Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Anaheim, California (CA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 285Number of bridges
  • 4,925ft / 1,501mTotal length
  • $11,835,000Total costs
  • 26,273,322Total average daily traffic
  • 1,612,373Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Anaheim
  • No street view available for this location

New bridges in Anaheim, CA - historical statistics
  • New bridges - historical statistics
  • 11920-1929
  • 261950-1959
  • 451960-1969
  • 551970-1979
  • 51980-1989
  • 521990-1999
  • 922000-2009
  • 92010-2019
Reconstructed bridges in Anaheim, CA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11940-1949
  • 11950-1959
  • 41960-1969
  • 31970-1979
  • 51980-1989
  • 51990-1999
  • 82000-2009
  • 42010-2019
Average Bridge Daily Traffic in Anaheim, CA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 61.1%Good
  • 0.8%Satisfactory
  • 36.5%Fair
  • 1.6%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 80.3%Good
  • 3.1%Satisfactory
  • 16.5%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 75.6%Good
  • 0.8%Satisfactory
  • 23.6%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 14.3%Excellent
  • 82.1%Very good
  • 3.6%Good
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 96.0%Good
  • 4.0%Satisfactory
Find on map >>   Show street view

Structure Number: 55 0858,  Location: 12-ORA-091-3.51-ANA (Lat: 33.854433,  Lng: -117.920061),  Route carried "under" structure: State highway 91,  Year Built: 1999,  Structure Length: 0. m,  Average Daily Traffic: 268,000 (year 2011),  Truck Traffic: 8%,  Features Intersected: STATE ROUTE 91,  Facility Carried by Structure: LEMON STREET
Minimum Vertical Clearance: 5.48m (17.98ft),  Kilometerpoint: 3.510,  Lanes on structure: 7,  Lanes under structure: 10,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 26.0m (85.3ft)

Find on map >>   Show street view

Structure Number: 55 0859,  Location: 12-ORA-005-37.40-ANA (Lat: 33.814583,  Lng: -117.915156),  Route carried "under" structure: Interstate 5,  Year Built: 2000,  Structure Length: 0. m,  Average Daily Traffic: 264,800 (year 2016),  Truck Traffic: 7%,  Features Intersected: INTERSTATE 5,  Facility Carried by Structure: HARBOR BLVD
Minimum Vertical Clearance: 5.51m (18.08ft),  Kilometerpoint: 37.400,  Lanes on structure: 8,  Lanes under structure: 13,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 70.6m (231.6ft)

Find on map >>   Show street view

Structure Number: 55 086,  Location: 12-ORA-005-38.48-ANA (Lat: 33.827525,  Lng: -117.927642),  Route carried "under" structure: Interstate 5,  Year Built: 2000,  Structure Length: 0. m,  Average Daily Traffic: 276,300 (year 2016),  Truck Traffic: 7%,  Features Intersected: INTERSTATE 5,  Facility Carried by Structure: SANTA ANA STREET
Minimum Vertical Clearance: 6.07m (19.91ft),  Kilometerpoint: 38.480,  Lanes on structure: 3,  Lanes under structure: 13,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 41.7m (136.8ft)

Find on map >>   Show street view

Structure Number: 55 0901,  Location: 12-ORA-005-40.93-ANA (Lat: 33.846786,  Lng: -117.963506),  Route carried "under" structure: Interstate 5,  Year Built: 2002,  Structure Length: 0. m,  Average Daily Traffic: 259,800 (year 2016),  Truck Traffic: 9%,  Features Intersected: INTERSTATE 5,RAMPS,UP RR,  Facility Carried by Structure: LA PALMA AVE
Minimum Vertical Clearance: 6.78m (22.24ft),  Kilometerpoint: 40.930,  Lanes on structure: 6,  Lanes under structure: 10,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 99.4m (326.1ft)

Find on map >>   Show street view

Structure Number: 55 0902S,  Location: 12-ORA-005-40.55-ANA (Lat: 33.844442,  Lng: -117.957914),  Route carried "under" structure: Interstate 5,  Year Built: 2002,  Structure Length: 0. m,  Average Daily Traffic: 259,800 (year 2016),  Truck Traffic: 9%,  Features Intersected: INTERSTATE 5, RAMP
Minimum Vertical Clearance: 6.19m (20.31ft),  Kilometerpoint: 40.550,  Lanes on structure: 2,  Lanes under structure: 10,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 80.0m (262.5ft)

Find on map >>   Show street view

Structure Number: 55 0904,  Location: 12-ORA-005-40.72-ANA (Lat: 33.845003,  Lng: -117.958725),  Route carried "under" structure: Interstate 5,  Year Built: 2002,  Structure Length: 0. m,  Average Daily Traffic: 259,800 (year 2016),  Truck Traffic: 9%,  Features Intersected: INTERSTATE 5, RAMP,  Facility Carried by Structure: BROOKHURST STREET
Minimum Vertical Clearance: 6.68m (21.92ft),  Kilometerpoint: 40.720,  Lanes on structure: 7,  Lanes under structure: 11,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 57.2m (187.7ft)

Find on map >>   Show street view

Structure Number: 55 0941F,  Location: 12-ORA-091-R15.90-ANA (Lat: 33.862811,  Lng: -117.716636),  Route carried "under" structure: Ramp State highway 241,  Year Built: 1998,  Structure Length: 0. m,  Average Daily Traffic: 5,200 (year 2014),  Truck Traffic: 5%,  Features Intersected: N241-W91 CONNECTOR
Minimum Vertical Clearance: 5.30m (17.39ft),  Kilometerpoint: 39.000,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 62.0m (203.4ft)

Find on map >>   Show street view

Structure Number: 55 0960S,  Location: 12-ORA-005-35.00-ANA (Lat: 33.790000,  Lng: -117.887408),  Route carried "under" structure: Ramp Interstate 5,  Year Built: 2000,  Structure Length: 0. m,  Average Daily Traffic: 1,001 (year 2016),  Truck Traffic: 3%,  Features Intersected: CHAPMAN AVE-N5 ON-RAMP
Minimum Vertical Clearance: 6.02m (19.75ft),  Kilometerpoint: 35.000,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 61.0m (200.1ft)

Find on map >>   Show street view

Structure Number: 55 1064,  Location: 12-ORA-090-12.25 (Lat: 33.863033,  Lng: -117.790650),  Route carried "under" structure: City street ,  Year Built: 2010,  Structure Length: 0. m,  Average Daily Traffic: 30,000 (year 2011),  Truck Traffic: 2%,  Features Intersected: ESPERANZA RD,BNSF,AMTRAK,  Facility Carried by Structure: STATE ROUTE 90
Minimum Vertical Clearance: 8.75m (28.71ft),  Kilometerpoint: 0.000,  Lanes on structure: 9,  Lanes under structure: 8,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 37.0m (121.4ft)

Find on map >>   Show street view

Structure Number: 55 1081,  Location: 12-ORA-022-R8.33-ANA (Lat: 33.770469,  Lng: -117.913456),  Route carried "under" structure: State highway 22,  Year Built: 2008,  Structure Length: 0. m,  Average Daily Traffic: 229,000 (year 2009),  Truck Traffic: 5%,  Features Intersected: STATE ROUTE 22,  Facility Carried by Structure: PEDESTRIAN WALKWAY
Minimum Vertical Clearance: 5.70m (18.70ft),  Kilometerpoint: 8.330,  Lanes under structure: 16,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 31.7m (104.0ft)

Find on map >>   Show street view

Structure Number: 55 1082,  Location: 12-ORA-022-R9.40-ANA (Lat: 33.778825,  Lng: -117.896661),  Route carried "under" structure: State highway 22,  Year Built: 2008,  Structure Length: 0. m,  Average Daily Traffic: 250,000 (year 2020),  Truck Traffic: 3%,  Features Intersected: STATE ROUTE 22,  Facility Carried by Structure: LEWIS ST
Minimum Vertical Clearance: 5.28m (17.32ft),  Kilometerpoint: 9.400,  Lanes on structure: 4,  Lanes under structure: 12,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 33.3m (109.3ft)

Find on map >>   Show street view

Structure Number: 55 1085G,  Location: 12-ORA-022-R10.66-ANA (Lat: 33.778000,  Lng: -117.873519),  Route carried "under" structure: Ramp Interstate 5,  Year Built: 2008,  Structure Length: 0. m,  Average Daily Traffic: 13,000 (year 2020),  Truck Traffic: 3%,  Features Intersected: N5-W22 CONNECTOR RAMP
Minimum Vertical Clearance: 6.14m (20.14ft),  Kilometerpoint: 33.840,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 45.0m (147.6ft)

Find on map >>   Show street view

Structure Number: 55 1087F,  Location: 12-ORA-005-34.53-ANA (Lat: 33.779456,  Lng: -117.889158),  Route carried "under" structure: City street ,  Year Built: 2008,  Structure Length: 0. m,  Average Daily Traffic: 34,000 (year 2018),  Truck Traffic: 2%,  Features Intersected: THE CITY DRIVE,  Facility Carried by Structure: S5&S57-W22 CONNECT
Minimum Vertical Clearance: 9.49m (31.14ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 7,  Material/Design: Concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 55.8m (183.1ft)

Find on map >>   Show street view

Structure Number: 55C007,  Location: 0.2 MI E/O STATE COLLEGE (Lat: 33.804556,  Lng: -117.885372),  Route carried "under" structure: City street ,  Year Built: 1967,  Structure Length: 0. m,  Average Daily Traffic: 35,600 (year 2012),  Truck Traffic: 4%,  Features Intersected: KATELLA AVENUE,  Facility Carried by Structure: BNSF RR, METROLINK
Minimum Vertical Clearance: 4.60m (15.09ft),  Kilometerpoint: 0.000,  Lanes under structure: 6,  Material/Design: Concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 18.3m (60.0ft)

Find on map >>   Show street view

Structure Number: 55C0471,  Location: 0.4 MI. S/O BALL ROAD (Lat: 33.813289,  Lng: -117.898250),  Route carried "under" structure: City street ,  Year Built: 1972,  Structure Length: 0. m,  Average Daily Traffic: 6,500 (year 2008),  Truck Traffic: 8%,  Features Intersected: LEWIS STREET,  Facility Carried by Structure: UP RR & METRO LINK
Minimum Vertical Clearance: 5.08m (16.67ft),  Kilometerpoint: 0.000,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 28.7m (94.2ft)

Find on map >>   Show street view

Structure Number: 55C0559,  Location: 0.5 MI. E/O ANAHEIM BLVD (Lat: 33.837369,  Lng: -117.906447),  Route carried "under" structure: City street ,  Year Built: 1988,  Structure Length: 0. m,  Average Daily Traffic: 22,700 (year 2009),  Truck Traffic: 5%,  Features Intersected: LINCOLN AVENUE,  Facility Carried by Structure: BNSF RR, METROLINK
Minimum Vertical Clearance: 4.72m (15.49ft),  Kilometerpoint: 0.000,  Lanes under structure: 6,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 17.7m (58.1ft)

Find on map >>   Show street view

Structure Number: 55C0673,  Location: AT BALL ROAD (Lat: 33.817167,  Lng: -117.922056),  Route carried "under" structure: City street ,  Year Built: 2000,  Structure Length: 0. m,  Average Daily Traffic: 44,200 (year 2019),  Truck Traffic: 1%,  Features Intersected: BALL ROAD,  Facility Carried by Structure: DISNEYLAND FLYOVER
Minimum Vertical Clearance: 5.40m (17.72ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 10,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 70.0m (229.7ft)

Find on map >>   Show street view

Structure Number: 55C0676,  Location: 0.5 MI N/O KATELLA AVENUE (Lat: 33.808950,  Lng: -117.924217),  Route carried "under" structure: City street ,  Year Built: 2000,  Structure Length: 0. m,  Average Daily Traffic: 10,000 (year 2020),  Truck Traffic: 1%,  Features Intersected: DISNEYLAND DRIVE,  Facility Carried by Structure: DOWNTOWN DISNY POC
Minimum Vertical Clearance: 4.26m (13.98ft),  Kilometerpoint: 0.000,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 16.2m (53.1ft)

Find on map >>   Show street view

Structure Number: 55C0692,  Location: .17 MI E OF N MILTON ST (Lat: 33.843661,  Lng: -117.876650),  Route carried "under" structure: State highway 57,  Year Built: 1974,  Structure Length: 0. m,  Average Daily Traffic: 229,000 (year 2009),  Truck Traffic: 8%,  Features Intersected: STATE ROUTE 57,  Facility Carried by Structure: PEDESTRIAN WALKWAY
Minimum Vertical Clearance: 5.68m (18.64ft),  Kilometerpoint: 15.180,  Lanes under structure: 13,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 35.1m (115.2ft)

Find on map >>   Show street view

Structure Number: 55C0707,  Location: 0.1 MILE N/O CROWTHER AVE (Lat: 33.868544,  Lng: -117.863319),  Route carried "under" structure: Business City street ,  Year Built: 2014,  Structure Length: 0. m,  Average Daily Traffic: 21,000 (year 2017),  Truck Traffic: 2%,  Features Intersected: KRAEMER BLVD,  Facility Carried by Structure: BNSF RR TRACKS
Minimum Vertical Clearance: 5.10m (16.73ft),  Kilometerpoint: 0.000,  Lanes under structure: 7,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 20.6m (67.6ft)

Find on map >>   Show street view

Structure Number: 55C0715,  Location: 1 M N/O ROUTE 91 (Lat: 33.866269,  Lng: -117.818356),  Route carried "under" structure: City street ,  Year Built: 2017,  Structure Length: 0. m,  Average Daily Traffic: 8,900 (year 2018),  Truck Traffic: 2%,  Features Intersected: RR AND ORANGTHROPE AVE,  Facility Carried by Structure: LAKEVIEW AVE
Minimum Vertical Clearance: 6.70m (21.98ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 5,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 41.1m (134.8ft)

Discuss Anaheim, California (CA) on our hugely popular California forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.