Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Los Angeles, California (CA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 2,325Number of bridges
  • 39,718ft / 12,106mTotal length
  • $98,718,000Total costs
  • 180,570,830Total average daily traffic
  • 9,950,919Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Los Angeles
  • No street view available for this location

New bridges in Los Angeles, CA - historical statistics
  • New bridges - historical statistics
  • 121900-1909
  • 41910-1919
  • 431920-1929
  • 721930-1939
  • 1701940-1949
  • 5201950-1959
  • 6961960-1969
  • 3091970-1979
  • 1881980-1989
  • 2231990-1999
  • 512000-2009
  • 372010-2019
Reconstructed bridges in Los Angeles, CA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11920-1929
  • 31930-1939
  • 51940-1949
  • 181950-1959
  • 501960-1969
  • 341970-1979
  • 461980-1989
  • 421990-1999
  • 702000-2009
  • 132010-2019
Average Bridge Truck Traffic in Los Angeles, CA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 81.7%Good
  • 1.1%Satisfactory
  • 15.5%Fair
  • 1.7%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 0.5%Very good
  • 89.2%Good
  • 1.1%Satisfactory
  • 9.2%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 94.1%Good
  • 2.3%Satisfactory
  • 3.4%Fair
  • 0.2%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 16.2%Excellent
  • 77.2%Very good
  • 2.7%Good
  • 2.2%Satisfactory
  • 1.7%Fair
  • 0.5%Poor
  • 0.2%Serious
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 76.5%Good
  • 23.5%Satisfactory
Find on map >>   Show street view

Structure Number: 53C2113,  Location: 100FT NE FWY 5 (Lat: 34.120811,  Lng: -118.270433),  Route carried "under" structure: City street ,  Year Built: 2001,  Structure Length: 0. m,  Average Daily Traffic: 47,000 (year 2005),  Truck Traffic: 2%,  Features Intersected: LOS FELIZ BLVD,  Facility Carried by Structure: PEDESTRIAN WALKWAY
Minimum Vertical Clearance: 4.52m (14.83ft),  Kilometerpoint: 0.000,  Lanes under structure: 6,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 34.9m (114.5ft)

Find on map >>   Show street view

Structure Number: 53C2148,  Location: ALAMEDA & COMMERCIAL ST. (Lat: 34.053192,  Lng: -118.237700),  Route carried "under" structure: US 101,  Year Built: 2007,  Structure Length: 0. m,  Average Daily Traffic: 140,000 (year 2011),  Truck Traffic: 5%,  Features Intersected: US HWY 101, BUSWAY, COMM,  Facility Carried by Structure: RAIL
Minimum Vertical Clearance: 5.80m (19.03ft),  Kilometerpoint: 0.600,  Lanes under structure: 8,  Material/Design: Concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 47.1m (154.5ft)

Find on map >>   Show street view

Structure Number: 53C2148,  Location: ALAMEDA & COMMERCIAL ST. (Lat: 34.053192,  Lng: -118.237700),  Route carried "under" structure: City street ,  Year Built: 2007,  Structure Length: 0. m,  Average Daily Traffic: 14,000 (year 2011),  Truck Traffic: 5%,  Features Intersected: US HWY 101, BUSWAY, COMM,  Facility Carried by Structure: RAIL
Minimum Vertical Clearance: 4.60m (15.09ft),  Kilometerpoint: 0.000,  Lanes under structure: 4,  Material/Design: Concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 47.1m (154.5ft)

Find on map >>   Show street view

Structure Number: 53C2149,  Location: 0.3 M NW CESAR CHAVEZ AVE (Lat: 34.060222,  Lng: -118.233636),  Route carried "under" structure: City street ,  Year Built: 2003,  Structure Length: 0. m,  Average Daily Traffic: 9,600 (year 2016),  Truck Traffic: 2%,  Features Intersected: VIGNES ST,  Facility Carried by Structure: MTA BLUE LINE
Minimum Vertical Clearance: 7.30m (23.95ft),  Kilometerpoint: 0.000,  Lanes under structure: 5,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 41.8m (137.1ft)

Find on map >>   Show street view

Structure Number: 53C215,  Location: 50FT W/O N. ALAMEDA ST (Lat: 34.063494,  Lng: -118.235883),  Route carried "under" structure: City street ,  Year Built: 2003,  Structure Length: 0. m,  Average Daily Traffic: 6,262 (year 2016),  Truck Traffic: 1%,  Features Intersected: COLLEGE ST,  Facility Carried by Structure: UP RR
Minimum Vertical Clearance: 7.10m (23.29ft),  Kilometerpoint: 0.000,  Lanes under structure: 5,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 32.0m (105.0ft)

Find on map >>   Show street view

Structure Number: 53C2152,  Location: 200 FT N/O ALPINE ST (Lat: 34.062311,  Lng: -118.236006),  Route carried "under" structure: City street ,  Year Built: 2003,  Structure Length: 0. m,  Average Daily Traffic: 21,170 (year 2016),  Truck Traffic: 2%,  Features Intersected: N. ALAMEDA STREET,  Facility Carried by Structure: UP RR
Minimum Vertical Clearance: 7.25m (23.79ft),  Kilometerpoint: 0.000,  Lanes under structure: 5,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 39.3m (128.9ft)

Find on map >>   Show street view

Structure Number: 53C2153,  Location: 0.07 M EAST N. ALAMEDA S (Lat: 34.061256,  Lng: -118.235078),  Route carried "under" structure: City street ,  Year Built: 2003,  Structure Length: 0. m,  Average Daily Traffic: 10,000 (year 2016),  Truck Traffic: 2%,  Features Intersected: N. MAIN ST & VIGNES AVE,  Facility Carried by Structure: UP RR
Minimum Vertical Clearance: 5.90m (19.36ft),  Kilometerpoint: 0.000,  Lanes under structure: 5,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 48.5m (159.1ft)

Find on map >>   Show street view

Structure Number: 53C2153,  Location: 0.07 M EAST N. ALAMEDA S (Lat: 34.061256,  Lng: -118.235078),  Route carried "under" structure: City street ,  Year Built: 2003,  Structure Length: 0. m,  Average Daily Traffic: 7,000 (year 2016),  Truck Traffic: 5%,  Features Intersected: N. MAIN ST & VIGNES AVE,  Facility Carried by Structure: UP RR
Minimum Vertical Clearance: 6.50m (21.33ft),  Kilometerpoint: 0.000,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 48.5m (159.1ft)

Find on map >>   Show street view

Structure Number: 53C2252,  Location: .1 MI E OF BIXEL (Lat: 34.051519,  Lng: -118.263264),  Route carried "under" structure: City street ,  Year Built: 2007,  Structure Length: 0. m,  Average Daily Traffic: 1,324 (year 2008),  Truck Traffic: 3%,  Features Intersected: INGRAHAM STREET,  Facility Carried by Structure: PEDESTRIAN WALKWAY
Minimum Vertical Clearance: 7.16m (23.49ft),  Kilometerpoint: 0.000,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 18.3m (60.0ft)

Find on map >>   Show street view

Structure Number: 53C2253,  Location: 0.1 MI S OLYMPIC (Lat: 34.045036,  Lng: -118.267706),  Route carried "under" structure: City street ,  Year Built: 2011,  Structure Length: 0. m,  Average Daily Traffic: 1,567 (year 2008),  Truck Traffic: 2%,  Features Intersected: GEORGIA ST,  Facility Carried by Structure: PEDESTRIAN WALKWAY
Minimum Vertical Clearance: 8.84m (29.00ft),  Kilometerpoint: 0.000,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.3m (99.4ft)

Find on map >>   Show street view

Structure Number: 53C2254,  Location: JUST S OF CESAR CHAVEZ (Lat: 34.062044,  Lng: -118.246842),  Route carried "under" structure: City street ,  Year Built: 2007,  Structure Length: 0. m,  Average Daily Traffic: 23,000 (year 2011),  Truck Traffic: 1%,  Features Intersected: FIGUEROA STREET,  Facility Carried by Structure: PEDESTRIAN WALKWAY
Minimum Vertical Clearance: 6.83m (22.41ft),  Kilometerpoint: 0.000,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Truss - Thru,  Length of Maximum Span: 33.1m (108.6ft)

Find on map >>   Show street view

Structure Number: 53C2256,  Location: .1MI S OF 7TH ST (Lat: 34.050433,  Lng: -118.264728),  Route carried "under" structure: City street ,  Year Built: 2005,  Structure Length: 0. m,  Average Daily Traffic: 7,500 (year 2018),  Truck Traffic: 2%,  Features Intersected: BIXEL ST,  Facility Carried by Structure: PEDESTRIAN WALKWAY
Minimum Vertical Clearance: 5.40m (17.72ft),  Kilometerpoint: 0.000,  Lanes under structure: 3,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 32.0m (105.0ft)

Find on map >>   Show street view

Structure Number: 53C2257,  Location: .1 M WEST OF BIXEL ST. (Lat: 34.049522,  Lng: -118.265414),  Route carried "under" structure: City street ,  Year Built: 2005,  Structure Length: 0. m,  Average Daily Traffic: 6,000 (year 2018),  Truck Traffic: 2%,  Features Intersected: 8TH STREET,  Facility Carried by Structure: PEDESTRIAN WALKWAY
Minimum Vertical Clearance: 7.40m (24.28ft),  Kilometerpoint: 0.000,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 26.2m (86.0ft)

Find on map >>   Show street view

Structure Number: 53C2259,  Location: JUST EAST OF FIGUEROA ST. (Lat: 34.062067,  Lng: -118.245853),  Route carried "under" structure: City street ,  Year Built: 2007,  Structure Length: 0. m,  Average Daily Traffic: 7,000 (year 2018),  Truck Traffic: 2%,  Features Intersected: CESAR E CHAVEZ AVE,  Facility Carried by Structure: PEDESTRIAN WALKWAY
Minimum Vertical Clearance: 6.40m (21.00ft),  Kilometerpoint: 0.000,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 35.5m (116.5ft)

Find on map >>   Show street view

Structure Number: 53C2299,  Location: .04 MI S OF W OF OFARRELL (Lat: 33.746517,  Lng: -118.292556),  Route carried "under" structure: State highway 110,  Year Built: 1970,  Structure Length: 0. m,  Average Daily Traffic: 44,250 (year 2009),  Truck Traffic: 3%,  Features Intersected: GAFFEY,  Facility Carried by Structure: PEDESTRIAN WALKWAY
Minimum Vertical Clearance: 5.87m (19.26ft),  Kilometerpoint: 0.750,  Lanes under structure: 7,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 44.2m (145.0ft)

Discuss Los Angeles, California (CA) on our hugely popular California forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.