 0. m,  Average Daily Traffic: 18,261 (year 2014),  Truck Traffic: 6%,  Features Intersected: ROUTES 134 & 2, & CONNS
Minimum Vertical Clearance: 4.70m (15.42ft),  Kilometerpoint: 8.980,  Lanes on structure: 2,  Lanes under structure: 11,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 54.9m (180.1ft)

Find on map >>   Show street view

Structure Number: 53 1922,  Location: 07-LA-110-R1.06-LA (Lat: 33.750794,  Lng: -118.291850),  Route carried "under" structure: Ramp State highway 47,  Year Built: 1970,  Structure Length: 0. m,  Average Daily Traffic: 30,000 (year 2015),  Truck Traffic: 6%,  Features Intersected: INTERSTATE 110,  Facility Carried by Structure: MACARTHUR
Minimum Vertical Clearance: 8.56m (28.08ft),  Kilometerpoint: 0.090,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 40.8m (133.9ft)

Find on map >>   Show street view

Structure Number: 53 1922,  Location: 07-LA-110-R1.06-LA (Lat: 33.750794,  Lng: -118.291850),  Route carried "under" structure: Ramp Interstate 110,  Year Built: 1970,  Structure Length: 0. m,  Average Daily Traffic: 30,000 (year 2015),  Truck Traffic: 6%,  Features Intersected: INTERSTATE 110,  Facility Carried by Structure: MACARTHUR
Minimum Vertical Clearance: 8.56m (28.08ft),  Kilometerpoint: 1.060,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 40.8m (133.9ft)

Find on map >>   Show street view

Structure Number: 53 1922,  Location: 07-LA-110-R1.06-LA (Lat: 33.750794,  Lng: -118.291850),  Route carried "under" structure: Interstate 110,  Year Built: 1970,  Structure Length: 0. m,  Average Daily Traffic: 72,000 (year 2015),  Truck Traffic: 4%,  Features Intersected: INTERSTATE 110,  Facility Carried by Structure: MACARTHUR
Minimum Vertical Clearance: 8.53m (27.99ft),  Kilometerpoint: 1.060,  Lanes on structure: 2,  Lanes under structure: 9,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 40.8m (133.9ft)

Find on map >>   Show street view

Structure Number: 53 1922,  Location: 07-LA-110-R1.06-LA (Lat: 33.750794,  Lng: -118.291850),  Route carried "under" structure: Ramp State highway 47,  Year Built: 1970,  Structure Length: 0. m,  Average Daily Traffic: 2 (year 2015),  Truck Traffic: 1%,  Features Intersected: INTERSTATE 110,  Facility Carried by Structure: MACARTHUR
Minimum Vertical Clearance: 8.56m (28.08ft),  Kilometerpoint: 0.090,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 40.8m (133.9ft)

Find on map >>   Show street view

Structure Number: 53 1924L,  Location: 07-LA-210-R1.92-LA (Lat: 34.323750,  Lng: -118.460567),  Route carried "under" structure: City street L615,  Year Built: 1969,  Structure Length: 0. m,  Average Daily Traffic: 4,200 (year 2016),  Truck Traffic: 2%,  Features Intersected: ROXFORD STREET,  Facility Carried by Structure: INTERSTATE 210 WB
Minimum Vertical Clearance: 4.74m (15.55ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 6,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 44.4m (145.7ft)

Find on map >>   Show street view

Structure Number: 53 1924R,  Location: 07-LA-210-R1.92-LA (Lat: 34.323525,  Lng: -118.460561),  Route carried "under" structure: City street L615,  Year Built: 1969,  Structure Length: 0. m,  Average Daily Traffic: 4,200 (year 2016),  Truck Traffic: 2%,  Features Intersected: ROXFORD STREET,  Facility Carried by Structure: INTERSTATE 210 EB
Minimum Vertical Clearance: 5.72m (18.77ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 6,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 47.8m (156.8ft)

Find on map >>   Show street view

Structure Number: 53 1925,  Location: 07-LA-210-R3.01-LA (Lat: 34.319550,  Lng: -118.442981),  Route carried "under" structure: Interstate 210,  Year Built: 1969,  Structure Length: 0. m,  Average Daily Traffic: 76,000 (year 2009),  Truck Traffic: 8%,  Features Intersected: INTERSTATE 210,  Facility Carried by Structure: PEDESTRIAN WALKWAY
Minimum Vertical Clearance: 5.74m (18.83ft),  Kilometerpoint: 3.010,  Lanes under structure: 7,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 23.8m (78.1ft)

Find on map >>   Show street view

Structure Number: 53 1926,  Location: 07-LA-210-R2.74-LA (Lat: 34.322136,  Lng: -118.446608),  Route carried "under" structure: Interstate 210,  Year Built: 1969,  Structure Length: 0. m,  Average Daily Traffic: 82,000 (year 2016),  Truck Traffic: 8%,  Features Intersected: INTERSTATE 210,  Facility Carried by Structure: BLEDSOE ST OC
Minimum Vertical Clearance: 5.72m (18.77ft),  Kilometerpoint: 2.740,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 32.6m (107.0ft)

Find on map >>   Show street view

Structure Number: 53 1927,  Location: 07-LA-210-R3.84-LA (Lat: 34.311339,  Lng: -118.432572),  Route carried "under" structure: Interstate 210,  Year Built: 1969,  Structure Length: 0. m,  Average Daily Traffic: 76,000 (year 2017),  Truck Traffic: 8%,  Features Intersected: INTERSTATE 210,  Facility Carried by Structure: SAYRE ST OC
Minimum Vertical Clearance: 5.33m (17.49ft),  Kilometerpoint: 3.840,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 36.0m (118.1ft)

Find on map >>   Show street view

Structure Number: 53 1928,  Location: 07-LA-210-R4.11-LA (Lat: 34.308558,  Lng: -118.429261),  Route carried "under" structure: Interstate 210,  Year Built: 1969,  Structure Length: 0. m,  Average Daily Traffic: 76,000 (year 2017),  Truck Traffic: 8%,  Features Intersected: INTERSTATE 210,  Facility Carried by Structure: HUBBARD ST
Minimum Vertical Clearance: 5.64m (18.50ft),  Kilometerpoint: 4.110,  Lanes on structure: 6,  Lanes under structure: 6,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 31.7m (104.0ft)

Find on map >>   Show street view

Structure Number: 53 1936,  Location: 07-LA-014-R25.13 (Lat: 34.338378,  Lng: -118.506842),  Route carried "under" structure: County highway L639,  Year Built: 1971,  Structure Length: 0. m,  Average Daily Traffic: 6,699 (year 2021),  Truck Traffic: 2%,  Features Intersected: SIERRA HWY,  Facility Carried by Structure: STATE ROUTE 14
Minimum Vertical Clearance: 7.62m (25.00ft),  Kilometerpoint: 0.000,  Lanes on structure: 11,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 31.9m (104.7ft)

Find on map >>   Show street view

Structure Number: 53 1936G,  Location: 07-LA-005S-C45.74-LA (Lat: 34.338314,  Lng: -118.506444),  Route carried "under" structure: County highway L639,  Year Built: 1971,  Structure Length: 0. m,  Average Daily Traffic: 3,642 (year 2011),  Truck Traffic: 2%,  Features Intersected: SIERRA HWY,  Facility Carried by Structure: N5TRUCK-N14
Minimum Vertical Clearance: 7.62m (25.00ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 32.3m (106.0ft)

Find on map >>   Show street view

Structure Number: 53 1938,  Location: 07-LA-110-R1.25-LA (Lat: 33.753261,  Lng: -118.290947),  Route carried "under" structure: City street ,  Year Built: 1970,  Structure Length: 0. m,  Average Daily Traffic: 30,000 (year 2015),  Truck Traffic: 5%,  Features Intersected: CHANNEL ST & UP RR SPUR,  Facility Carried by Structure: INTERSTATE 110
Minimum Vertical Clearance: 7.92m (25.98ft),  Kilometerpoint: 0.000,  Lanes on structure: 6,  Lanes under structure: 6,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 50.3m (165.0ft)

Find on map >>   Show street view

Structure Number: 53 1938K,  Location: 07-LA-110-R1.25-LA (Lat: 33.753586,  Lng: -118.291436),  Route carried "under" structure: City street ,  Year Built: 1970,  Structure Length: 0. m,  Average Daily Traffic: 30,000 (year 2015),  Truck Traffic: 5%,  Features Intersected: UP RR SPUR & CHANNEL ST,  Facility Carried by Structure: S110-GAFFEY ST OFF
Minimum Vertical Clearance: 5.56m (18.24ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 6,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 50.6m (166.0ft)

Find on map >>   Show street view

Structure Number: 53 1939,  Location: 07-LA-134-R9.08-LA (Lat: 34.146258,  Lng: -118.225403),  Route carried "under" structure: Ramp State highway 134,  Year Built: 1971,  Structure Length: 0. m,  Average Daily Traffic: 25,930 (year 2010),  Truck Traffic: 6%,  Features Intersected: W134-W2 CONNECTOR RAMP
Minimum Vertical Clearance: 4.52m (14.83ft),  Kilometerpoint: 9.080,  Lanes on structure: 11,  Lanes under structure: 2,  Material/Design: Concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 25.8m (84.6ft)

Find on map >>   Show street view

Structure Number: 53 1942G,  Location: 07-LA-002-R18.64-LA (Lat: 34.143958,  Lng: -118.226528),  Route carried "under" structure: City street L490,  Year Built: 1976,  Structure Length: 0. m,  Average Daily Traffic: 23,400 (year 2014),  Truck Traffic: 2%,  Features Intersected: BROADWAY,  Facility Carried by Structure: E2-E134 CONNECTOR
Minimum Vertical Clearance: 7.62m (25.00ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 5,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 54.6m (179.1ft)

Find on map >>   Show street view

Structure Number: 53 1944,  Location: 07-LA-110-R0.92-LA (Lat: 33.748661,  Lng: -118.290719),  Route carried "under" structure: Ramp Interstate 110,  Year Built: 1970,  Structure Length: 0. m,  Average Daily Traffic: 30,000 (year 2015),  Truck Traffic: 6%,  Features Intersected: S110-E47 CONNECTOR RAMP
Minimum Vertical Clearance: 4.62m (15.16ft),  Kilometerpoint: 0.920,  Lanes on structure: 5,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 44.8m (147.0ft)

Find on map >>   Show street view

Structure Number: 53 1945F,  Location: 07-LA-047-L0.22-LA (Lat: 33.748600,  Lng: -118.291197),  Route carried "under" structure: State highway 110,  Year Built: 1970,  Structure Length: 0. m,  Average Daily Traffic: 44,250 (year 2020),  Truck Traffic: 3%,  Features Intersected: STATE ROUTE 110,  Facility Carried by Structure: S47-GAFFEY OFF RMP
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 0.920,  Lanes on structure: 2,  Lanes under structure: 5,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 48.5m (159.1ft)

Find on map >>   Show street view

Structure Number: 53 195,  Location: 07-LA-090-2.33-LA (Lat: 33.987953,  Lng: -118.404167),  Route carried "under" structure: City street Q659,  Year Built: 1968,  Structure Length: 0. m,  Average Daily Traffic: 1,000 (year 2011),  Truck Traffic: 2%,  Features Intersected: MESMER AVE,  Facility Carried by Structure: STATE ROUTE 90
Minimum Vertical Clearance: 5.05m (16.57ft),  Kilometerpoint: 0.000,  Lanes on structure: 10,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 21.9m (71.9ft)

Find on map >>   Show street view

Structure Number: 53 1951L,  Location: 07-LA-210-R1.40-LA (Lat: 34.323517,  Lng: -118.469756),  Route carried "under" structure: City street L583,  Year Built: 1969,  Structure Length: 0. m,  Average Daily Traffic: 3,073 (year 2016),  Truck Traffic: 2%,  Features Intersected: GLENOAKS BLVD,  Facility Carried by Structure: INTERSTATE 210 WB
Minimum Vertical Clearance: 4.78m (15.68ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 38.2m (125.3ft)

Find on map >>   Show street view

Structure Number: 53 1951R,  Location: 07-LA-210-R1.40-LA (Lat: 34.323303,  Lng: -118.469747),  Route carried "under" structure: City street L583,  Year Built: 1969,  Structure Length: 0. m,  Average Daily Traffic: 3,073 (year 2016),  Truck Traffic: 2%,  Features Intersected: GLENOAKS BLVD,  Facility Carried by Structure: INTERSTATE 210 EB
Minimum Vertical Clearance: 5.89m (19.32ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 5,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 40.3m (132.2ft)

Find on map >>   Show street view

Structure Number: 53 1952,  Location: 07-LA-090-R2.01-LA (Lat: 33.987514,  Lng: -118.409878),  Route carried "under" structure: City street L117,  Year Built: 1968,  Structure Length: 0. m,  Average Daily Traffic: 6,000 (year 2011),  Truck Traffic: 2%,  Features Intersected: INGLEWOOD BLVD,  Facility Carried by Structure: STATE ROUTE 90
Minimum Vertical Clearance: 5.15m (16.90ft),  Kilometerpoint: 0.000,  Lanes on structure: 8,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 32.1m (105.3ft)

Find on map >>   Show street view

Structure Number: 53 1961G,  Location: 07-LA-005S-C45.63-LA (Lat: 34.334800,  Lng: -118.505389),  Route carried "under" structure: Ramp Interstate 5,  Year Built: 1971,  Structure Length: 0. m,  Average Daily Traffic: 4,930 (year 2011),  Truck Traffic: 2%,  Features Intersected: SIERRA HWY-N5 ON-RAMP
Minimum Vertical Clearance: 7.51m (24.64ft),  Kilometerpoint: 45.630,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 18.9m (62.0ft)

Find on map >>   Show street view

Structure Number: 53 1962F,  Location: 07-LA-014-R24.81-LA (Lat: 34.333131,  Lng: -118.505342),  Route carried "under" structure: Interstate 5,  Year Built: 1971,  Structure Length: 0. m,  Average Daily Traffic: 201,500 (year 2021),  Truck Traffic: 2%,  Features Intersected: ROUTE 5 TRK, SIERRA HWY
Minimum Vertical Clearance: 6.22m (20.41ft),  Kilometerpoint: 45.740,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 41.5m (136.2ft)

Find on map >>   Show street view

Structure Number: 53 1962F,  Location: 07-LA-014-R24.81-LA (Lat: 34.333131,  Lng: -118.505342),  Route carried "under" structure: City street L639,  Year Built: 1971,  Structure Length: 0. m,  Average Daily Traffic: 7,905 (year 2021),  Truck Traffic: 12%,  Features Intersected: ROUTE 5 TRK, SIERRA HWY,  Facility Carried by Structure: S14 TRK-S5 TRK CON
Minimum Vertical Clearance: 6.17m (20.24ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 41.5m (136.2ft)

Find on map >>   Show street view

Structure Number: 53 1984L,  Location: 07-LA-005-R44.87-LA (Lat: 34.324583,  Lng: -118.502414),  Route carried "under" structure: County highway L352,  Year Built: 1971,  Structure Length: 0. m,  Average Daily Traffic: 7,500 (year 2018),  Truck Traffic: 2%,  Features Intersected: METROLINK,UP RR,SAN FERN,  Facility Carried by Structure: INTERSTATE 5 SB
Minimum Vertical Clearance: 7.62m (25.00ft),  Kilometerpoint: 0.000,  Lanes on structure: 9,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 41.2m (135.2ft)

Find on map >>   Show street view

Structure Number: 53 1984R,  Location: 07-LA-005-R44.87 (Lat: 34.325172,  Lng: -118.502492),  Route carried "under" structure: County highway L352,  Year Built: 1971,  Structure Length: 0. m,  Average Daily Traffic: 7,500 (year 2018),  Truck Traffic: 2%,  Features Intersected: METROLINK,UP RR,SAN FERN,  Facility Carried by Structure: INTERSTATE 5 NB
Minimum Vertical Clearance: 7.62m (25.00ft),  Kilometerpoint: 0.000,  Lanes on structure: 9,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 48.8m (160.1ft)

Find on map >>   Show street view

Structure Number: 53 1985F,  Location: 07-LA-005-R44.01-LA (Lat: 34.316503,  Lng: -118.489767),  Route carried "under" structure: Interstate 5,  Year Built: 1975,  Structure Length: 0. m,  Average Daily Traffic: 281,078 (year 2011),  Truck Traffic: 9%,  Features Intersected: I 5 & CONNECTORS
Minimum Vertical Clearance: 4.78m (15.68ft),  Kilometerpoint: 44.010,  Lanes on structure: 4,  Lanes under structure: 8,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 53.5m (175.5ft)

Find on map >>   Show street view

Structure Number: 53 1985F,  Location: 07-LA-005-R44.01-LA (Lat: 34.316503,  Lng: -118.489767),  Route carried "under" structure: Bypass Interstate 5,  Year Built: 1975,  Structure Length: 0. m,  Average Daily Traffic: 17,800 (year 2014),  Truck Traffic: 5%,  Features Intersected: I 5 & CONNECTORS
Minimum Vertical Clearance: 5.89m (19.32ft),  Kilometerpoint: 44.010,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 53.5m (175.5ft)

Find on map >>   Show street view

Structure Number: 53 1986,  Location: 07-LA-005-R44.43-LA (Lat: 34.320819,  Lng: -118.496169),  Route carried "under" structure: Interstate 5,  Year Built: 1971,  Structure Length: 0. m,  Average Daily Traffic: 281,078 (year 2011),  Truck Traffic: 9%,  Features Intersected: I5,I5 TRUCK,CO RD,UP RR,  Facility Carried by Structure: BALBOA BLVD
Minimum Vertical Clearance: 5.05m (16.57ft),  Kilometerpoint: 44.430,  Lanes on structure: 2,  Lanes under structure: 19,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 35.2m (115.5ft)

Find on map >>   Show street view

Structure Number: 53 1988F,  Location: 07-LA-210-R0.12-LA (Lat: 34.317089,  Lng: -118.489464),  Route carried "under" structure: Ramp Interstate 210,  Year Built: 1971,  Structure Length: 0. m,  Average Daily Traffic: 15,600 (year 2016),  Truck Traffic: 8%,  Features Intersected: W210-N5 CONNECTOR RAMP
Minimum Vertical Clearance: 6.41m (21.03ft),  Kilometerpoint: 0.120,  Lanes on structure: 2,  Lanes under structure: 3,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 27.7m (90.9ft)

Find on map >>   Show street view

Structure Number: 53 1989F,  Location: 07-LA-210-R0.06-LA (Lat: 34.314636,  Lng: -118.490053),  Route carried "under" structure: Ramp Interstate 210,  Year Built: 1975,  Structure Length: 0. m,  Average Daily Traffic: 16,425 (year 2016),  Truck Traffic: 2%,  Features Intersected: I5,I210,ST,UPRR,I5 TRUCK
Minimum Vertical Clearance: 5.41m (17.75ft),  Kilometerpoint: 0.060,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 40.2m (131.9ft)

Find on map >>   Show street view

Structure Number: 53 1989F,  Location: 07-LA-210-R0.06-LA (Lat: 34.314636,  Lng: -118.490053),  Route carried "under" structure: Interstate 5,  Year Built: 1975,  Structure Length: 0. m,  Average Daily Traffic: 277,000 (year 2016),  Truck Traffic: 9%,  Features Intersected: I5,I210,ST,UPRR,I5 TRUCK
Minimum Vertical Clearance: 7.62m (25.00ft),  Kilometerpoint: 43.990,  Lanes on structure: 2,  Lanes under structure: 11,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 40.2m (131.9ft)

Find on map >>   Show street view

Structure Number: 53 1991F,  Location: 07-LA-210-R0.02-LA (Lat: 34.317939,  Lng: -118.491356),  Route carried "under" structure: Bypass Interstate 5,  Year Built: 1971,  Structure Length: 0. m,  Average Daily Traffic: 17,800 (year 2014),  Truck Traffic: 2%,  Features Intersected: I 5 TRUCK NBND
Minimum Vertical Clearance: 5.18m (16.99ft),  Kilometerpoint: 44.080,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 32.6m (107.0ft)

Find on map >>   Show street view

Structure Number: 53 2016L,  Location: 07-LA-210-R0.43-LA (Lat: 34.319144,  Lng: -118.484917),  Route carried "under" structure: County highway L594,  Year Built: 1971,  Structure Length: 0. m,  Average Daily Traffic: 2,800 (year 2016),  Truck Traffic: 2%,  Features Intersected: FOOTHILL BLVD,  Facility Carried by Structure: INTERSTATE 210 WB
Minimum Vertical Clearance: 5.54m (18.18ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 27.7m (90.9ft)

Find on map >>   Show street view

Structure Number: 53 2016R,  Location: 07-LA-210-R0.43-LA (Lat: 34.319228,  Lng: -118.484458),  Route carried "under" structure: County highway L594,  Year Built: 1971,  Structure Length: 0. m,  Average Daily Traffic: 2,800 (year 2016),  Truck Traffic: 2%,  Features Intersected: FOOTHILL BLVD,  Facility Carried by Structure: INTERSTATE 210 EB
Minimum Vertical Clearance: 4.70m (15.42ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 31.4m (103.0ft)

Discuss Los Angeles, California (CA) on our hugely popular California forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.