Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Tucson, Arizona (AZ)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 573Number of bridges
  • 5,620ft / 1,713mTotal length
  • $151,000Total costs
  • 12,896,552Total average daily traffic
  • 1,465,120Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Tucson
  • No street view available for this location

New bridges in Tucson, AZ - historical statistics
  • New bridges - historical statistics
  • 21910-1919
  • 51920-1929
  • 141930-1939
  • 61940-1949
  • 371950-1959
  • 1201960-1969
  • 541970-1979
  • 1671980-1989
  • 701990-1999
  • 472000-2009
  • 462010-2019
  • 52020-2022
Reconstructed bridges in Tucson, AZ - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 31930-1939
  • 11940-1949
  • 41950-1959
  • 151960-1969
  • 141970-1979
  • 181980-1989
  • 121990-1999
  • 102000-2009
  • 22010-2019
Average Bridge Daily Traffic in Tucson, AZ
Average Bridge Truck Traffic in Tucson, AZ
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 8.3%Very good
  • 45.3%Good
  • 32.3%Satisfactory
  • 13.5%Fair
  • 0.5%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 1.0%Excellent
  • 16.6%Very good
  • 51.8%Good
  • 25.6%Satisfactory
  • 5.0%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 0.5%Excellent
  • 8.0%Very good
  • 68.8%Good
  • 20.6%Satisfactory
  • 2.0%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 1.9%Excellent
  • 6.1%Very good
  • 64.0%Good
  • 22.5%Satisfactory
  • 3.7%Fair
  • 1.3%Poor
  • 0.5%Serious
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 5.0%Very good
  • 79.9%Good
  • 14.4%Satisfactory
  • 0.7%Fair
Find on map >>   Show street view

Structure Number: 9938,  Location: 0.13 mi E of Granada Ave (Lat: 32.221500,  Lng: -110.973800),  Route carried "under" structure: City street ,  Year Built: 1986,  Structure Length: 0. m,  Average Daily Traffic: 25,486 (year 2020),  Truck Traffic: 10%,  Features Intersected: Congress St,  Facility Carried by Structure: Congress St Ped UP
Minimum Vertical Clearance: 4.96m (16.27ft),  Kilometerpoint: 0.000,  Lanes under structure: 5,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 24.7m (81.0ft)

Find on map >>   Show street view

Structure Number: 9944,  Location: 0.08 mi E of jct I-10 (Lat: 32.250300,  Lng: -110.991700),  Route carried "under" structure: City street ,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 31,565 (year 2020),  Truck Traffic: 10%,  Features Intersected: Grant Road,  Facility Carried by Structure: SPRR
Minimum Vertical Clearance: 4.43m (14.53ft),  Kilometerpoint: 0.000,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 15.8m (51.8ft)

Find on map >>   Show street view

Structure Number: 9945,  Location: 0.16 mi E of I 10 (Lat: 32.235700,  Lng: -110.981300),  Route carried "under" structure: City street ,  Year Built: 1958,  Structure Length: 0. m,  Average Daily Traffic: 35,508 (year 2020),  Truck Traffic: 10%,  Features Intersected: Speedway Blvd,  Facility Carried by Structure: Yuma Street
Minimum Vertical Clearance: 4.56m (14.96ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Length of Maximum Span: 12.5m (41.0ft)

Find on map >>   Show street view

Structure Number: 9946,  Location: 0.15 mi E of I 10 (Lat: 32.235700,  Lng: -110.981800),  Route carried "under" structure: City street ,  Year Built: 1958,  Structure Length: 0. m,  Average Daily Traffic: 35,508 (year 2020),  Truck Traffic: 10%,  Features Intersected: Speedway Blvd,  Facility Carried by Structure: Van Alstine Drive
Minimum Vertical Clearance: 4.36m (14.30ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Length of Maximum Span: 12.2m (40.0ft)

Find on map >>   Show street view

Structure Number: 9955,  Location: 0.08 W of Church St (Lat: 32.222400,  Lng: -110.973900),  Route carried "under" structure: City street ,  Year Built: 1985,  Structure Length: 0. m,  Average Daily Traffic: 1,562 (year 2019),  Truck Traffic: 5%,  Features Intersected: Pennington Street,  Facility Carried by Structure: Pedestrian X-ing
Minimum Vertical Clearance: 4.87m (15.98ft),  Kilometerpoint: 0.000,  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Length of Maximum Span: 14.0m (45.9ft)

Find on map >>   Show street view

Structure Number: 9956,  Location: 500 ft W of Church St (Lat: 32.222400,  Lng: -110.973500),  Route carried "under" structure: City street ,  Year Built: 1985,  Structure Length: 0. m,  Average Daily Traffic: 1,562 (year 2020),  Truck Traffic: 5%,  Features Intersected: Pennington Street,  Facility Carried by Structure: Pedestrian X-ing
Minimum Vertical Clearance: 4.65m (15.26ft),  Kilometerpoint: 0.000,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 14.0m (45.9ft)

Find on map >>   Show street view

Structure Number: 9974,  Location: 0.3 mi S Jct 29th St (Lat: 32.194900,  Lng: -110.910700),  Route carried "under" structure: City street ,  Year Built: 1984,  Structure Length: 0. m,  Average Daily Traffic: 694 (year 2020),  Truck Traffic: 5%,  Features Intersected: 34-36 Connection,  Facility Carried by Structure: Alvernon Way
Minimum Vertical Clearance: 4.97m (16.31ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 21.0m (68.9ft)

Find on map >>   Show street view

Structure Number: 10008,  Location: 1 mi E Jct Sabino Cyn Rd (Lat: 32.253300,  Lng: -110.823800),  Route carried "under" structure: City street ,  Year Built: 1985,  Structure Length: 0. m,  Average Daily Traffic: 27,078 (year 2018),  Truck Traffic: 5%,  Features Intersected: Pantano Rd,  Facility Carried by Structure: Tanque Verde Road
Minimum Vertical Clearance: 5.69m (18.67ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 49.7m (163.1ft)

Find on map >>   Show street view

Structure Number: 10437,  Location: 0.11 mi W of Euclid Ave (Lat: 32.221200,  Lng: -110.961300),  Route carried "under" structure: City street ,  Year Built: 2000,  Structure Length: 0. m,  Average Daily Traffic: 26,194 (year 2020),  Truck Traffic: 10%,  Features Intersected: Broadway Blvd.,  Facility Carried by Structure: Cycle/Pedestr. OP
Minimum Vertical Clearance: 5.47m (17.95ft),  Kilometerpoint: 0.000,  Lanes under structure: 10,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 42.7m (140.1ft)

Find on map >>   Show street view

Structure Number: 10501,  Location: Palo Verde Rd at UPRR (Lat: 32.190561,  Lng: -110.915889),  Route carried "under" structure: State highway 210,  Year Built: 2012,  Structure Length: 0. m,  Average Daily Traffic: 15,658 (year 2020),  Truck Traffic: 5%,  Features Intersected: UPRR/36th St,  Facility Carried by Structure: Palo Verde Rd
Minimum Vertical Clearance: 7.16m (23.49ft),  Kilometerpoint: 7.612,  Lanes on structure: 4,  Lanes under structure: 7,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 23.5m (77.1ft)

Find on map >>   Show street view

Structure Number: 11354,  Location: 0.3 mi S Jct SR 210 (Lat: 32.206500,  Lng: -110.949500),  Route carried "under" structure: City street ,  Year Built: 2015,  Structure Length: 0. m,  Average Daily Traffic: 33,373 (year 2020),  Truck Traffic: 10%,  Features Intersected: 22nd Street,  Facility Carried by Structure: Kino Parkway
Minimum Vertical Clearance: 5.43m (17.81ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 54.6m (179.1ft)

Find on map >>   Show street view

Structure Number: 11371,  Location: 0.3 mi S Jct SR 210 (Lat: 32.206500,  Lng: -110.949700),  Route carried "under" structure: City street ,  Year Built: 2015,  Structure Length: 0. m,  Average Daily Traffic: 33,373 (year 2020),  Truck Traffic: 10%,  Features Intersected: 22nd Street,  Facility Carried by Structure: Kino Parkway
Minimum Vertical Clearance: 5.43m (17.81ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 54.6m (179.1ft)

Find on map >>   Show street view

Structure Number: 11551,  Location: Ruthrauff Rd (Lat: 32.294200,  Lng: -111.026900),  Route carried "under" structure: City street ,  Year Built: 2021,  Structure Length: 0. m,  Average Daily Traffic: 200 (year 2021),  Truck Traffic: 5%,  Features Intersected: Davis Avenue,  Facility Carried by Structure: Ruthrauff Rd
Minimum Vertical Clearance: 0.00m,  Kilometerpoint: 0.000,  Lanes on structure: 5,  Lanes under structure: 2,  Material/Design: Concrete,  Design/Construction: Frame,  Length of Maximum Span: 12.8m (42.0ft)

Find on map >>   Show street view

Structure Number: 20059,  Location: 1.50 mi S Jct I-10 (Lat: 32.177800,  Lng: -110.986000),  Route carried "under" structure: Interstate 19,  Year Built: 2017,  Structure Length: 0. m,  Average Daily Traffic: 91,729 (year 2018),  Truck Traffic: 19%,  Features Intersected: I-19,  Facility Carried by Structure: Ajo Way
Minimum Vertical Clearance: 5.45m (17.88ft),  Kilometerpoint: 99.618,  Lanes on structure: 8,  Lanes under structure: 8,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 33.2m (108.9ft)

Find on map >>   Show street view

Structure Number: 20092,  Location: I -19 MP 61.4 (Lat: 32.170900,  Lng: -110.985500),  Route carried "under" structure: Interstate 19,  Year Built: 2019,  Structure Length: 0. m,  Average Daily Traffic: 91,729 (year 2020),  Truck Traffic: 19%,  Features Intersected: I-19,  Facility Carried by Structure: Pedestrian Crossin
Minimum Vertical Clearance: 5.45m (17.88ft),  Kilometerpoint: 98.814,  Material/Design: Steel,  Design/Construction: Truss - Thru,  Length of Maximum Span: 44.2m (145.0ft)

Find on map >>   Show street view

Structure Number: 20094,  Location: 11.4 mi N Jct I-19 (Lat: 32.337600,  Lng: -111.066900),  Route carried "under" structure: Interstate 10,  Year Built: 2018,  Structure Length: 0. m,  Average Daily Traffic: 84,665 (year 2018),  Truck Traffic: 19%,  Features Intersected: I-10,  Facility Carried by Structure: Ina Rd
Minimum Vertical Clearance: 6.59m (21.62ft),  Kilometerpoint: 400.276,  Lanes on structure: 7,  Lanes under structure: 6,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 43.6m (143.0ft)

Find on map >>   Show street view

Structure Number: 20159,  Location: 7.8 mi N Jct I-19 (Lat: 32.294200,  Lng: -111.029700),  Route carried "under" structure: Interstate 10,  Year Built: 2019,  Structure Length: 0. m,  Average Daily Traffic: 111,062 (year 2020),  Truck Traffic: 13%,  Features Intersected: I-10,  Facility Carried by Structure: Ruthrauff Rd
Minimum Vertical Clearance: 5.38m (17.65ft),  Kilometerpoint: 405.555,  Lanes on structure: 8,  Lanes under structure: 8,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 42.4m (139.1ft)

Find on map >>   Show street view

Structure Number: 20173,  Location: 15.1 mi E Jct I 19 (Lat: 32.061800,  Lng: -110.773500),  Route carried "under" structure: Interstate 10,  Year Built: 2021,  Structure Length: 0. m,  Average Daily Traffic: 37,380 (year 2020),  Truck Traffic: 20%,  Features Intersected: I-10,  Facility Carried by Structure: Houghton Rd
Minimum Vertical Clearance: 5.55m (18.21ft),  Kilometerpoint: 443.310,  Lanes on structure: 7,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 36.6m (120.1ft)

Discuss Tucson, Arizona (AZ) on our hugely popular Arizona forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.