Bridge Statistics for Los Angeles, California (CA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs
- National Bridge Inventory (NBI) Statistics
- 2,325Number of bridges
- 39,718ft / 12,106mTotal length
- $98,718,000Total costs
- 180,570,830Total average daily traffic
- 9,950,919Total average daily truck traffic
- National Bridge Inventory (NBI) Registered Bridges for Los Angeles
- No street view available for this location
- New bridges - historical statistics
- 121900-1909
- 41910-1919
- 431920-1929
- 721930-1939
- 1701940-1949
- 5201950-1959
- 6961960-1969
- 3091970-1979
- 1881980-1989
- 2231990-1999
- 512000-2009
- 372010-2019
- Reconstructed bridges - Historical Statistics
- 11920-1929
- 31930-1939
- 51940-1949
- 181950-1959
- 501960-1969
- 341970-1979
- 461980-1989
- 421990-1999
- 702000-2009
- 132010-2019
- Bridge Condition - Deck
- 81.7%Good
- 1.1%Satisfactory
- 15.5%Fair
- 1.7%Poor
- Bridge Condition - Superstructure
- 0.5%Very good
- 89.2%Good
- 1.1%Satisfactory
- 9.2%Fair
- Bridge Condition - Substructure
- 94.1%Good
- 2.3%Satisfactory
- 3.4%Fair
- 0.2%Poor
- Bridge Condition - Channel
- 16.2%Excellent
- 77.2%Very good
- 2.7%Good
- 2.2%Satisfactory
- 1.7%Fair
- 0.5%Poor
- 0.2%Serious
- Bridge Condition - Culverts
- 76.5%Good
- 23.5%Satisfactory
Find on map >> Show street view
Structure Number: 53 2405R, Location: 07-LA-105-R7.26-LA (Lat: 33.928361, Lng: -118.282911), Route carried "under" structure: Ramp Interstate 110, Year Built: 1986, Structure Length: 0. m, Average Daily Traffic: 93,700 (year 2006), Truck Traffic: 2%, Features Intersected: I 110,S110-E105,FIGUEROA, Facility Carried by Structure: E105 & LRT
Minimum Vertical Clearance: 5.15m (16.90ft), Kilometerpoint: 13.820, Lanes on structure: 5, Lanes under structure: 2, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 57.0m (187.0ft)
Structure Number: 53 2405R, Location: 07-LA-105-R7.26-LA (Lat: 33.928361, Lng: -118.282911), Route carried "under" structure: Ramp Interstate 110, Year Built: 1986, Structure Length: 0. m, Average Daily Traffic: 93,700 (year 2006), Truck Traffic: 2%, Features Intersected: I 110,S110-E105,FIGUEROA, Facility Carried by Structure: E105 & LRT
Minimum Vertical Clearance: 5.15m (16.90ft), Kilometerpoint: 13.820, Lanes on structure: 5, Lanes under structure: 2, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 57.0m (187.0ft)
Find on map >> Show street view
Structure Number: 53 2406F, Location: 07-LA-110-13.90-LA (Lat: 33.930072, Lng: -118.281347), Route carried "under" structure: Ramp Interstate 110, Year Built: 1991, Structure Length: 0. m, Average Daily Traffic: 25,000 (year 2020), Truck Traffic: 2%, Features Intersected: I 110,BUS,HOV,N110-W105
Minimum Vertical Clearance: 5.11m (16.77ft), Kilometerpoint: 13.900, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 54.5m (178.8ft)
Structure Number: 53 2406F, Location: 07-LA-110-13.90-LA (Lat: 33.930072, Lng: -118.281347), Route carried "under" structure: Ramp Interstate 110, Year Built: 1991, Structure Length: 0. m, Average Daily Traffic: 25,000 (year 2020), Truck Traffic: 2%, Features Intersected: I 110,BUS,HOV,N110-W105
Minimum Vertical Clearance: 5.11m (16.77ft), Kilometerpoint: 13.900, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 54.5m (178.8ft)
Find on map >> Show street view
Structure Number: 53 2406F, Location: 07-LA-110-13.90-LA (Lat: 33.930072, Lng: -118.281347), Route carried "under" structure: ServiceInterstate 110, Year Built: 1991, Structure Length: 0. m, Average Daily Traffic: 1,000 (year 2014), Truck Traffic: 1%, Features Intersected: I 110,BUS,HOV,N110-W105
Minimum Vertical Clearance: 5.94m (19.49ft), Kilometerpoint: 13.900, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 54.5m (178.8ft)
Structure Number: 53 2406F, Location: 07-LA-110-13.90-LA (Lat: 33.930072, Lng: -118.281347), Route carried "under" structure: ServiceInterstate 110, Year Built: 1991, Structure Length: 0. m, Average Daily Traffic: 1,000 (year 2014), Truck Traffic: 1%, Features Intersected: I 110,BUS,HOV,N110-W105
Minimum Vertical Clearance: 5.94m (19.49ft), Kilometerpoint: 13.900, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 54.5m (178.8ft)
Find on map >> Show street view
Structure Number: 53 2406F, Location: 07-LA-110-13.90-LA (Lat: 33.930072, Lng: -118.281347), Route carried "under" structure: Ramp Interstate 110, Year Built: 1991, Structure Length: 0. m, Average Daily Traffic: 30,000 (year 2014), Truck Traffic: 1%, Features Intersected: I 110,BUS,HOV,N110-W105
Minimum Vertical Clearance: 6.43m (21.10ft), Kilometerpoint: 13.900, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 54.5m (178.8ft)
Structure Number: 53 2406F, Location: 07-LA-110-13.90-LA (Lat: 33.930072, Lng: -118.281347), Route carried "under" structure: Ramp Interstate 110, Year Built: 1991, Structure Length: 0. m, Average Daily Traffic: 30,000 (year 2014), Truck Traffic: 1%, Features Intersected: I 110,BUS,HOV,N110-W105
Minimum Vertical Clearance: 6.43m (21.10ft), Kilometerpoint: 13.900, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 54.5m (178.8ft)
Find on map >> Show street view
Structure Number: 53 2406F, Location: 07-LA-110-13.90-LA (Lat: 33.930072, Lng: -118.281347), Route carried "under" structure: Interstate 110, Year Built: 1991, Structure Length: 0. m, Average Daily Traffic: 273,760 (year 2014), Truck Traffic: 6%, Features Intersected: I 110,BUS,HOV,N110-W105
Minimum Vertical Clearance: 5.16m (16.93ft), Kilometerpoint: 13.900, Lanes on structure: 2, Lanes under structure: 8, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 54.5m (178.8ft)
Structure Number: 53 2406F, Location: 07-LA-110-13.90-LA (Lat: 33.930072, Lng: -118.281347), Route carried "under" structure: Interstate 110, Year Built: 1991, Structure Length: 0. m, Average Daily Traffic: 273,760 (year 2014), Truck Traffic: 6%, Features Intersected: I 110,BUS,HOV,N110-W105
Minimum Vertical Clearance: 5.16m (16.93ft), Kilometerpoint: 13.900, Lanes on structure: 2, Lanes under structure: 8, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 54.5m (178.8ft)
Find on map >> Show street view
Structure Number: 53 2406F, Location: 07-LA-110-13.90-LA (Lat: 33.930072, Lng: -118.281347), Route carried "under" structure: Ramp Interstate 110, Year Built: 1991, Structure Length: 0. m, Average Daily Traffic: 4,000 (year 2014), Truck Traffic: 2%, Features Intersected: I 110,BUS,HOV,N110-W105
Minimum Vertical Clearance: 7.62m (25.00ft), Kilometerpoint: 13.900, Lanes on structure: 2, Lanes under structure: 1, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 54.5m (178.8ft)
Structure Number: 53 2406F, Location: 07-LA-110-13.90-LA (Lat: 33.930072, Lng: -118.281347), Route carried "under" structure: Ramp Interstate 110, Year Built: 1991, Structure Length: 0. m, Average Daily Traffic: 4,000 (year 2014), Truck Traffic: 2%, Features Intersected: I 110,BUS,HOV,N110-W105
Minimum Vertical Clearance: 7.62m (25.00ft), Kilometerpoint: 13.900, Lanes on structure: 2, Lanes under structure: 1, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 54.5m (178.8ft)
Find on map >> Show street view
Structure Number: 53 2407F, Location: 07-LA-105-R7.43-LA (Lat: 33.926439, Lng: -118.281586), Route carried "under" structure: Interstate 105, Year Built: 1991, Structure Length: 0. m, Average Daily Traffic: 220,000 (year 2009), Truck Traffic: 4%, Features Intersected: 105 & 110,BROADWAY,117TH
Minimum Vertical Clearance: 6.10m (20.01ft), Kilometerpoint: 7.260, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 59.7m (195.9ft)
Structure Number: 53 2407F, Location: 07-LA-105-R7.43-LA (Lat: 33.926439, Lng: -118.281586), Route carried "under" structure: Interstate 105, Year Built: 1991, Structure Length: 0. m, Average Daily Traffic: 220,000 (year 2009), Truck Traffic: 4%, Features Intersected: 105 & 110,BROADWAY,117TH
Minimum Vertical Clearance: 6.10m (20.01ft), Kilometerpoint: 7.260, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 59.7m (195.9ft)
Find on map >> Show street view
Structure Number: 53 2407F, Location: 07-LA-105-R7.43-LA (Lat: 33.926439, Lng: -118.281586), Route carried "under" structure: City street Q713, Year Built: 1991, Structure Length: 0. m, Average Daily Traffic: 1,000 (year 2006), Truck Traffic: 2%, Features Intersected: 105 & 110,BROADWAY,117TH, Facility Carried by Structure: W105-S110 CONN
Minimum Vertical Clearance: 7.62m (25.00ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 59.7m (195.9ft)
Structure Number: 53 2407F, Location: 07-LA-105-R7.43-LA (Lat: 33.926439, Lng: -118.281586), Route carried "under" structure: City street Q713, Year Built: 1991, Structure Length: 0. m, Average Daily Traffic: 1,000 (year 2006), Truck Traffic: 2%, Features Intersected: 105 & 110,BROADWAY,117TH, Facility Carried by Structure: W105-S110 CONN
Minimum Vertical Clearance: 7.62m (25.00ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 59.7m (195.9ft)
Find on map >> Show street view
Structure Number: 53 2407F, Location: 07-LA-105-R7.43-LA (Lat: 33.926439, Lng: -118.281586), Route carried "under" structure: City street L139, Year Built: 1991, Structure Length: 0. m, Average Daily Traffic: 9,000 (year 2006), Truck Traffic: 2%, Features Intersected: 105 & 110,BROADWAY,117TH, Facility Carried by Structure: W105-S110 CONN
Minimum Vertical Clearance: 7.62m (25.00ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 59.7m (195.9ft)
Structure Number: 53 2407F, Location: 07-LA-105-R7.43-LA (Lat: 33.926439, Lng: -118.281586), Route carried "under" structure: City street L139, Year Built: 1991, Structure Length: 0. m, Average Daily Traffic: 9,000 (year 2006), Truck Traffic: 2%, Features Intersected: 105 & 110,BROADWAY,117TH, Facility Carried by Structure: W105-S110 CONN
Minimum Vertical Clearance: 7.62m (25.00ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 59.7m (195.9ft)
Find on map >> Show street view
Structure Number: 53 2407F, Location: 07-LA-105-R7.43-LA (Lat: 33.926439, Lng: -118.281586), Route carried "under" structure: Interstate 105, Year Built: 1991, Structure Length: 0. m, Average Daily Traffic: 220,000 (year 2009), Truck Traffic: 4%, Features Intersected: 105 & 110,BROADWAY,117TH
Minimum Vertical Clearance: 6.17m (20.24ft), Kilometerpoint: 7.260, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 59.7m (195.9ft)
Structure Number: 53 2407F, Location: 07-LA-105-R7.43-LA (Lat: 33.926439, Lng: -118.281586), Route carried "under" structure: Interstate 105, Year Built: 1991, Structure Length: 0. m, Average Daily Traffic: 220,000 (year 2009), Truck Traffic: 4%, Features Intersected: 105 & 110,BROADWAY,117TH
Minimum Vertical Clearance: 6.17m (20.24ft), Kilometerpoint: 7.260, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 59.7m (195.9ft)
Find on map >> Show street view
Structure Number: 53 2408H, Location: 07-LA-110-13.70-LA (Lat: 33.927078, Lng: -118.279772), Route carried "under" structure: City street L139, Year Built: 1991, Structure Length: 0. m, Average Daily Traffic: 8,000 (year 2020), Truck Traffic: 1%, Features Intersected: UP RR, 117TH ST,BROADWAY, Facility Carried by Structure: N&S110-E105 CONN
Minimum Vertical Clearance: 7.62m (25.00ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 43.0m (141.1ft)
Structure Number: 53 2408H, Location: 07-LA-110-13.70-LA (Lat: 33.927078, Lng: -118.279772), Route carried "under" structure: City street L139, Year Built: 1991, Structure Length: 0. m, Average Daily Traffic: 8,000 (year 2020), Truck Traffic: 1%, Features Intersected: UP RR, 117TH ST,BROADWAY, Facility Carried by Structure: N&S110-E105 CONN
Minimum Vertical Clearance: 7.62m (25.00ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 43.0m (141.1ft)
Find on map >> Show street view
Structure Number: 53 2408H, Location: 07-LA-110-13.70-LA (Lat: 33.927078, Lng: -118.279772), Route carried "under" structure: City street Q713, Year Built: 1991, Structure Length: 0. m, Average Daily Traffic: 1,000 (year 2015), Truck Traffic: 1%, Features Intersected: UP RR, 117TH ST,BROADWAY, Facility Carried by Structure: N&S110-E105 CONN
Minimum Vertical Clearance: 4.85m (15.91ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 43.0m (141.1ft)
Structure Number: 53 2408H, Location: 07-LA-110-13.70-LA (Lat: 33.927078, Lng: -118.279772), Route carried "under" structure: City street Q713, Year Built: 1991, Structure Length: 0. m, Average Daily Traffic: 1,000 (year 2015), Truck Traffic: 1%, Features Intersected: UP RR, 117TH ST,BROADWAY, Facility Carried by Structure: N&S110-E105 CONN
Minimum Vertical Clearance: 4.85m (15.91ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 43.0m (141.1ft)
Find on map >> Show street view
Structure Number: 53 2410L, Location: 07-LA-105-R7.79-LA (Lat: 33.928244, Lng: -118.274169), Route carried "under" structure: City street L043, Year Built: 1985, Structure Length: 0. m, Average Daily Traffic: 12,500 (year 2006), Truck Traffic: 1%, Features Intersected: MAIN STREET, Facility Carried by Structure: ROUTE 105 WB
Minimum Vertical Clearance: 5.48m (17.98ft), Kilometerpoint: 0.000, Lanes on structure: 6, Lanes under structure: 4, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 48.8m (160.1ft)
Structure Number: 53 2410L, Location: 07-LA-105-R7.79-LA (Lat: 33.928244, Lng: -118.274169), Route carried "under" structure: City street L043, Year Built: 1985, Structure Length: 0. m, Average Daily Traffic: 12,500 (year 2006), Truck Traffic: 1%, Features Intersected: MAIN STREET, Facility Carried by Structure: ROUTE 105 WB
Minimum Vertical Clearance: 5.48m (17.98ft), Kilometerpoint: 0.000, Lanes on structure: 6, Lanes under structure: 4, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 48.8m (160.1ft)
Find on map >> Show street view
Structure Number: 53 2410R, Location: 07-LA-105-R7.79-LA (Lat: 33.927714, Lng: -118.274167), Route carried "under" structure: City street L043, Year Built: 1985, Structure Length: 0. m, Average Daily Traffic: 12,500 (year 2006), Truck Traffic: 1%, Features Intersected: MAIN STREET, Facility Carried by Structure: ROUTE 105 EB
Minimum Vertical Clearance: 5.21m (17.09ft), Kilometerpoint: 0.000, Lanes on structure: 6, Lanes under structure: 4, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 48.8m (160.1ft)
Structure Number: 53 2410R, Location: 07-LA-105-R7.79-LA (Lat: 33.927714, Lng: -118.274167), Route carried "under" structure: City street L043, Year Built: 1985, Structure Length: 0. m, Average Daily Traffic: 12,500 (year 2006), Truck Traffic: 1%, Features Intersected: MAIN STREET, Facility Carried by Structure: ROUTE 105 EB
Minimum Vertical Clearance: 5.21m (17.09ft), Kilometerpoint: 0.000, Lanes on structure: 6, Lanes under structure: 4, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 48.8m (160.1ft)
Find on map >> Show street view
Structure Number: 53 2434T, Location: 07-LA-405-R21.32-LA (Lat: 33.932269, Lng: -118.367303), Route carried "under" structure: Ramp Interstate 105, Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 20,000 (year 2012), Truck Traffic: 1%, Features Intersected: W105-N405 CONNECTOR RAMP, Facility Carried by Structure: IMPERIAL HWY-N405
Minimum Vertical Clearance: 6.35m (20.83ft), Kilometerpoint: 2.300, Lanes on structure: 1, Lanes under structure: 2, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 40.2m (131.9ft)
Structure Number: 53 2434T, Location: 07-LA-405-R21.32-LA (Lat: 33.932269, Lng: -118.367303), Route carried "under" structure: Ramp Interstate 105, Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 20,000 (year 2012), Truck Traffic: 1%, Features Intersected: W105-N405 CONNECTOR RAMP, Facility Carried by Structure: IMPERIAL HWY-N405
Minimum Vertical Clearance: 6.35m (20.83ft), Kilometerpoint: 2.300, Lanes on structure: 1, Lanes under structure: 2, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 40.2m (131.9ft)
Find on map >> Show street view
Structure Number: 53 2438F, Location: 07-LA-405-R21.42-LA (Lat: 33.930622, Lng: -118.371414), Route carried "under" structure: County highway , Year Built: 1994, Structure Length: 0. m, Average Daily Traffic: 3,000 (year 2015), Truck Traffic: 2%, Features Intersected: IMPERIAL,LA CIENEGA,RAMP, Facility Carried by Structure: S405-W105 CONNECTR
Minimum Vertical Clearance: 7.62m (25.00ft), Kilometerpoint: 0.000, Lanes on structure: 1, Lanes under structure: 6, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 64.9m (212.9ft)
Structure Number: 53 2438F, Location: 07-LA-405-R21.42-LA (Lat: 33.930622, Lng: -118.371414), Route carried "under" structure: County highway , Year Built: 1994, Structure Length: 0. m, Average Daily Traffic: 3,000 (year 2015), Truck Traffic: 2%, Features Intersected: IMPERIAL,LA CIENEGA,RAMP, Facility Carried by Structure: S405-W105 CONNECTR
Minimum Vertical Clearance: 7.62m (25.00ft), Kilometerpoint: 0.000, Lanes on structure: 1, Lanes under structure: 6, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 64.9m (212.9ft)
Find on map >> Show street view
Structure Number: 53 2438F, Location: 07-LA-405-R21.42-LA (Lat: 33.930622, Lng: -118.371414), Route carried "under" structure: County highway , Year Built: 1994, Structure Length: 0. m, Average Daily Traffic: 2,500 (year 2015), Truck Traffic: 1%, Features Intersected: IMPERIAL,LA CIENEGA,RAMP, Facility Carried by Structure: S405-W105 CONNECTR
Minimum Vertical Clearance: 7.62m (25.00ft), Kilometerpoint: 0.000, Lanes on structure: 1, Lanes under structure: 6, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 64.9m (212.9ft)
Structure Number: 53 2438F, Location: 07-LA-405-R21.42-LA (Lat: 33.930622, Lng: -118.371414), Route carried "under" structure: County highway , Year Built: 1994, Structure Length: 0. m, Average Daily Traffic: 2,500 (year 2015), Truck Traffic: 1%, Features Intersected: IMPERIAL,LA CIENEGA,RAMP, Facility Carried by Structure: S405-W105 CONNECTR
Minimum Vertical Clearance: 7.62m (25.00ft), Kilometerpoint: 0.000, Lanes on structure: 1, Lanes under structure: 6, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 64.9m (212.9ft)
Find on map >> Show street view
Structure Number: 53 2439S, Location: 07-LA-405-R21.28-LA (Lat: 33.931556, Lng: -118.367769), Route carried "under" structure: Ramp Interstate 105, Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 20,000 (year 2015), Truck Traffic: 2%, Features Intersected: E105-N405 & W105-N405 RP, Facility Carried by Structure: N405-CENTURY BL OF
Minimum Vertical Clearance: 5.62m (18.44ft), Kilometerpoint: 2.270, Lanes on structure: 3, Lanes under structure: 1, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 41.8m (137.1ft)
Structure Number: 53 2439S, Location: 07-LA-405-R21.28-LA (Lat: 33.931556, Lng: -118.367769), Route carried "under" structure: Ramp Interstate 105, Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 20,000 (year 2015), Truck Traffic: 2%, Features Intersected: E105-N405 & W105-N405 RP, Facility Carried by Structure: N405-CENTURY BL OF
Minimum Vertical Clearance: 5.62m (18.44ft), Kilometerpoint: 2.270, Lanes on structure: 3, Lanes under structure: 1, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 41.8m (137.1ft)
Find on map >> Show street view
Structure Number: 53 2439S, Location: 07-LA-405-R21.28-LA (Lat: 33.931556, Lng: -118.367769), Route carried "under" structure: Ramp Interstate 105, Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 4,000 (year 2015), Truck Traffic: 2%, Features Intersected: E105-N405 & W105-N405 RP, Facility Carried by Structure: N405-CENTURY BL OF
Minimum Vertical Clearance: 6.08m (19.95ft), Kilometerpoint: 2.270, Lanes on structure: 3, Lanes under structure: 2, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 41.8m (137.1ft)
Structure Number: 53 2439S, Location: 07-LA-405-R21.28-LA (Lat: 33.931556, Lng: -118.367769), Route carried "under" structure: Ramp Interstate 105, Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 4,000 (year 2015), Truck Traffic: 2%, Features Intersected: E105-N405 & W105-N405 RP, Facility Carried by Structure: N405-CENTURY BL OF
Minimum Vertical Clearance: 6.08m (19.95ft), Kilometerpoint: 2.270, Lanes on structure: 3, Lanes under structure: 2, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 41.8m (137.1ft)
Find on map >> Show street view
Structure Number: 53 2442G, Location: 07-LA-405-R21.01-LA (Lat: 33.927850, Lng: -118.367467), Route carried "under" structure: Interstate 405, Year Built: 1991, Structure Length: 0. m, Average Daily Traffic: 265,000 (year 2015), Truck Traffic: 5%, Features Intersected: I 405,I 105, CONN
Minimum Vertical Clearance: 7.62m (25.00ft), Kilometerpoint: 21.010, Lanes on structure: 2, Lanes under structure: 12, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 59.4m (194.9ft)
Structure Number: 53 2442G, Location: 07-LA-405-R21.01-LA (Lat: 33.927850, Lng: -118.367467), Route carried "under" structure: Interstate 405, Year Built: 1991, Structure Length: 0. m, Average Daily Traffic: 265,000 (year 2015), Truck Traffic: 5%, Features Intersected: I 405,I 105, CONN
Minimum Vertical Clearance: 7.62m (25.00ft), Kilometerpoint: 21.010, Lanes on structure: 2, Lanes under structure: 12, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 59.4m (194.9ft)
Find on map >> Show street view
Structure Number: 53 2442G, Location: 07-LA-405-R21.01-LA (Lat: 33.927850, Lng: -118.367467), Route carried "under" structure: Interstate 105, Year Built: 1991, Structure Length: 0. m, Average Daily Traffic: 176,000 (year 2015), Truck Traffic: 7%, Features Intersected: I 405,I 105, CONN
Minimum Vertical Clearance: 6.35m (20.83ft), Kilometerpoint: 2.110, Lanes on structure: 2, Lanes under structure: 8, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 59.4m (194.9ft)
Structure Number: 53 2442G, Location: 07-LA-405-R21.01-LA (Lat: 33.927850, Lng: -118.367467), Route carried "under" structure: Interstate 105, Year Built: 1991, Structure Length: 0. m, Average Daily Traffic: 176,000 (year 2015), Truck Traffic: 7%, Features Intersected: I 405,I 105, CONN
Minimum Vertical Clearance: 6.35m (20.83ft), Kilometerpoint: 2.110, Lanes on structure: 2, Lanes under structure: 8, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 59.4m (194.9ft)
Find on map >> Show street view
Structure Number: 53 2442H, Location: 07-LA-405-R21.18-LA (Lat: 33.930517, Lng: -118.376700), Route carried "under" structure: Ramp Interstate 105, Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 15,000 (year 2015), Truck Traffic: 5%, Features Intersected: IMPERIAL ON & OFF-RAMPS
Minimum Vertical Clearance: 7.62m (25.00ft), Kilometerpoint: 1.750, Lanes on structure: 2, Lanes under structure: 3, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 48.8m (160.1ft)
Structure Number: 53 2442H, Location: 07-LA-405-R21.18-LA (Lat: 33.930517, Lng: -118.376700), Route carried "under" structure: Ramp Interstate 105, Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 15,000 (year 2015), Truck Traffic: 5%, Features Intersected: IMPERIAL ON & OFF-RAMPS
Minimum Vertical Clearance: 7.62m (25.00ft), Kilometerpoint: 1.750, Lanes on structure: 2, Lanes under structure: 3, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 48.8m (160.1ft)
Find on map >> Show street view
Structure Number: 53 2442H, Location: 07-LA-405-R21.18-LA (Lat: 33.930517, Lng: -118.376700), Route carried "under" structure: Ramp Interstate 105, Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 15,000 (year 2015), Truck Traffic: 5%, Features Intersected: IMPERIAL ON & OFF-RAMPS
Minimum Vertical Clearance: 7.62m (25.00ft), Kilometerpoint: 1.750, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 48.8m (160.1ft)
Structure Number: 53 2442H, Location: 07-LA-405-R21.18-LA (Lat: 33.930517, Lng: -118.376700), Route carried "under" structure: Ramp Interstate 105, Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 15,000 (year 2015), Truck Traffic: 5%, Features Intersected: IMPERIAL ON & OFF-RAMPS
Minimum Vertical Clearance: 7.62m (25.00ft), Kilometerpoint: 1.750, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 48.8m (160.1ft)
Find on map >> Show street view
Structure Number: 53 2464, Location: 07-LA-118-R6.80-LA (Lat: 34.278444, Lng: -118.519797), Route carried "under" structure: State highway 118, Year Built: 1980, Structure Length: 0. m, Average Daily Traffic: 222,000 (year 2020), Features Intersected: ROUTE 118, Facility Carried by Structure: WHITE OAK AVENUE O
Minimum Vertical Clearance: 7.39m (24.25ft), Kilometerpoint: 6.800, Lanes on structure: 4, Lanes under structure: 11, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 42.1m (138.1ft)
Structure Number: 53 2464, Location: 07-LA-118-R6.80-LA (Lat: 34.278444, Lng: -118.519797), Route carried "under" structure: State highway 118, Year Built: 1980, Structure Length: 0. m, Average Daily Traffic: 222,000 (year 2020), Features Intersected: ROUTE 118, Facility Carried by Structure: WHITE OAK AVENUE O
Minimum Vertical Clearance: 7.39m (24.25ft), Kilometerpoint: 6.800, Lanes on structure: 4, Lanes under structure: 11, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 42.1m (138.1ft)
Find on map >> Show street view
Structure Number: 53 2465, Location: 07-LA-118-R7.05-LA (Lat: 34.278167, Lng: -118.515397), Route carried "under" structure: State highway 118, Year Built: 1980, Structure Length: 0. m, Average Daily Traffic: 222,000 (year 2020), Truck Traffic: 5%, Features Intersected: STATE ROUTE 118, Facility Carried by Structure: ENCINO AVE
Minimum Vertical Clearance: 5.36m (17.59ft), Kilometerpoint: 7.050, Lanes on structure: 2, Lanes under structure: 11, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 42.7m (140.1ft)
Structure Number: 53 2465, Location: 07-LA-118-R7.05-LA (Lat: 34.278167, Lng: -118.515397), Route carried "under" structure: State highway 118, Year Built: 1980, Structure Length: 0. m, Average Daily Traffic: 222,000 (year 2020), Truck Traffic: 5%, Features Intersected: STATE ROUTE 118, Facility Carried by Structure: ENCINO AVE
Minimum Vertical Clearance: 5.36m (17.59ft), Kilometerpoint: 7.050, Lanes on structure: 2, Lanes under structure: 11, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 42.7m (140.1ft)
Find on map >> Show street view
Structure Number: 53 2466, Location: 07-LA-118-R7.30-LA (Lat: 34.278186, Lng: -118.511031), Route carried "under" structure: State highway 118, Year Built: 1980, Structure Length: 0. m, Average Daily Traffic: 222,000 (year 2020), Truck Traffic: 5%, Features Intersected: STATE ROUTE 118, Facility Carried by Structure: LOUISE AVENUE
Minimum Vertical Clearance: 5.84m (19.16ft), Kilometerpoint: 7.300, Lanes on structure: 3, Lanes under structure: 11, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 37.8m (124.0ft)
Structure Number: 53 2466, Location: 07-LA-118-R7.30-LA (Lat: 34.278186, Lng: -118.511031), Route carried "under" structure: State highway 118, Year Built: 1980, Structure Length: 0. m, Average Daily Traffic: 222,000 (year 2020), Truck Traffic: 5%, Features Intersected: STATE ROUTE 118, Facility Carried by Structure: LOUISE AVENUE
Minimum Vertical Clearance: 5.84m (19.16ft), Kilometerpoint: 7.300, Lanes on structure: 3, Lanes under structure: 11, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 37.8m (124.0ft)
Find on map >> Show street view
Structure Number: 53 2476, Location: 07-LA-105-R8.04-LA (Lat: 33.927200, Lng: -118.269889), Route carried "under" structure: City street L149, Year Built: 1985, Structure Length: 0. m, Average Daily Traffic: 9,200 (year 2006), Truck Traffic: 1%, Features Intersected: SAN PEDRO STREET, Facility Carried by Structure: ROUTE 105 & LRT
Minimum Vertical Clearance: 4.93m (16.17ft), Kilometerpoint: 0.000, Lanes on structure: 12, Lanes under structure: 4, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 42.4m (139.1ft)
Structure Number: 53 2476, Location: 07-LA-105-R8.04-LA (Lat: 33.927200, Lng: -118.269889), Route carried "under" structure: City street L149, Year Built: 1985, Structure Length: 0. m, Average Daily Traffic: 9,200 (year 2006), Truck Traffic: 1%, Features Intersected: SAN PEDRO STREET, Facility Carried by Structure: ROUTE 105 & LRT
Minimum Vertical Clearance: 4.93m (16.17ft), Kilometerpoint: 0.000, Lanes on structure: 12, Lanes under structure: 4, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 42.4m (139.1ft)
Find on map >> Show street view
Structure Number: 53 2477, Location: 07-LA-105-R8.29-LA (Lat: 33.927200, Lng: -118.265631), Route carried "under" structure: City street L044, Year Built: 1988, Structure Length: 0. m, Average Daily Traffic: 20,000 (year 2006), Truck Traffic: 1%, Features Intersected: AVALON BLVD, Facility Carried by Structure: ROUTE 105 & LRT
Minimum Vertical Clearance: 5.18m (16.99ft), Kilometerpoint: 0.000, Lanes on structure: 11, Lanes under structure: 4, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 34.1m (111.9ft)
Structure Number: 53 2477, Location: 07-LA-105-R8.29-LA (Lat: 33.927200, Lng: -118.265631), Route carried "under" structure: City street L044, Year Built: 1988, Structure Length: 0. m, Average Daily Traffic: 20,000 (year 2006), Truck Traffic: 1%, Features Intersected: AVALON BLVD, Facility Carried by Structure: ROUTE 105 & LRT
Minimum Vertical Clearance: 5.18m (16.99ft), Kilometerpoint: 0.000, Lanes on structure: 11, Lanes under structure: 4, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 34.1m (111.9ft)
Find on map >> Show street view
Structure Number: 53 248, Location: 07-LA-105-R8.94-LA (Lat: 33.927789, Lng: -118.254631), Route carried "under" structure: City street L089, Year Built: 1987, Structure Length: 0. m, Average Daily Traffic: 21,500 (year 2006), Truck Traffic: 2%, Features Intersected: CENTRAL AVENUE, Facility Carried by Structure: ROUTE 105 & LRT
Minimum Vertical Clearance: 4.52m (14.83ft), Kilometerpoint: 0.000, Lanes on structure: 9, Lanes under structure: 4, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 48.4m (158.8ft)
Structure Number: 53 248, Location: 07-LA-105-R8.94-LA (Lat: 33.927789, Lng: -118.254631), Route carried "under" structure: City street L089, Year Built: 1987, Structure Length: 0. m, Average Daily Traffic: 21,500 (year 2006), Truck Traffic: 2%, Features Intersected: CENTRAL AVENUE, Facility Carried by Structure: ROUTE 105 & LRT
Minimum Vertical Clearance: 4.52m (14.83ft), Kilometerpoint: 0.000, Lanes on structure: 9, Lanes under structure: 4, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 48.4m (158.8ft)
Find on map >> Show street view
Structure Number: 53 2498, Location: 07-LA-118-R3.13-LA (Lat: 34.273128, Lng: -118.582628), Route carried "under" structure: State highway 118, Year Built: 1980, Structure Length: 0. m, Average Daily Traffic: 222,000 (year 2020), Truck Traffic: 6%, Features Intersected: SR 118, Facility Carried by Structure: RINALDI ST
Minimum Vertical Clearance: 5.05m (16.57ft), Kilometerpoint: 3.130, Lanes on structure: 3, Lanes under structure: 10, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 45.7m (149.9ft)
Structure Number: 53 2498, Location: 07-LA-118-R3.13-LA (Lat: 34.273128, Lng: -118.582628), Route carried "under" structure: State highway 118, Year Built: 1980, Structure Length: 0. m, Average Daily Traffic: 222,000 (year 2020), Truck Traffic: 6%, Features Intersected: SR 118, Facility Carried by Structure: RINALDI ST
Minimum Vertical Clearance: 5.05m (16.57ft), Kilometerpoint: 3.130, Lanes on structure: 3, Lanes under structure: 10, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 45.7m (149.9ft)
Find on map >> Show street view
Structure Number: 53 2499, Location: 07-LA-118-R3.32-LA (Lat: 34.273122, Lng: -118.579158), Route carried "under" structure: State highway 118, Year Built: 1980, Structure Length: 0. m, Average Daily Traffic: 222,000 (year 2020), Truck Traffic: 6%, Features Intersected: SR 118, Facility Carried by Structure: MASON AVE
Minimum Vertical Clearance: 5.30m (17.39ft), Kilometerpoint: 3.320, Lanes on structure: 4, Lanes under structure: 10, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 41.5m (136.2ft)
Structure Number: 53 2499, Location: 07-LA-118-R3.32-LA (Lat: 34.273122, Lng: -118.579158), Route carried "under" structure: State highway 118, Year Built: 1980, Structure Length: 0. m, Average Daily Traffic: 222,000 (year 2020), Truck Traffic: 6%, Features Intersected: SR 118, Facility Carried by Structure: MASON AVE
Minimum Vertical Clearance: 5.30m (17.39ft), Kilometerpoint: 3.320, Lanes on structure: 4, Lanes under structure: 10, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 41.5m (136.2ft)
Find on map >> Show street view
Structure Number: 53 25, Location: 07-LA-118-R3.86-LA (Lat: 34.273131, Lng: -118.569508), Route carried "under" structure: State highway 118, Year Built: 1980, Structure Length: 0. m, Average Daily Traffic: 222,000 (year 2020), Truck Traffic: 6%, Features Intersected: SR 118, Facility Carried by Structure: PORTER RANCH DRIVE
Minimum Vertical Clearance: 5.46m (17.91ft), Kilometerpoint: 3.860, Lanes on structure: 4, Lanes under structure: 10, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 38.0m (124.7ft)
Structure Number: 53 25, Location: 07-LA-118-R3.86-LA (Lat: 34.273131, Lng: -118.569508), Route carried "under" structure: State highway 118, Year Built: 1980, Structure Length: 0. m, Average Daily Traffic: 222,000 (year 2020), Truck Traffic: 6%, Features Intersected: SR 118, Facility Carried by Structure: PORTER RANCH DRIVE
Minimum Vertical Clearance: 5.46m (17.91ft), Kilometerpoint: 3.860, Lanes on structure: 4, Lanes under structure: 10, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 38.0m (124.7ft)
Find on map >> Show street view
Structure Number: 53 2501, Location: 07-LA-118-R4.29-LA (Lat: 34.272639, Lng: -118.562025), Route carried "under" structure: State highway 118, Year Built: 1980, Structure Length: 0. m, Average Daily Traffic: 222,000 (year 2020), Truck Traffic: 6%, Features Intersected: STATE ROUTE 118, Facility Carried by Structure: CORBIN AVE
Minimum Vertical Clearance: 5.41m (17.75ft), Kilometerpoint: 4.290, Lanes on structure: 4, Lanes under structure: 11, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 37.0m (121.4ft)
Structure Number: 53 2501, Location: 07-LA-118-R4.29-LA (Lat: 34.272639, Lng: -118.562025), Route carried "under" structure: State highway 118, Year Built: 1980, Structure Length: 0. m, Average Daily Traffic: 222,000 (year 2020), Truck Traffic: 6%, Features Intersected: STATE ROUTE 118, Facility Carried by Structure: CORBIN AVE
Minimum Vertical Clearance: 5.41m (17.75ft), Kilometerpoint: 4.290, Lanes on structure: 4, Lanes under structure: 11, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 37.0m (121.4ft)
Find on map >> Show street view
Structure Number: 53 2509, Location: 07-LA-118-R5.20-LA (Lat: 34.273864, Lng: -118.546486), Route carried "under" structure: State highway 118, Year Built: 1980, Structure Length: 0. m, Average Daily Traffic: 222,000 (year 2020), Truck Traffic: 8%, Features Intersected: STATE ROUTE 118, Facility Carried by Structure: WILBUR AVE
Minimum Vertical Clearance: 5.18m (16.99ft), Kilometerpoint: 5.200, Lanes on structure: 4, Lanes under structure: 11, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 39.8m (130.6ft)
Structure Number: 53 2509, Location: 07-LA-118-R5.20-LA (Lat: 34.273864, Lng: -118.546486), Route carried "under" structure: State highway 118, Year Built: 1980, Structure Length: 0. m, Average Daily Traffic: 222,000 (year 2020), Truck Traffic: 8%, Features Intersected: STATE ROUTE 118, Facility Carried by Structure: WILBUR AVE
Minimum Vertical Clearance: 5.18m (16.99ft), Kilometerpoint: 5.200, Lanes on structure: 4, Lanes under structure: 11, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 39.8m (130.6ft)
Find on map >> Show street view
Structure Number: 53 251, Location: 07-LA-118-R5.81-LA (Lat: 34.274833, Lng: -118.536069), Route carried "under" structure: State highway 118, Year Built: 1980, Structure Length: 0. m, Average Daily Traffic: 222,000 (year 2020), Features Intersected: ROUTE 118, Facility Carried by Structure: RESEDA BLVD
Minimum Vertical Clearance: 5.23m (17.16ft), Kilometerpoint: 5.810, Lanes on structure: 6, Lanes under structure: 12, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 36.3m (119.1ft)
Structure Number: 53 251, Location: 07-LA-118-R5.81-LA (Lat: 34.274833, Lng: -118.536069), Route carried "under" structure: State highway 118, Year Built: 1980, Structure Length: 0. m, Average Daily Traffic: 222,000 (year 2020), Features Intersected: ROUTE 118, Facility Carried by Structure: RESEDA BLVD
Minimum Vertical Clearance: 5.23m (17.16ft), Kilometerpoint: 5.810, Lanes on structure: 6, Lanes under structure: 12, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 36.3m (119.1ft)
Find on map >> Show street view
Structure Number: 53 2511, Location: 07-LA-118-R6.03-LA (Lat: 34.276053, Lng: -118.532603), Route carried "under" structure: State highway 118, Year Built: 1980, Structure Length: 0. m, Average Daily Traffic: 222,000 (year 2020), Features Intersected: STATE ROUTE 118, Facility Carried by Structure: ETIWANDA AVE POC
Minimum Vertical Clearance: 7.52m (24.67ft), Kilometerpoint: 6.030, Lanes under structure: 12, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 50.3m (165.0ft)
Structure Number: 53 2511, Location: 07-LA-118-R6.03-LA (Lat: 34.276053, Lng: -118.532603), Route carried "under" structure: State highway 118, Year Built: 1980, Structure Length: 0. m, Average Daily Traffic: 222,000 (year 2020), Features Intersected: STATE ROUTE 118, Facility Carried by Structure: ETIWANDA AVE POC
Minimum Vertical Clearance: 7.52m (24.67ft), Kilometerpoint: 6.030, Lanes under structure: 12, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 50.3m (165.0ft)
Find on map >> Show street view
Structure Number: 53 2512, Location: 07-LA-118-R6.23-LA (Lat: 34.277356, Lng: -118.529175), Route carried "under" structure: State highway 118, Year Built: 1980, Structure Length: 0. m, Average Daily Traffic: 222,000 (year 2020), Features Intersected: ROUTE 118, Facility Carried by Structure: CHIMINEAS AVE
Minimum Vertical Clearance: 4.95m (16.24ft), Kilometerpoint: 6.230, Lanes on structure: 2, Lanes under structure: 11, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 42.4m (139.1ft)
Structure Number: 53 2512, Location: 07-LA-118-R6.23-LA (Lat: 34.277356, Lng: -118.529175), Route carried "under" structure: State highway 118, Year Built: 1980, Structure Length: 0. m, Average Daily Traffic: 222,000 (year 2020), Features Intersected: ROUTE 118, Facility Carried by Structure: CHIMINEAS AVE
Minimum Vertical Clearance: 4.95m (16.24ft), Kilometerpoint: 6.230, Lanes on structure: 2, Lanes under structure: 11, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 42.4m (139.1ft)
Find on map >> Show street view
Structure Number: 53 2513, Location: 07-LA-118-R6.58-LA (Lat: 34.278786, Lng: -118.523842), Route carried "under" structure: State highway 118, Year Built: 1980, Structure Length: 0. m, Average Daily Traffic: 222,000 (year 2020), Features Intersected: STATE ROUTE 118, Facility Carried by Structure: ZELZAH AVE
Minimum Vertical Clearance: 7.62m (25.00ft), Kilometerpoint: 6.580, Lanes on structure: 2, Lanes under structure: 11, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 61.9m (203.1ft)
Structure Number: 53 2513, Location: 07-LA-118-R6.58-LA (Lat: 34.278786, Lng: -118.523842), Route carried "under" structure: State highway 118, Year Built: 1980, Structure Length: 0. m, Average Daily Traffic: 222,000 (year 2020), Features Intersected: STATE ROUTE 118, Facility Carried by Structure: ZELZAH AVE
Minimum Vertical Clearance: 7.62m (25.00ft), Kilometerpoint: 6.580, Lanes on structure: 2, Lanes under structure: 11, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 61.9m (203.1ft)
Find on map >> Show street view
Structure Number: 53 2527, Location: 07-LA-105-R6.74-LA (Lat: 33.929175, Lng: -118.292044), Route carried "under" structure: Interstate 105, Year Built: 1985, Structure Length: 0. m, Average Daily Traffic: 220,000 (year 2009), Truck Traffic: 4%, Features Intersected: ROUTE 105 & LRT, Facility Carried by Structure: VERMONT AVENUE
Minimum Vertical Clearance: 4.95m (16.24ft), Kilometerpoint: 6.740, Lanes on structure: 7, Lanes under structure: 12, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 53.9m (176.8ft)
Structure Number: 53 2527, Location: 07-LA-105-R6.74-LA (Lat: 33.929175, Lng: -118.292044), Route carried "under" structure: Interstate 105, Year Built: 1985, Structure Length: 0. m, Average Daily Traffic: 220,000 (year 2009), Truck Traffic: 4%, Features Intersected: ROUTE 105 & LRT, Facility Carried by Structure: VERMONT AVENUE
Minimum Vertical Clearance: 4.95m (16.24ft), Kilometerpoint: 6.740, Lanes on structure: 7, Lanes under structure: 12, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 53.9m (176.8ft)
Find on map >> Show street view
Structure Number: 53 2528, Location: 07-LA-105-R7.05-LA (Lat: 33.928406, Lng: -118.287172), Route carried "under" structure: City street L138, Year Built: 1985, Structure Length: 0. m, Average Daily Traffic: 5,500 (year 2006), Truck Traffic: 1%, Features Intersected: HOOVER STREET, Facility Carried by Structure: ROUTE 105 & LRT
Minimum Vertical Clearance: 4.62m (15.16ft), Kilometerpoint: 0.000, Lanes on structure: 11, Lanes under structure: 4, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 37.6m (123.4ft)
Structure Number: 53 2528, Location: 07-LA-105-R7.05-LA (Lat: 33.928406, Lng: -118.287172), Route carried "under" structure: City street L138, Year Built: 1985, Structure Length: 0. m, Average Daily Traffic: 5,500 (year 2006), Truck Traffic: 1%, Features Intersected: HOOVER STREET, Facility Carried by Structure: ROUTE 105 & LRT
Minimum Vertical Clearance: 4.62m (15.16ft), Kilometerpoint: 0.000, Lanes on structure: 11, Lanes under structure: 4, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 37.6m (123.4ft)
Find on map >> Show street view
Structure Number: 53 2539R, Location: 07-LA-010S-21.17-LA (Lat: 34.062544, Lng: -118.169333), Route carried "under" structure: Ramp Interstate 10, Year Built: 1974, Structure Length: 0. m, Average Daily Traffic: 4,000 (year 2005), Truck Traffic: 2%, Features Intersected: W10-CAMPUS RD OFFRAMP
Minimum Vertical Clearance: 4.90m (16.08ft), Kilometerpoint: 21.170, Lanes on structure: 2, Lanes under structure: 1, Material/Design: Concrete, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 14.9m (48.9ft)
Structure Number: 53 2539R, Location: 07-LA-010S-21.17-LA (Lat: 34.062544, Lng: -118.169333), Route carried "under" structure: Ramp Interstate 10, Year Built: 1974, Structure Length: 0. m, Average Daily Traffic: 4,000 (year 2005), Truck Traffic: 2%, Features Intersected: W10-CAMPUS RD OFFRAMP
Minimum Vertical Clearance: 4.90m (16.08ft), Kilometerpoint: 21.170, Lanes on structure: 2, Lanes under structure: 1, Material/Design: Concrete, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 14.9m (48.9ft)
Find on map >> Show street view
Structure Number: 53 2540L, Location: 07-LA-010S-21.07-LA (Lat: 34.062172, Lng: -118.170917), Route carried "under" structure: Interstate 10, Year Built: 1974, Structure Length: 0. m, Average Daily Traffic: 6,200 (year 2012), Truck Traffic: 6%, Features Intersected: METROLINK & EB BUSWAY
Minimum Vertical Clearance: 4.88m (16.01ft), Kilometerpoint: 21.070, Lanes on structure: 2, Lanes under structure: 1, Toll: On toll road, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 36.6m (120.1ft)
Structure Number: 53 2540L, Location: 07-LA-010S-21.07-LA (Lat: 34.062172, Lng: -118.170917), Route carried "under" structure: Interstate 10, Year Built: 1974, Structure Length: 0. m, Average Daily Traffic: 6,200 (year 2012), Truck Traffic: 6%, Features Intersected: METROLINK & EB BUSWAY
Minimum Vertical Clearance: 4.88m (16.01ft), Kilometerpoint: 21.070, Lanes on structure: 2, Lanes under structure: 1, Toll: On toll road, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 36.6m (120.1ft)
Find on map >> Show street view
Structure Number: 53 2549H, Location: 07-LA-091-R6.40-LA (Lat: 33.873144, Lng: -118.281711), Route carried "under" structure: Ramp Interstate 91, Year Built: 1985, Structure Length: 0. m, Average Daily Traffic: 18,700 (year 2015), Truck Traffic: 2%, Features Intersected: ROUTES 110 & 91,CONS,STS
Minimum Vertical Clearance: 5.02m (16.47ft), Kilometerpoint: 6.400, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 65.6m (215.2ft)
Structure Number: 53 2549H, Location: 07-LA-091-R6.40-LA (Lat: 33.873144, Lng: -118.281711), Route carried "under" structure: Ramp Interstate 91, Year Built: 1985, Structure Length: 0. m, Average Daily Traffic: 18,700 (year 2015), Truck Traffic: 2%, Features Intersected: ROUTES 110 & 91,CONS,STS
Minimum Vertical Clearance: 5.02m (16.47ft), Kilometerpoint: 6.400, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 65.6m (215.2ft)
Find on map >> Show street view
Structure Number: 53 2549H, Location: 07-LA-091-R6.40-LA (Lat: 33.873144, Lng: -118.281711), Route carried "under" structure: Ramp Interstate 110, Year Built: 1985, Structure Length: 0. m, Average Daily Traffic: 272,000 (year 2015), Truck Traffic: 3%, Features Intersected: ROUTES 110 & 91,CONS,STS
Minimum Vertical Clearance: 5.08m (16.67ft), Kilometerpoint: 9.470, Lanes on structure: 2, Lanes under structure: 3, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 65.6m (215.2ft)
Structure Number: 53 2549H, Location: 07-LA-091-R6.40-LA (Lat: 33.873144, Lng: -118.281711), Route carried "under" structure: Ramp Interstate 110, Year Built: 1985, Structure Length: 0. m, Average Daily Traffic: 272,000 (year 2015), Truck Traffic: 3%, Features Intersected: ROUTES 110 & 91,CONS,STS
Minimum Vertical Clearance: 5.08m (16.67ft), Kilometerpoint: 9.470, Lanes on structure: 2, Lanes under structure: 3, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 65.6m (215.2ft)
Find on map >> Show street view
Structure Number: 53 2549H, Location: 07-LA-091-R6.40-LA (Lat: 33.873144, Lng: -118.281711), Route carried "under" structure: Interstate 110, Year Built: 1985, Structure Length: 0. m, Average Daily Traffic: 271,000 (year 2015), Truck Traffic: 6%, Features Intersected: ROUTES 110 & 91,CONS,STS
Minimum Vertical Clearance: 5.11m (16.77ft), Kilometerpoint: 9.470, Lanes on structure: 2, Lanes under structure: 8, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 65.6m (215.2ft)
Structure Number: 53 2549H, Location: 07-LA-091-R6.40-LA (Lat: 33.873144, Lng: -118.281711), Route carried "under" structure: Interstate 110, Year Built: 1985, Structure Length: 0. m, Average Daily Traffic: 271,000 (year 2015), Truck Traffic: 6%, Features Intersected: ROUTES 110 & 91,CONS,STS
Minimum Vertical Clearance: 5.11m (16.77ft), Kilometerpoint: 9.470, Lanes on structure: 2, Lanes under structure: 8, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 65.6m (215.2ft)
Find on map >> Show street view
Structure Number: 53 2549H, Location: 07-LA-091-R6.40-LA (Lat: 33.873144, Lng: -118.281711), Route carried "under" structure: State highway 91, Year Built: 1985, Structure Length: 0. m, Average Daily Traffic: 202,545 (year 2015), Truck Traffic: 7%, Features Intersected: ROUTES 110 & 91,CONS,STS
Minimum Vertical Clearance: 7.62m (25.00ft), Kilometerpoint: 6.540, Lanes on structure: 2, Lanes under structure: 6, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 65.6m (215.2ft)
Structure Number: 53 2549H, Location: 07-LA-091-R6.40-LA (Lat: 33.873144, Lng: -118.281711), Route carried "under" structure: State highway 91, Year Built: 1985, Structure Length: 0. m, Average Daily Traffic: 202,545 (year 2015), Truck Traffic: 7%, Features Intersected: ROUTES 110 & 91,CONS,STS
Minimum Vertical Clearance: 7.62m (25.00ft), Kilometerpoint: 6.540, Lanes on structure: 2, Lanes under structure: 6, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 65.6m (215.2ft)
Find on map >> Show street view
Structure Number: 53 2549H, Location: 07-LA-091-R6.40-LA (Lat: 33.873144, Lng: -118.281711), Route carried "under" structure: City street L076, Year Built: 1985, Structure Length: 0. m, Average Daily Traffic: 9,000 (year 2015), Truck Traffic: 2%, Features Intersected: ROUTES 110 & 91,CONS,STS, Facility Carried by Structure: E&W91-S110 CONN
Minimum Vertical Clearance: 7.62m (25.00ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 65.6m (215.2ft)
Structure Number: 53 2549H, Location: 07-LA-091-R6.40-LA (Lat: 33.873144, Lng: -118.281711), Route carried "under" structure: City street L076, Year Built: 1985, Structure Length: 0. m, Average Daily Traffic: 9,000 (year 2015), Truck Traffic: 2%, Features Intersected: ROUTES 110 & 91,CONS,STS, Facility Carried by Structure: E&W91-S110 CONN
Minimum Vertical Clearance: 7.62m (25.00ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 65.6m (215.2ft)
Find on map >> Show street view
Structure Number: 53 2549H, Location: 07-LA-091-R6.40-LA (Lat: 33.873144, Lng: -118.281711), Route carried "under" structure: City street L042, Year Built: 1985, Structure Length: 0. m, Average Daily Traffic: 17,100 (year 2015), Truck Traffic: 2%, Features Intersected: ROUTES 110 & 91,CONS,STS, Facility Carried by Structure: E&W91-S110 CONN
Minimum Vertical Clearance: 7.54m (24.74ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 65.6m (215.2ft)
Structure Number: 53 2549H, Location: 07-LA-091-R6.40-LA (Lat: 33.873144, Lng: -118.281711), Route carried "under" structure: City street L042, Year Built: 1985, Structure Length: 0. m, Average Daily Traffic: 17,100 (year 2015), Truck Traffic: 2%, Features Intersected: ROUTES 110 & 91,CONS,STS, Facility Carried by Structure: E&W91-S110 CONN
Minimum Vertical Clearance: 7.54m (24.74ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 65.6m (215.2ft)
Find on map >> Show street view
Structure Number: 53 2551, Location: 07-LA-091-R6.52-LA (Lat: 33.872475, Lng: -118.282017), Route carried "under" structure: City street L042, Year Built: 1985, Structure Length: 0. m, Average Daily Traffic: 17,938 (year 2015), Truck Traffic: 2%, Features Intersected: FIGUEROA STREET, Facility Carried by Structure: STATE ROUTE 91
Minimum Vertical Clearance: 4.62m (15.16ft), Kilometerpoint: 0.000, Lanes on structure: 8, Lanes under structure: 4, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 44.5m (146.0ft)
Structure Number: 53 2551, Location: 07-LA-091-R6.52-LA (Lat: 33.872475, Lng: -118.282017), Route carried "under" structure: City street L042, Year Built: 1985, Structure Length: 0. m, Average Daily Traffic: 17,938 (year 2015), Truck Traffic: 2%, Features Intersected: FIGUEROA STREET, Facility Carried by Structure: STATE ROUTE 91
Minimum Vertical Clearance: 4.62m (15.16ft), Kilometerpoint: 0.000, Lanes on structure: 8, Lanes under structure: 4, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 44.5m (146.0ft)
Find on map >> Show street view
Structure Number: 53 2626, Location: 07-LA-103-0.07-LA (Lat: 33.774639, Lng: -118.240028), Route carried "under" structure: Ramp State highway 103, Year Built: 1947, Structure Length: 0. m, Average Daily Traffic: 15,200 (year 2012), Truck Traffic: 18%, Features Intersected: UP RR & N103-FORD AV OFF
Minimum Vertical Clearance: 4.72m (15.49ft), Kilometerpoint: 0.070, Lanes on structure: 6, Lanes under structure: 1, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 22.6m (74.1ft)
Structure Number: 53 2626, Location: 07-LA-103-0.07-LA (Lat: 33.774639, Lng: -118.240028), Route carried "under" structure: Ramp State highway 103, Year Built: 1947, Structure Length: 0. m, Average Daily Traffic: 15,200 (year 2012), Truck Traffic: 18%, Features Intersected: UP RR & N103-FORD AV OFF
Minimum Vertical Clearance: 4.72m (15.49ft), Kilometerpoint: 0.070, Lanes on structure: 6, Lanes under structure: 1, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 22.6m (74.1ft)
Find on map >> Show street view
Structure Number: 53 2627, Location: 07-LA-103-0.90-LA (Lat: 33.780617, Lng: -118.228364), Route carried "under" structure: City street L028, Year Built: 1947, Structure Length: 0. m, Average Daily Traffic: 34,294 (year 2016), Truck Traffic: 2%, Features Intersected: ANAHEIM STREET OH, Facility Carried by Structure: RTE 103
Minimum Vertical Clearance: 6.63m (21.75ft), Kilometerpoint: 0.000, Lanes on structure: 5, Lanes under structure: 6, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 36.3m (119.1ft)
Structure Number: 53 2627, Location: 07-LA-103-0.90-LA (Lat: 33.780617, Lng: -118.228364), Route carried "under" structure: City street L028, Year Built: 1947, Structure Length: 0. m, Average Daily Traffic: 34,294 (year 2016), Truck Traffic: 2%, Features Intersected: ANAHEIM STREET OH, Facility Carried by Structure: RTE 103
Minimum Vertical Clearance: 6.63m (21.75ft), Kilometerpoint: 0.000, Lanes on structure: 5, Lanes under structure: 6, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 36.3m (119.1ft)
Find on map >> Show street view
Structure Number: 53 2638, Location: 07-LA-010S-18.65-LA (Lat: 34.055856, Lng: -118.210158), Route carried "under" structure: Interstate 10, Year Built: 1974, Structure Length: 0. m, Average Daily Traffic: 6,200 (year 2010), Truck Traffic: 5%, Features Intersected: EB BUSWY,SCRRA METROLINK, Facility Carried by Structure: PEDESTRIAN WALKWAY
Minimum Vertical Clearance: 6.38m (20.93ft), Kilometerpoint: 18.650, Lanes under structure: 2, Toll: On toll road, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 29.0m (95.1ft)
Structure Number: 53 2638, Location: 07-LA-010S-18.65-LA (Lat: 34.055856, Lng: -118.210158), Route carried "under" structure: Interstate 10, Year Built: 1974, Structure Length: 0. m, Average Daily Traffic: 6,200 (year 2010), Truck Traffic: 5%, Features Intersected: EB BUSWY,SCRRA METROLINK, Facility Carried by Structure: PEDESTRIAN WALKWAY
Minimum Vertical Clearance: 6.38m (20.93ft), Kilometerpoint: 18.650, Lanes under structure: 2, Toll: On toll road, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 29.0m (95.1ft)
Find on map >> Show street view
Structure Number: 53 2639, Location: 07-LA-010S-21.20-LA (Lat: 34.063103, Lng: -118.168053), Route carried "under" structure: Interstate 10, Year Built: 1974, Structure Length: 0. m, Average Daily Traffic: 9,400 (year 2010), Truck Traffic: 1%, Features Intersected: EB&WB BUSWAY,SCRRA,BNSF, Facility Carried by Structure: PEDESTRIAN WALKWAY
Minimum Vertical Clearance: 7.21m (23.65ft), Kilometerpoint: 21.200, Lanes under structure: 4, Material/Design: Steel, Design/Construction: Truss - Thru, Length of Maximum Span: 38.7m (127.0ft)
Structure Number: 53 2639, Location: 07-LA-010S-21.20-LA (Lat: 34.063103, Lng: -118.168053), Route carried "under" structure: Interstate 10, Year Built: 1974, Structure Length: 0. m, Average Daily Traffic: 9,400 (year 2010), Truck Traffic: 1%, Features Intersected: EB&WB BUSWAY,SCRRA,BNSF, Facility Carried by Structure: PEDESTRIAN WALKWAY
Minimum Vertical Clearance: 7.21m (23.65ft), Kilometerpoint: 21.200, Lanes under structure: 4, Material/Design: Steel, Design/Construction: Truss - Thru, Length of Maximum Span: 38.7m (127.0ft)
Find on map >> Show street view
Structure Number: 53 264, Location: 07-LA-010S-18.59-LA (Lat: 34.056006, Lng: -118.211439), Route carried "under" structure: Interstate 10, Year Built: 1925, Structure Length: 0. m, Average Daily Traffic: 12,400 (year 2012), Truck Traffic: 2%, Features Intersected: I 10 BUSWAY & METROLINK, Facility Carried by Structure: STATE STREET
Minimum Vertical Clearance: 4.60m (15.09ft), Kilometerpoint: 18.590, Lanes on structure: 4, Lanes under structure: 3, Toll: On toll road, Material/Design: Concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 10.4m (34.1ft)
Structure Number: 53 264, Location: 07-LA-010S-18.59-LA (Lat: 34.056006, Lng: -118.211439), Route carried "under" structure: Interstate 10, Year Built: 1925, Structure Length: 0. m, Average Daily Traffic: 12,400 (year 2012), Truck Traffic: 2%, Features Intersected: I 10 BUSWAY & METROLINK, Facility Carried by Structure: STATE STREET
Minimum Vertical Clearance: 4.60m (15.09ft), Kilometerpoint: 18.590, Lanes on structure: 4, Lanes under structure: 3, Toll: On toll road, Material/Design: Concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 10.4m (34.1ft)
Find on map >> Show street view
Structure Number: 53 2644L, Location: 07-LA-005-16.90-LA (Lat: 34.033544, Lng: -118.221875), Route carried "under" structure: US 101, Year Built: 1960, Structure Length: 0. m, Average Daily Traffic: 136,000 (year 2019), Truck Traffic: 5%, Features Intersected: US 101, 7TH ST, ONRAMP, Facility Carried by Structure: I-5 SB, S5 TO W10
Minimum Vertical Clearance: 11.99m (39.34ft), Kilometerpoint: 0.030, Lanes on structure: 6, Lanes under structure: 6, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 44.5m (146.0ft)
Structure Number: 53 2644L, Location: 07-LA-005-16.90-LA (Lat: 34.033544, Lng: -118.221875), Route carried "under" structure: US 101, Year Built: 1960, Structure Length: 0. m, Average Daily Traffic: 136,000 (year 2019), Truck Traffic: 5%, Features Intersected: US 101, 7TH ST, ONRAMP, Facility Carried by Structure: I-5 SB, S5 TO W10
Minimum Vertical Clearance: 11.99m (39.34ft), Kilometerpoint: 0.030, Lanes on structure: 6, Lanes under structure: 6, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 44.5m (146.0ft)
Find on map >> Show street view
Structure Number: 53 2644L, Location: 07-LA-005-16.90-LA (Lat: 34.033544, Lng: -118.221875), Route carried "under" structure: City street L278, Year Built: 1960, Structure Length: 0. m, Average Daily Traffic: 22,078 (year 2019), Truck Traffic: 5%, Features Intersected: US 101, 7TH ST, ONRAMP, Facility Carried by Structure: I-5 SB, S5 TO W10
Minimum Vertical Clearance: 5.38m (17.65ft), Kilometerpoint: 0.000, Lanes on structure: 6, Lanes under structure: 5, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 44.5m (146.0ft)
Structure Number: 53 2644L, Location: 07-LA-005-16.90-LA (Lat: 34.033544, Lng: -118.221875), Route carried "under" structure: City street L278, Year Built: 1960, Structure Length: 0. m, Average Daily Traffic: 22,078 (year 2019), Truck Traffic: 5%, Features Intersected: US 101, 7TH ST, ONRAMP, Facility Carried by Structure: I-5 SB, S5 TO W10
Minimum Vertical Clearance: 5.38m (17.65ft), Kilometerpoint: 0.000, Lanes on structure: 6, Lanes under structure: 5, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 44.5m (146.0ft)
Find on map >> Show street view
Structure Number: 53 2647, Location: 07-LA-118-R4.64-LA (Lat: 34.272097, Lng: -118.555917), Route carried "under" structure: State highway 118, Year Built: 1980, Structure Length: 0. m, Average Daily Traffic: 222,000 (year 2020), Truck Traffic: 8%, Features Intersected: ROUTE 118, Facility Carried by Structure: TAMPA AVE
Minimum Vertical Clearance: 5.13m (16.83ft), Kilometerpoint: 4.640, Lanes on structure: 8, Lanes under structure: 10, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 32.9m (107.9ft)
Structure Number: 53 2647, Location: 07-LA-118-R4.64-LA (Lat: 34.272097, Lng: -118.555917), Route carried "under" structure: State highway 118, Year Built: 1980, Structure Length: 0. m, Average Daily Traffic: 222,000 (year 2020), Truck Traffic: 8%, Features Intersected: ROUTE 118, Facility Carried by Structure: TAMPA AVE
Minimum Vertical Clearance: 5.13m (16.83ft), Kilometerpoint: 4.640, Lanes on structure: 8, Lanes under structure: 10, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 32.9m (107.9ft)
Find on map >> Show street view
Structure Number: 53 2664F, Location: 07-LA-091-R6.51-LA (Lat: 33.873367, Lng: -118.282308), Route carried "under" structure: City street L042, Year Built: 1985, Structure Length: 0. m, Average Daily Traffic: 9,000 (year 2015), Truck Traffic: 2%, Features Intersected: FIGUEROA STREET, Facility Carried by Structure: W91-N110 CONN
Minimum Vertical Clearance: 5.89m (19.32ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 54.9m (180.1ft)
Structure Number: 53 2664F, Location: 07-LA-091-R6.51-LA (Lat: 33.873367, Lng: -118.282308), Route carried "under" structure: City street L042, Year Built: 1985, Structure Length: 0. m, Average Daily Traffic: 9,000 (year 2015), Truck Traffic: 2%, Features Intersected: FIGUEROA STREET, Facility Carried by Structure: W91-N110 CONN
Minimum Vertical Clearance: 5.89m (19.32ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 54.9m (180.1ft)
Find on map >> Show street view
Structure Number: 53 2665G, Location: 07-LA-091-R6.37-LA (Lat: 33.872289, Lng: -118.284506), Route carried "under" structure: Ramp Interstate 110, Year Built: 1985, Structure Length: 0. m, Average Daily Traffic: 4,700 (year 2011), Truck Traffic: 2%, Features Intersected: SR 91, N110-W91 CONN
Minimum Vertical Clearance: 5.44m (17.85ft), Kilometerpoint: 9.840, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 33.5m (109.9ft)
Structure Number: 53 2665G, Location: 07-LA-091-R6.37-LA (Lat: 33.872289, Lng: -118.284506), Route carried "under" structure: Ramp Interstate 110, Year Built: 1985, Structure Length: 0. m, Average Daily Traffic: 4,700 (year 2011), Truck Traffic: 2%, Features Intersected: SR 91, N110-W91 CONN
Minimum Vertical Clearance: 5.44m (17.85ft), Kilometerpoint: 9.840, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 33.5m (109.9ft)
Find on map >> Show street view
Structure Number: 53 2665G, Location: 07-LA-091-R6.37-LA (Lat: 33.872289, Lng: -118.284506), Route carried "under" structure: State highway 91, Year Built: 1985, Structure Length: 0. m, Average Daily Traffic: 200,000 (year 2011), Truck Traffic: 5%, Features Intersected: SR 91, N110-W91 CONN
Minimum Vertical Clearance: 7.62m (25.00ft), Kilometerpoint: 6.370, Lanes on structure: 2, Lanes under structure: 9, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 33.5m (109.9ft)
Structure Number: 53 2665G, Location: 07-LA-091-R6.37-LA (Lat: 33.872289, Lng: -118.284506), Route carried "under" structure: State highway 91, Year Built: 1985, Structure Length: 0. m, Average Daily Traffic: 200,000 (year 2011), Truck Traffic: 5%, Features Intersected: SR 91, N110-W91 CONN
Minimum Vertical Clearance: 7.62m (25.00ft), Kilometerpoint: 6.370, Lanes on structure: 2, Lanes under structure: 9, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 33.5m (109.9ft)
Find on map >> Show street view
Structure Number: 53 2667F, Location: 07-LA-110-9.83-LA (Lat: 33.872242, Lng: -118.286894), Route carried "under" structure: State highway 91, Year Built: 1985, Structure Length: 0. m, Average Daily Traffic: 44,500 (year 2015), Truck Traffic: 5%, Features Intersected: SR 91 EB
Minimum Vertical Clearance: 5.00m (16.40ft), Kilometerpoint: 6.230, Lanes on structure: 2, Lanes under structure: 3, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 45.4m (149.0ft)
Structure Number: 53 2667F, Location: 07-LA-110-9.83-LA (Lat: 33.872242, Lng: -118.286894), Route carried "under" structure: State highway 91, Year Built: 1985, Structure Length: 0. m, Average Daily Traffic: 44,500 (year 2015), Truck Traffic: 5%, Features Intersected: SR 91 EB
Minimum Vertical Clearance: 5.00m (16.40ft), Kilometerpoint: 6.230, Lanes on structure: 2, Lanes under structure: 3, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 45.4m (149.0ft)
Find on map >> Show street view
Structure Number: 53 2670G, Location: 07-LA-405-12.97-LA (Lat: 33.857994, Lng: -118.284164), Route carried "under" structure: Interstate 110, Year Built: 1985, Structure Length: 0. m, Average Daily Traffic: 141,500 (year 2011), Truck Traffic: 10%, Features Intersected: INTERSTATE N110
Minimum Vertical Clearance: 5.97m (19.59ft), Kilometerpoint: 8.890, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 40.5m (132.9ft)
Structure Number: 53 2670G, Location: 07-LA-405-12.97-LA (Lat: 33.857994, Lng: -118.284164), Route carried "under" structure: Interstate 110, Year Built: 1985, Structure Length: 0. m, Average Daily Traffic: 141,500 (year 2011), Truck Traffic: 10%, Features Intersected: INTERSTATE N110
Minimum Vertical Clearance: 5.97m (19.59ft), Kilometerpoint: 8.890, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 40.5m (132.9ft)
Find on map >> Show street view
Structure Number: 53 2671H, Location: 07-LA-110-8.92-LA (Lat: 33.859050, Lng: -118.285886), Route carried "under" structure: Ramp Interstate 110, Year Built: 1985, Structure Length: 0. m, Average Daily Traffic: 19,950 (year 2015), Truck Traffic: 2%, Features Intersected: S110-S405 CONNECTOR RAMP
Minimum Vertical Clearance: 5.23m (17.16ft), Kilometerpoint: 8.920, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 43.6m (143.0ft)
Structure Number: 53 2671H, Location: 07-LA-110-8.92-LA (Lat: 33.859050, Lng: -118.285886), Route carried "under" structure: Ramp Interstate 110, Year Built: 1985, Structure Length: 0. m, Average Daily Traffic: 19,950 (year 2015), Truck Traffic: 2%, Features Intersected: S110-S405 CONNECTOR RAMP
Minimum Vertical Clearance: 5.23m (17.16ft), Kilometerpoint: 8.920, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 43.6m (143.0ft)
Find on map >> Show street view
Structure Number: 53 2672, Location: 07-LA-110-13.83-LA (Lat: 33.929214, Lng: -118.286853), Route carried "under" structure: Ramp Interstate 110, Year Built: 1985, Structure Length: 0. m, Average Daily Traffic: 20,000 (year 2020), Truck Traffic: 1%, Features Intersected: S110-W105 CONNECTOR RAMP, Facility Carried by Structure: HOOVER STREET
Minimum Vertical Clearance: 5.03m (16.50ft), Kilometerpoint: 13.830, Lanes on structure: 4, Lanes under structure: 2, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 32.9m (107.9ft)
Structure Number: 53 2672, Location: 07-LA-110-13.83-LA (Lat: 33.929214, Lng: -118.286853), Route carried "under" structure: Ramp Interstate 110, Year Built: 1985, Structure Length: 0. m, Average Daily Traffic: 20,000 (year 2020), Truck Traffic: 1%, Features Intersected: S110-W105 CONNECTOR RAMP, Facility Carried by Structure: HOOVER STREET
Minimum Vertical Clearance: 5.03m (16.50ft), Kilometerpoint: 13.830, Lanes on structure: 4, Lanes under structure: 2, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 32.9m (107.9ft)
Find on map >> Show street view
Structure Number: 53 2673, Location: 07-LA-010S-17.20-LA (Lat: 34.054044, Lng: -118.233806), Route carried "under" structure: City street , Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 4,000 (year 2015), Truck Traffic: 4%, Features Intersected: 101 RAMPS & CITY STREETS, Facility Carried by Structure: E10/W10 BUSWAYS
Minimum Vertical Clearance: 5.52m (18.11ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 81.7m (268.0ft)
Structure Number: 53 2673, Location: 07-LA-010S-17.20-LA (Lat: 34.054044, Lng: -118.233806), Route carried "under" structure: City street , Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 4,000 (year 2015), Truck Traffic: 4%, Features Intersected: 101 RAMPS & CITY STREETS, Facility Carried by Structure: E10/W10 BUSWAYS
Minimum Vertical Clearance: 5.52m (18.11ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 81.7m (268.0ft)
Find on map >> Show street view
Structure Number: 53 2673, Location: 07-LA-010S-17.20-LA (Lat: 34.054044, Lng: -118.233806), Route carried "under" structure: Ramp Interstate 10, Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 3,000 (year 2015), Truck Traffic: 2%, Features Intersected: 101 RAMPS & CITY STREETS
Minimum Vertical Clearance: 5.20m (17.06ft), Kilometerpoint: 17.200, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 81.7m (268.0ft)
Structure Number: 53 2673, Location: 07-LA-010S-17.20-LA (Lat: 34.054044, Lng: -118.233806), Route carried "under" structure: Ramp Interstate 10, Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 3,000 (year 2015), Truck Traffic: 2%, Features Intersected: 101 RAMPS & CITY STREETS
Minimum Vertical Clearance: 5.20m (17.06ft), Kilometerpoint: 17.200, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 81.7m (268.0ft)
Find on map >> Show street view
Structure Number: 53 2673, Location: 07-LA-010S-17.20-LA (Lat: 34.054044, Lng: -118.233806), Route carried "under" structure: Ramp Interstate 10, Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 3,000 (year 2015), Truck Traffic: 2%, Features Intersected: 101 RAMPS & CITY STREETS
Minimum Vertical Clearance: 5.20m (17.06ft), Kilometerpoint: 17.200, Lanes on structure: 2, Lanes under structure: 1, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 81.7m (268.0ft)
Structure Number: 53 2673, Location: 07-LA-010S-17.20-LA (Lat: 34.054044, Lng: -118.233806), Route carried "under" structure: Ramp Interstate 10, Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 3,000 (year 2015), Truck Traffic: 2%, Features Intersected: 101 RAMPS & CITY STREETS
Minimum Vertical Clearance: 5.20m (17.06ft), Kilometerpoint: 17.200, Lanes on structure: 2, Lanes under structure: 1, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 81.7m (268.0ft)
Find on map >> Show street view
Structure Number: 53 2675K, Location: 07-LA-105-R6.83-LA (Lat: 33.929225, Lng: -118.290408), Route carried "under" structure: Ramp Interstate 110, Year Built: 1993, Structure Length: 0. m, Average Daily Traffic: 15,300 (year 2006), Truck Traffic: 2%, Features Intersected: S110-W105 CONNECTOR RAMP, Facility Carried by Structure: W105-VERMONT OFFRP
Minimum Vertical Clearance: 5.18m (16.99ft), Kilometerpoint: 13.850, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 61.0m (200.1ft)
Structure Number: 53 2675K, Location: 07-LA-105-R6.83-LA (Lat: 33.929225, Lng: -118.290408), Route carried "under" structure: Ramp Interstate 110, Year Built: 1993, Structure Length: 0. m, Average Daily Traffic: 15,300 (year 2006), Truck Traffic: 2%, Features Intersected: S110-W105 CONNECTOR RAMP, Facility Carried by Structure: W105-VERMONT OFFRP
Minimum Vertical Clearance: 5.18m (16.99ft), Kilometerpoint: 13.850, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 61.0m (200.1ft)
Find on map >> Show street view
Structure Number: 53 2676F, Location: 07-LA-105-R7.61-LA (Lat: 33.931572, Lng: -118.279711), Route carried "under" structure: City street L139, Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 9,000 (year 2006), Truck Traffic: 1%, Features Intersected: BROADWAY, IMPERIAL HWY, Facility Carried by Structure: W105-N110 CONN
Minimum Vertical Clearance: 7.62m (25.00ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 53.3m (174.9ft)
Structure Number: 53 2676F, Location: 07-LA-105-R7.61-LA (Lat: 33.931572, Lng: -118.279711), Route carried "under" structure: City street L139, Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 9,000 (year 2006), Truck Traffic: 1%, Features Intersected: BROADWAY, IMPERIAL HWY, Facility Carried by Structure: W105-N110 CONN
Minimum Vertical Clearance: 7.62m (25.00ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 53.3m (174.9ft)
Find on map >> Show street view
Structure Number: 53 2676F, Location: 07-LA-105-R7.61-LA (Lat: 33.931572, Lng: -118.279711), Route carried "under" structure: City street L100, Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 12,000 (year 2006), Truck Traffic: 2%, Features Intersected: BROADWAY, IMPERIAL HWY, Facility Carried by Structure: W105-N110 CONN
Minimum Vertical Clearance: 7.62m (25.00ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 53.3m (174.9ft)
Structure Number: 53 2676F, Location: 07-LA-105-R7.61-LA (Lat: 33.931572, Lng: -118.279711), Route carried "under" structure: City street L100, Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 12,000 (year 2006), Truck Traffic: 2%, Features Intersected: BROADWAY, IMPERIAL HWY, Facility Carried by Structure: W105-N110 CONN
Minimum Vertical Clearance: 7.62m (25.00ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 53.3m (174.9ft)
Find on map >> Show street view
Structure Number: 53 2677F, Location: 07-LA-110-13.95-LA (Lat: 33.928714, Lng: -118.277578), Route carried "under" structure: Ramp Interstate 110, Year Built: 1990, Structure Length: 0. m, Average Daily Traffic: 15,000 (year 2020), Truck Traffic: 1%, Features Intersected: I 110, N110-W105, HOV
Minimum Vertical Clearance: 5.33m (17.49ft), Kilometerpoint: 13.950, Lanes on structure: 1, Lanes under structure: 1, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 50.3m (165.0ft)
Structure Number: 53 2677F, Location: 07-LA-110-13.95-LA (Lat: 33.928714, Lng: -118.277578), Route carried "under" structure: Ramp Interstate 110, Year Built: 1990, Structure Length: 0. m, Average Daily Traffic: 15,000 (year 2020), Truck Traffic: 1%, Features Intersected: I 110, N110-W105, HOV
Minimum Vertical Clearance: 5.33m (17.49ft), Kilometerpoint: 13.950, Lanes on structure: 1, Lanes under structure: 1, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 50.3m (165.0ft)
Find on map >> Show street view
Structure Number: 53 2677F, Location: 07-LA-110-13.95-LA (Lat: 33.928714, Lng: -118.277578), Route carried "under" structure: Ramp Interstate 110, Year Built: 1990, Structure Length: 0. m, Average Daily Traffic: 15,700 (year 2020), Truck Traffic: 2%, Features Intersected: I 110, N110-W105, HOV
Minimum Vertical Clearance: 6.78m (22.24ft), Kilometerpoint: 13.950, Lanes on structure: 1, Lanes under structure: 1, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 50.3m (165.0ft)
Structure Number: 53 2677F, Location: 07-LA-110-13.95-LA (Lat: 33.928714, Lng: -118.277578), Route carried "under" structure: Ramp Interstate 110, Year Built: 1990, Structure Length: 0. m, Average Daily Traffic: 15,700 (year 2020), Truck Traffic: 2%, Features Intersected: I 110, N110-W105, HOV
Minimum Vertical Clearance: 6.78m (22.24ft), Kilometerpoint: 13.950, Lanes on structure: 1, Lanes under structure: 1, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 50.3m (165.0ft)
Find on map >> Show street view
Structure Number: 53 2677F, Location: 07-LA-110-13.95-LA (Lat: 33.928714, Lng: -118.277578), Route carried "under" structure: Ramp Interstate 110, Year Built: 1990, Structure Length: 0. m, Average Daily Traffic: 4,001 (year 2020), Truck Traffic: 2%, Features Intersected: I 110, N110-W105, HOV
Minimum Vertical Clearance: 6.22m (20.41ft), Kilometerpoint: 13.950, Lanes on structure: 1, Lanes under structure: 1, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 50.3m (165.0ft)
Structure Number: 53 2677F, Location: 07-LA-110-13.95-LA (Lat: 33.928714, Lng: -118.277578), Route carried "under" structure: Ramp Interstate 110, Year Built: 1990, Structure Length: 0. m, Average Daily Traffic: 4,001 (year 2020), Truck Traffic: 2%, Features Intersected: I 110, N110-W105, HOV
Minimum Vertical Clearance: 6.22m (20.41ft), Kilometerpoint: 13.950, Lanes on structure: 1, Lanes under structure: 1, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 50.3m (165.0ft)
Find on map >> Show street view
Structure Number: 53 2677F, Location: 07-LA-110-13.95-LA (Lat: 33.928714, Lng: -118.277578), Route carried "under" structure: Interstate 110, Year Built: 1990, Structure Length: 0. m, Average Daily Traffic: 300,000 (year 2020), Truck Traffic: 6%, Features Intersected: I 110, N110-W105, HOV
Minimum Vertical Clearance: 7.62m (25.00ft), Kilometerpoint: 13.950, Lanes on structure: 1, Lanes under structure: 4, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 50.3m (165.0ft)
Structure Number: 53 2677F, Location: 07-LA-110-13.95-LA (Lat: 33.928714, Lng: -118.277578), Route carried "under" structure: Interstate 110, Year Built: 1990, Structure Length: 0. m, Average Daily Traffic: 300,000 (year 2020), Truck Traffic: 6%, Features Intersected: I 110, N110-W105, HOV
Minimum Vertical Clearance: 7.62m (25.00ft), Kilometerpoint: 13.950, Lanes on structure: 1, Lanes under structure: 4, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 50.3m (165.0ft)
Find on map >> Show street view
Structure Number: 53 2677F, Location: 07-LA-110-13.95-LA (Lat: 33.928714, Lng: -118.277578), Route carried "under" structure: Ramp Interstate 110, Year Built: 1990, Structure Length: 0. m, Average Daily Traffic: 25,000 (year 2020), Truck Traffic: 2%, Features Intersected: I 110, N110-W105, HOV
Minimum Vertical Clearance: 6.35m (20.83ft), Kilometerpoint: 13.950, Lanes on structure: 1, Lanes under structure: 2, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 50.3m (165.0ft)
Structure Number: 53 2677F, Location: 07-LA-110-13.95-LA (Lat: 33.928714, Lng: -118.277578), Route carried "under" structure: Ramp Interstate 110, Year Built: 1990, Structure Length: 0. m, Average Daily Traffic: 25,000 (year 2020), Truck Traffic: 2%, Features Intersected: I 110, N110-W105, HOV
Minimum Vertical Clearance: 6.35m (20.83ft), Kilometerpoint: 13.950, Lanes on structure: 1, Lanes under structure: 2, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 50.3m (165.0ft)
Find on map >> Show street view
Structure Number: 53 2679F, Location: 07-LA-110-13.82-LA (Lat: 33.928108, Lng: -118.273581), Route carried "under" structure: City street L139, Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 2,500 (year 2020), Truck Traffic: 1%, Features Intersected: BROADWAY, Facility Carried by Structure: S110-E105 HOV CONN
Minimum Vertical Clearance: 5.05m (16.57ft), Kilometerpoint: 0.000, Lanes on structure: 1, Lanes under structure: 4, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 46.3m (151.9ft)
Structure Number: 53 2679F, Location: 07-LA-110-13.82-LA (Lat: 33.928108, Lng: -118.273581), Route carried "under" structure: City street L139, Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 2,500 (year 2020), Truck Traffic: 1%, Features Intersected: BROADWAY, Facility Carried by Structure: S110-E105 HOV CONN
Minimum Vertical Clearance: 5.05m (16.57ft), Kilometerpoint: 0.000, Lanes on structure: 1, Lanes under structure: 4, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 46.3m (151.9ft)
Find on map >> Show street view
Structure Number: 53 2680F, Location: 07-LA-105-R7.80-LA (Lat: 33.931544, Lng: -118.280533), Route carried "under" structure: Interstate 110, Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 300,000 (year 2009), Truck Traffic: 6%, Features Intersected: 105 WB,110 NB,BRDWY,IMPR
Minimum Vertical Clearance: 7.62m (25.00ft), Kilometerpoint: 13.970, Lanes on structure: 1, Lanes under structure: 4, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 51.8m (169.9ft)
Structure Number: 53 2680F, Location: 07-LA-105-R7.80-LA (Lat: 33.931544, Lng: -118.280533), Route carried "under" structure: Interstate 110, Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 300,000 (year 2009), Truck Traffic: 6%, Features Intersected: 105 WB,110 NB,BRDWY,IMPR
Minimum Vertical Clearance: 7.62m (25.00ft), Kilometerpoint: 13.970, Lanes on structure: 1, Lanes under structure: 4, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 51.8m (169.9ft)
Find on map >> Show street view
Structure Number: 53 2680F, Location: 07-LA-105-R7.80-LA (Lat: 33.931544, Lng: -118.280533), Route carried "under" structure: Interstate 105, Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 220,000 (year 2009), Truck Traffic: 6%, Features Intersected: 105 WB,110 NB,BRDWY,IMPR
Minimum Vertical Clearance: 7.62m (25.00ft), Kilometerpoint: 7.260, Lanes on structure: 1, Lanes under structure: 5, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 51.8m (169.9ft)
Structure Number: 53 2680F, Location: 07-LA-105-R7.80-LA (Lat: 33.931544, Lng: -118.280533), Route carried "under" structure: Interstate 105, Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 220,000 (year 2009), Truck Traffic: 6%, Features Intersected: 105 WB,110 NB,BRDWY,IMPR
Minimum Vertical Clearance: 7.62m (25.00ft), Kilometerpoint: 7.260, Lanes on structure: 1, Lanes under structure: 5, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 51.8m (169.9ft)
Find on map >> Show street view
Structure Number: 53 2680F, Location: 07-LA-105-R7.80-LA (Lat: 33.931544, Lng: -118.280533), Route carried "under" structure: Ramp Interstate 105, Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 15,300 (year 2009), Truck Traffic: 2%, Features Intersected: 105 WB,110 NB,BRDWY,IMPR
Minimum Vertical Clearance: 5.63m (18.47ft), Kilometerpoint: 7.500, Lanes on structure: 1, Lanes under structure: 2, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 51.8m (169.9ft)
Structure Number: 53 2680F, Location: 07-LA-105-R7.80-LA (Lat: 33.931544, Lng: -118.280533), Route carried "under" structure: Ramp Interstate 105, Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 15,300 (year 2009), Truck Traffic: 2%, Features Intersected: 105 WB,110 NB,BRDWY,IMPR
Minimum Vertical Clearance: 5.63m (18.47ft), Kilometerpoint: 7.500, Lanes on structure: 1, Lanes under structure: 2, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 51.8m (169.9ft)
Find on map >> Show street view
Structure Number: 53 2680F, Location: 07-LA-105-R7.80-LA (Lat: 33.931544, Lng: -118.280533), Route carried "under" structure: Ramp Interstate 105, Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 15,300 (year 2009), Truck Traffic: 2%, Features Intersected: 105 WB,110 NB,BRDWY,IMPR
Minimum Vertical Clearance: 6.73m (22.08ft), Kilometerpoint: 7.500, Lanes on structure: 1, Lanes under structure: 2, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 51.8m (169.9ft)
Structure Number: 53 2680F, Location: 07-LA-105-R7.80-LA (Lat: 33.931544, Lng: -118.280533), Route carried "under" structure: Ramp Interstate 105, Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 15,300 (year 2009), Truck Traffic: 2%, Features Intersected: 105 WB,110 NB,BRDWY,IMPR
Minimum Vertical Clearance: 6.73m (22.08ft), Kilometerpoint: 7.500, Lanes on structure: 1, Lanes under structure: 2, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 51.8m (169.9ft)
Find on map >> Show street view
Structure Number: 53 2680F, Location: 07-LA-105-R7.80-LA (Lat: 33.931544, Lng: -118.280533), Route carried "under" structure: City street L143, Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 12,000 (year 2009), Truck Traffic: 1%, Features Intersected: 105 WB,110 NB,BRDWY,IMPR, Facility Carried by Structure: W105-N110 HOV CONN
Minimum Vertical Clearance: 7.62m (25.00ft), Kilometerpoint: 0.000, Lanes on structure: 1, Lanes under structure: 4, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 51.8m (169.9ft)
Structure Number: 53 2680F, Location: 07-LA-105-R7.80-LA (Lat: 33.931544, Lng: -118.280533), Route carried "under" structure: City street L143, Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 12,000 (year 2009), Truck Traffic: 1%, Features Intersected: 105 WB,110 NB,BRDWY,IMPR, Facility Carried by Structure: W105-N110 HOV CONN
Minimum Vertical Clearance: 7.62m (25.00ft), Kilometerpoint: 0.000, Lanes on structure: 1, Lanes under structure: 4, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 51.8m (169.9ft)
Find on map >> Show street view
Structure Number: 53 2680F, Location: 07-LA-105-R7.80-LA (Lat: 33.931544, Lng: -118.280533), Route carried "under" structure: City street L100, Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 36,000 (year 2009), Truck Traffic: 1%, Features Intersected: 105 WB,110 NB,BRDWY,IMPR, Facility Carried by Structure: W105-N110 HOV CONN
Minimum Vertical Clearance: 7.62m (25.00ft), Kilometerpoint: 0.000, Lanes on structure: 1, Lanes under structure: 6, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 51.8m (169.9ft)
Structure Number: 53 2680F, Location: 07-LA-105-R7.80-LA (Lat: 33.931544, Lng: -118.280533), Route carried "under" structure: City street L100, Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 36,000 (year 2009), Truck Traffic: 1%, Features Intersected: 105 WB,110 NB,BRDWY,IMPR, Facility Carried by Structure: W105-N110 HOV CONN
Minimum Vertical Clearance: 7.62m (25.00ft), Kilometerpoint: 0.000, Lanes on structure: 1, Lanes under structure: 6, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 51.8m (169.9ft)
Find on map >> Show street view
Structure Number: 53 2680F, Location: 07-LA-105-R7.80-LA (Lat: 33.931544, Lng: -118.280533), Route carried "under" structure: City street L139, Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 12,500 (year 2009), Truck Traffic: 1%, Features Intersected: 105 WB,110 NB,BRDWY,IMPR, Facility Carried by Structure: W105-N110 HOV CONN
Minimum Vertical Clearance: 7.62m (25.00ft), Kilometerpoint: 0.000, Lanes on structure: 1, Lanes under structure: 4, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 51.8m (169.9ft)
Structure Number: 53 2680F, Location: 07-LA-105-R7.80-LA (Lat: 33.931544, Lng: -118.280533), Route carried "under" structure: City street L139, Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 12,500 (year 2009), Truck Traffic: 1%, Features Intersected: 105 WB,110 NB,BRDWY,IMPR, Facility Carried by Structure: W105-N110 HOV CONN
Minimum Vertical Clearance: 7.62m (25.00ft), Kilometerpoint: 0.000, Lanes on structure: 1, Lanes under structure: 4, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 51.8m (169.9ft)
Find on map >> Show street view
Structure Number: 53 2682E, Location: 07-LA-105-R7.11-LA (Lat: 33.928617, Lng: -118.285644), Route carried "under" structure: City street Q720, Year Built: 1993, Structure Length: 0. m, Average Daily Traffic: 3,000 (year 2010), Truck Traffic: 1%, Features Intersected: 105 WB & 110 SB, STS, Facility Carried by Structure: E105-N110 HOV
Minimum Vertical Clearance: 5.21m (17.09ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 47.2m (154.9ft)
Structure Number: 53 2682E, Location: 07-LA-105-R7.11-LA (Lat: 33.928617, Lng: -118.285644), Route carried "under" structure: City street Q720, Year Built: 1993, Structure Length: 0. m, Average Daily Traffic: 3,000 (year 2010), Truck Traffic: 1%, Features Intersected: 105 WB & 110 SB, STS, Facility Carried by Structure: E105-N110 HOV
Minimum Vertical Clearance: 5.21m (17.09ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 47.2m (154.9ft)
Find on map >> Show street view
Structure Number: 53 2682E, Location: 07-LA-105-R7.11-LA (Lat: 33.928617, Lng: -118.285644), Route carried "under" structure: City street L100, Year Built: 1993, Structure Length: 0. m, Average Daily Traffic: 36,000 (year 2010), Truck Traffic: 1%, Features Intersected: 105 WB & 110 SB, STS, Facility Carried by Structure: E105-N110 HOV
Minimum Vertical Clearance: 7.62m (25.00ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 6, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 47.2m (154.9ft)
Structure Number: 53 2682E, Location: 07-LA-105-R7.11-LA (Lat: 33.928617, Lng: -118.285644), Route carried "under" structure: City street L100, Year Built: 1993, Structure Length: 0. m, Average Daily Traffic: 36,000 (year 2010), Truck Traffic: 1%, Features Intersected: 105 WB & 110 SB, STS, Facility Carried by Structure: E105-N110 HOV
Minimum Vertical Clearance: 7.62m (25.00ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 6, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 47.2m (154.9ft)
Find on map >> Show street view
Structure Number: 53 2682E, Location: 07-LA-105-R7.11-LA (Lat: 33.928617, Lng: -118.285644), Route carried "under" structure: Bypass Interstate 110, Year Built: 1993, Structure Length: 0. m, Average Daily Traffic: 2,500 (year 2010), Truck Traffic: 2%, Features Intersected: 105 WB & 110 SB, STS
Minimum Vertical Clearance: 7.62m (25.00ft), Kilometerpoint: 13.850, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 47.2m (154.9ft)
Structure Number: 53 2682E, Location: 07-LA-105-R7.11-LA (Lat: 33.928617, Lng: -118.285644), Route carried "under" structure: Bypass Interstate 110, Year Built: 1993, Structure Length: 0. m, Average Daily Traffic: 2,500 (year 2010), Truck Traffic: 2%, Features Intersected: 105 WB & 110 SB, STS
Minimum Vertical Clearance: 7.62m (25.00ft), Kilometerpoint: 13.850, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 47.2m (154.9ft)
Find on map >> Show street view
Structure Number: 53 2682E, Location: 07-LA-105-R7.11-LA (Lat: 33.928617, Lng: -118.285644), Route carried "under" structure: Ramp Interstate 110, Year Built: 1993, Structure Length: 0. m, Average Daily Traffic: 22,000 (year 2017), Truck Traffic: 1%, Features Intersected: 105 WB & 110 SB, STS
Minimum Vertical Clearance: 7.62m (25.00ft), Kilometerpoint: 13.850, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 47.2m (154.9ft)
Structure Number: 53 2682E, Location: 07-LA-105-R7.11-LA (Lat: 33.928617, Lng: -118.285644), Route carried "under" structure: Ramp Interstate 110, Year Built: 1993, Structure Length: 0. m, Average Daily Traffic: 22,000 (year 2017), Truck Traffic: 1%, Features Intersected: 105 WB & 110 SB, STS
Minimum Vertical Clearance: 7.62m (25.00ft), Kilometerpoint: 13.850, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 47.2m (154.9ft)
Find on map >> Show street view
Structure Number: 53 2682E, Location: 07-LA-105-R7.11-LA (Lat: 33.928617, Lng: -118.285644), Route carried "under" structure: Interstate 105, Year Built: 1993, Structure Length: 0. m, Average Daily Traffic: 220,000 (year 2009), Truck Traffic: 6%, Features Intersected: 105 WB & 110 SB, STS
Minimum Vertical Clearance: 5.53m (18.14ft), Kilometerpoint: 7.260, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 47.2m (154.9ft)
Structure Number: 53 2682E, Location: 07-LA-105-R7.11-LA (Lat: 33.928617, Lng: -118.285644), Route carried "under" structure: Interstate 105, Year Built: 1993, Structure Length: 0. m, Average Daily Traffic: 220,000 (year 2009), Truck Traffic: 6%, Features Intersected: 105 WB & 110 SB, STS
Minimum Vertical Clearance: 5.53m (18.14ft), Kilometerpoint: 7.260, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 47.2m (154.9ft)
Find on map >> Show street view
Structure Number: 53 2682E, Location: 07-LA-105-R7.11-LA (Lat: 33.928617, Lng: -118.285644), Route carried "under" structure: Interstate 110, Year Built: 1993, Structure Length: 0. m, Average Daily Traffic: 247,000 (year 2010), Truck Traffic: 6%, Features Intersected: 105 WB & 110 SB, STS
Minimum Vertical Clearance: 7.62m (25.00ft), Kilometerpoint: 13.850, Lanes on structure: 2, Lanes under structure: 8, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 47.2m (154.9ft)
Structure Number: 53 2682E, Location: 07-LA-105-R7.11-LA (Lat: 33.928617, Lng: -118.285644), Route carried "under" structure: Interstate 110, Year Built: 1993, Structure Length: 0. m, Average Daily Traffic: 247,000 (year 2010), Truck Traffic: 6%, Features Intersected: 105 WB & 110 SB, STS
Minimum Vertical Clearance: 7.62m (25.00ft), Kilometerpoint: 13.850, Lanes on structure: 2, Lanes under structure: 8, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 47.2m (154.9ft)
Find on map >> Show street view
Structure Number: 53 2682E, Location: 07-LA-105-R7.11-LA (Lat: 33.928617, Lng: -118.285644), Route carried "under" structure: Ramp Interstate 110, Year Built: 1993, Structure Length: 0. m, Average Daily Traffic: 18,700 (year 2017), Truck Traffic: 2%, Features Intersected: 105 WB & 110 SB, STS
Minimum Vertical Clearance: 7.62m (25.00ft), Kilometerpoint: 13.850, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 47.2m (154.9ft)
Structure Number: 53 2682E, Location: 07-LA-105-R7.11-LA (Lat: 33.928617, Lng: -118.285644), Route carried "under" structure: Ramp Interstate 110, Year Built: 1993, Structure Length: 0. m, Average Daily Traffic: 18,700 (year 2017), Truck Traffic: 2%, Features Intersected: 105 WB & 110 SB, STS
Minimum Vertical Clearance: 7.62m (25.00ft), Kilometerpoint: 13.850, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 47.2m (154.9ft)
Find on map >> Show street view
Structure Number: 53 2683K, Location: 07-LA-110-13.89-LA (Lat: 33.930044, Lng: -118.281539), Route carried "under" structure: Ramp Interstate 110, Year Built: 1987, Structure Length: 0. m, Average Daily Traffic: 44,000 (year 2020), Truck Traffic: 7%, Features Intersected: S110-W105 CONNECTOR RAMP
Minimum Vertical Clearance: 5.59m (18.34ft), Kilometerpoint: 13.890, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 38.1m (125.0ft)
Structure Number: 53 2683K, Location: 07-LA-110-13.89-LA (Lat: 33.930044, Lng: -118.281539), Route carried "under" structure: Ramp Interstate 110, Year Built: 1987, Structure Length: 0. m, Average Daily Traffic: 44,000 (year 2020), Truck Traffic: 7%, Features Intersected: S110-W105 CONNECTOR RAMP
Minimum Vertical Clearance: 5.59m (18.34ft), Kilometerpoint: 13.890, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 38.1m (125.0ft)